M18 northbound Jct 1 hard shoulder closure ( 254/3 254/6)
ClearedM18 northbound Jct 1 hard shoulder closure ( 254/3 254/6)
- Start time
- Thu, Dec 18, 2025 9:00 PM
- Expected end
- Fri, Dec 19, 2025 5:00 AM
- Duration
- 8 hours
- Road
- M18 – M18 Northbound Between M1 And J1
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Dec 18, 2025 1:08 AM
- Last updated
- Thu, Dec 18, 2025 8:19 PM
- Cleared
- Fri, Dec 19, 2025 5:00 AM
- Latest update: M18 northbound Jct 1 hard shoulder closure ( 254/3 254/6)
- Coordinates
- 53.417538, -1.254652
- Latitude span
- 53.416744 – 53.419184
- Longitude span
- -1.255001 – -1.253908
- Bounding box centre
- 53.417964, -1.254455
- Location descriptions
-
- M18 northbound between M1 and J1
- Feed validity status
- Planned
- Overall feed start
- Thu, Dec 18, 2025 9:00 PM
- Overall feed end
- Fri, Dec 19, 2025 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M18 northbound between M1 and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M18
- Linear Element Model
- The Network Model
- Linear Element Id
- {21D49867-C600-4FE6-B939-B8E2BAF47F6A}
- Linear Element Type
- A Carriageway
- From Distance
- 1,152 m
- To Distance
- 1,165 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.416744 -1.255001 53.416864 -1.254953
Segment 2
5 coordinate pairs- Description
- M18 northbound between M1 and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M18
- Linear Element Model
- The Network Model
- Linear Element Id
- {BAC14483-3655-4DD1-892E-6178A10B420B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 267 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.416864 -1.254953 53.417097 -1.254862 53.417106 -1.254858 53.418908 -1.254029 53.419184 -1.253908
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.255001, 53.416744
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.255001,
53.416744
],
[
-1.254953,
53.416864
],
[
-1.254953,
53.416864
],
[
-1.254862,
53.417097
],
[
-1.254858,
53.417106
],
[
-1.254029,
53.418908
],
[
-1.253908,
53.419184
]
]
]
}
View road section coordinates
[
[
[
-1.255001,
53.416744
],
[
-1.254953,
53.416864
],
[
-1.254953,
53.416864
],
[
-1.254862,
53.417097
],
[
-1.254858,
53.417106
],
[
-1.254029,
53.418908
],
[
-1.253908,
53.419184
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Dec 18, 2025 1:08 AM
- Record versioned
- Thu, Dec 18, 2025 8:19 PM
- Coordinate source
- Geometry
Driving on the M18? See every live closure, roadwork and planned restriction on this road.
M18 live closuresRelated incidents
M1 northbound Jct 30 to Jct 31 Lane 3 and 4 closure (241/5 243/6)
Planned Roadworks National HighwaysStarts in 2 hours 15 minutes
M1 northbound Jct 30 to Jct 31 Lane 3 and 4 closure (241/5 243/6)
M18 northbound Jct 2 exit slip lane 1 closure
Cleared Roadworks National HighwaysCleared 4 days 11 hours ago
M18 northbound Jct 2 exit slip lane 1 closure
A1M northbound Jct 35 entry slip road closure
Cleared Roadworks National HighwaysCleared 4 days 11 hours ago
A1M northbound Jct 35 entry slip road closure
M1 northbound Jct 32 to Jct 33 hard shoulder closure ( 249/3 250/7)
Cleared Roadworks National HighwaysCleared 4 days 11 hours ago
M1 northbound Jct 32 to Jct 33 hard shoulder closure ( 249/3 250/7)
A1M northbound Jct 35 entry slip road closure
Cleared Roadworks National HighwaysCleared 5 days 11 hours ago
A1M northbound Jct 35 entry slip road closure
M18 northbound Jct 2 exit slip lane 1 closure
Cleared Roadworks National HighwaysCleared 5 days 11 hours ago
M18 northbound Jct 2 exit slip lane 1 closure