M180 eastbound Jct 4 to Jct 5 Hardshoulder closure (40/2 40/6)
PlannedM180 eastbound Jct 4 to Jct 5 Hardshoulder closure (40/2 40/6)
- Start time
- Mon, Aug 24, 2026 8:00 AM
- Expected end
- Mon, Aug 24, 2026 2:00 PM
- Duration
- 6 hours
- Road
- M180 – M180 Eastbound Between J4 And J5
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 6, 2026 8:57 AM
- Last updated
- Mon, Aug 24, 2026 9:02 AM
- Cleared
- Mon, Aug 24, 2026 2:00 PM
- Latest update: M180 eastbound Jct 4 to Jct 5 Hardshoulder closure (40/2 40/6)
- Coordinates
- 53.584468, -0.420341
- Latitude span
- 53.584114 – 53.585093
- Longitude span
- -0.422459 – -0.416754
- Bounding box centre
- 53.584604, -0.419607
- Location descriptions
-
- M180 eastbound between J4 and J5
- M180 eastbound within J5
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 24, 2026 8:00 AM
- Overall feed end
- Mon, Aug 24, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M180 eastbound between J4 and J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M180
- Linear Element Model
- The Network Model
- Linear Element Id
- {8F96F8FA-B460-49FC-A298-C949C8AC72AF}
- Linear Element Type
- A Carriageway
- From Distance
- 931 m
- To Distance
- 985 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.584114 -0.422459 53.584116 -0.422442 53.584241 -0.421673
Segment 2
6 coordinate pairs- Description
- M180 eastbound within J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M180
- Linear Element Model
- The Network Model
- Linear Element Id
- {2EAE3D08-554A-4786-BFE4-9D77348F9D40}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 339 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.584241 -0.421673 53.584248 -0.421596 53.584427 -0.420503 53.584665 -0.419056 53.585064 -0.416916 53.585093 -0.416754
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -0.422459, 53.584114
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.422459,
53.584114
],
[
-0.422442,
53.584116
],
[
-0.421673,
53.584241
],
[
-0.421673,
53.584241
],
[
-0.421596,
53.584248
],
[
-0.420503,
53.584427
],
[
-0.419056,
53.584665
],
[
-0.416916,
53.585064
],
[
-0.416754,
53.585093
]
]
]
}
View road section coordinates
[
[
[
-0.422459,
53.584114
],
[
-0.422442,
53.584116
],
[
-0.421673,
53.584241
],
[
-0.421673,
53.584241
],
[
-0.421596,
53.584248
],
[
-0.420503,
53.584427
],
[
-0.419056,
53.584665
],
[
-0.416916,
53.585064
],
[
-0.416754,
53.585093
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 6, 2026 8:57 AM
- Record versioned
- Mon, Aug 24, 2026 9:02 AM
- Coordinate source
- Geometry
Driving on the M180? See every live closure, roadwork and planned restriction on this road.
M180 live closuresRelated incidents
M180 eastbound Jct 2 to Jct 3 lane 1 closure (15/0 - 18/5)
Cleared Roadworks National HighwaysExpected to clear in 9 hours 49 minutes
M180 eastbound Jct 2 to Jct 3 lane 1 closure (15/0 - 18/5)
A160 eastbound Harbrough to Manby Lane 2 closure
Cleared Roadworks National HighwaysCleared 4 days 4 hours ago
A160 eastbound Harbrough to Manby Lane 2 closure
M180 westbound Jct 1 entry slip Lane 1 closure
Cleared Roadworks National HighwaysCleared 6 days 13 hours ago
M180 westbound Jct 1 entry slip Lane 1 closure
M180 eastbound Jct 2 to Jct 3 lane 2 and 3 closure (15/0 - 18/5)
Cleared Roadworks National HighwaysCleared 1 week 4 hours ago
M180 eastbound Jct 2 to Jct 3 lane 2 and 3 closure (15/0 - 18/5)
M180 eastbound Jct 3 to Jct 4 lane 2 closure (21/6 23/8)
Cleared Roadworks National HighwaysCleared 1 week 2 days ago
M180 eastbound Jct 3 to Jct 4 lane 2 closure (21/6 23/8)
M180 eastbound Jct 3 to Jct 4 lane 1 closure (21/6 23/8)
Cleared Roadworks National HighwaysCleared 1 week 3 days ago
M180 eastbound Jct 3 to Jct 4 lane 1 closure (21/6 23/8)