M11 northbound Jct 7 to Jct 8 mobile lane closures (MP 30/6 to 47/4)
ClearedM11 northbound Jct 7 to Jct 8 mobile lane closures (MP 30/6 to 47/4)
- Start time
- Thu, May 14, 2026 8:00 PM
- Expected end
- Fri, May 15, 2026 4:00 AM
- Duration
- 8 hours
- Road
- M11 – M11 Northbound Between J7A And J8
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 14, 2026 7:44 AM
- Last updated
- Thu, May 14, 2026 8:42 PM
- Cleared
- Fri, May 15, 2026 4:00 AM
- Latest update: M11 northbound Jct 7 to Jct 8 mobile lane closures (MP 30/6 to 47/4)
- Coordinates
- 51.867896, 0.195900
- Latitude span
- 51.862838 – 51.871243
- Longitude span
- 0.192088 – 0.198005
- Bounding box centre
- 51.867041, 0.195047
- Location descriptions
-
- M11 northbound between J7A and J8
- M11 J8 northbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, May 14, 2026 8:00 PM
- Overall feed end
- Fri, May 15, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M11 northbound between J7A and J8
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M11
- Linear Element Model
- The Network Model
- Linear Element Id
- {81819C7C-081B-4544-A831-AC4D723D85D2}
- Linear Element Type
- A Carriageway
- From Distance
- 87 m
- To Distance
- 325 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.862838 0.192088 51.863273 0.192513 51.864007 0.193173 51.864708 0.193759
Segment 2
14 coordinate pairs- Description
- M11 J8 northbound exit
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M11
- Linear Element Model
- The Network Model
- Linear Element Id
- {E804D6FA-33FD-4CBC-AF4A-A6C04290053F}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 787 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.864708 0.193759 51.866213 0.194863 51.866935 0.195364 51.867256 0.195583 51.867541 0.195787 51.868359 0.196366 51.870023 0.19749 51.870361 0.197695 51.870715 0.197906 51.87084 0.197973 51.870911 0.198004 51.871036 0.198005 51.871154 0.197959 51.871243 0.197915
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- 0.192088, 51.862838
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.192088,
51.862838
],
[
0.192513,
51.863273
],
[
0.193173,
51.864007
],
[
0.193759,
51.864708
],
[
0.193759,
51.864708
],
[
0.194863,
51.866213
],
[
0.195364,
51.866935
],
[
0.195583,
51.867256
],
[
0.195787,
51.867541
],
[
0.196366,
51.868359
],
[
0.19749,
51.870023
],
[
0.197695,
51.870361
],
[
0.197906,
51.870715
],
[
0.197973,
51.87084
],
[
0.198004,
51.870911
],
[
0.198005,
51.871036
],
[
0.197959,
51.871154
],
[
0.197915,
51.871243
]
]
]
}
View road section coordinates
[
[
[
0.192088,
51.862838
],
[
0.192513,
51.863273
],
[
0.193173,
51.864007
],
[
0.193759,
51.864708
],
[
0.193759,
51.864708
],
[
0.194863,
51.866213
],
[
0.195364,
51.866935
],
[
0.195583,
51.867256
],
[
0.195787,
51.867541
],
[
0.196366,
51.868359
],
[
0.19749,
51.870023
],
[
0.197695,
51.870361
],
[
0.197906,
51.870715
],
[
0.197973,
51.87084
],
[
0.198004,
51.870911
],
[
0.198005,
51.871036
],
[
0.197959,
51.871154
],
[
0.197915,
51.871243
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 14, 2026 7:44 AM
- Record versioned
- Thu, May 14, 2026 8:42 PM
- Coordinate source
- Geometry
Driving on the M11? See every live closure, roadwork and planned restriction on this road.
M11 live closuresRelated incidents
M11 northbound Jct 8 to 9A mobile lane closures (MP 45/7 to 67/8)
Planned Roadworks National HighwaysStarts in 18 hours 22 minutes
M11 northbound Jct 8 to 9A mobile lane closures (MP 45/7 to 67/8)
M11 northbound Jct 14 lane 1 closure (MP 88/4 to 90/8)
Cleared Roadworks National HighwaysExpected to clear in 1 day 2 hours
M11 northbound Jct 14 lane 1 closure (MP 88/4 to 90/8)
A120 eastbound Stansted to Takeley carriageway closure
Planned Roadworks National HighwaysStarts in 17 hours 22 minutes
A120 eastbound Stansted to Takeley carriageway closure
M11 northbound Jct 6 to Jct 8 mobile hard shoulder closure (MP 24/6 to 45/7)
Planned Roadworks National HighwaysStarts in 6 hours 52 minutes
M11 northbound Jct 6 to Jct 8 mobile hard shoulder closure (MP 24/6 to 45/7)
M11 Northbound Jct 5 to Jct 6 lane 3,2 closure
Cleared Roadworks National HighwaysCleared 1 day 23 hours ago
M11 Northbound Jct 5 to Jct 6 lane 3,2 closure
A11 southbound A505 Jct to M11 Jct 9A entry slip carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 5 hours ago
A11 southbound A505 Jct to M11 Jct 9A entry slip carriageway closure