M11 Northbound Jct 5 to Jct 6 lane 1 closure

Cleared

M11 Northbound Jct 5 to Jct 6 lane 1 closure

Start time
Fri, Aug 14, 2026 10:00 PM
Expected end
Sat, Aug 15, 2026 4:30 AM
Duration
1 second
Road
M11 – M11 Northbound Between J5 And J6
Category
Road Maintenance
Direction
Northbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 3 lanes affected
Reason
Other
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Aug 13, 2026 9:01 PM
Last updated
Fri, Aug 14, 2026 3:10 AM
Cleared
Fri, Aug 14, 2026 10:00 PM
  • Latest update: M11 Northbound Jct 5 to Jct 6 lane 1 closure
Coordinates
51.670724, 0.118248
Latitude span
51.670086 – 51.671405
Longitude span
0.117810 – 0.118697
Bounding box centre
51.670746, 0.118254
Location descriptions
  • M11 northbound between J5 and J6
Feed validity status
Planned
Overall feed start
Fri, Aug 14, 2026 10:00 PM
Overall feed end
Sat, Aug 15, 2026 4:30 AM
Feed window length
6 hours 30 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M11 northbound between J5 and J6
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
North Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M11
Linear Element Model
The Network Model
Linear Element Id
{1D0A522A-906F-41AC-B9C7-6FCD2F851DFB}
Linear Element Type
A Carriageway
From Distance
135 m
To Distance
178 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.670086 0.11781
51.67044 0.118062

Segment 2

4 coordinate pairs
Description
M11 northbound between J5 and J6
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
North Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M11
Linear Element Model
The Network Model
Linear Element Id
{9DFEB6EF-7B85-429C-B179-BE02DADAF9FF}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
116 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.67044 0.118062
51.670662 0.118217
51.671313 0.118638
51.671405 0.118697
Geometry type
MultiLineString
Geometry points
6
First coordinate pair
0.117810, 51.670086
Road section segments
1
Road section points
6
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                0.11781,
                51.670086
            ],
            [
                0.118062,
                51.67044
            ],
            [
                0.118062,
                51.67044
            ],
            [
                0.118217,
                51.670662
            ],
            [
                0.118638,
                51.671313
            ],
            [
                0.118697,
                51.671405
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            0.11781,
            51.670086
        ],
        [
            0.118062,
            51.67044
        ],
        [
            0.118062,
            51.67044
        ],
        [
            0.118217,
            51.670662
        ],
        [
            0.118638,
            51.671313
        ],
        [
            0.118697,
            51.671405
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Other
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Aug 13, 2026 9:01 PM
Record versioned
Fri, Aug 14, 2026 3:10 AM
Coordinate source
Geometry

Driving on the M11? See every live closure, roadwork and planned restriction on this road.

M11 live closures

Related incidents

M11 southbound Jct 11 hard shoulder closure (MP 83/4 to 81/8)

Planned Roadworks National Highways
Cambridge M11 · M11 Southbound Within J11

Expected to clear in 7 months 2 weeks

Started 1 Jun 2026, 20:00 Expected clear 3 Apr 2027, 05:00

M11 southbound Jct 11 hard shoulder closure (MP 83/4 to 81/8)

Category: Construction Work
View update

M25 Clockwise Jct 26 to Jct 27 Lane 4 Closure

Cleared Roadworks National Highways
Epping Forest M25 · M25 Clockwise Between J26 And J27

Cleared 7 minutes 25 seconds ago

Started 14 Aug 2026, 22:00 Ended 14 Aug 2026, 23:10

M25 Clockwise Jct 26 to Jct 27 Lane 4 Closure

Category: Road Maintenance
View update

M11 northbound Jct 7 to Jct 8 mobile hard shoulder closure and lane 2 and 3 closure

Cleared Roadworks National Highways
Epping Forest M11 · M11 Northbound Between J7 And J7A

Cleared 3 hours 17 minutes ago

Started 14 Aug 2026, 20:00 Ended 14 Aug 2026, 20:00

M11 northbound Jct 7 to Jct 8 mobile hard shoulder closure and lane 2 and 3 closure

Category: Road Maintenance
View update

M11 northbound Jct 6 to Jct 7 mobile hard shoulder closure and lane 2 and 3 closure

Cleared Roadworks National Highways
Epping Forest M11 · M11 Northbound Between J6 And J7

Cleared 23 hours 17 minutes ago

Started 13 Aug 2026, 22:09 Ended 14 Aug 2026, 00:00

M11 northbound Jct 6 to Jct 7 mobile hard shoulder closure and lane 2 and 3 closure

Category: Road Maintenance
View update

M11 Northbound Jct 6 exit slip road lane 1 closure

Cleared Roadworks National Highways
Epping Forest M11 · Link Road From M11 J6 Northbound To M25 J27

Cleared 1 day 2 hours ago

Started 13 Aug 2026, 21:00 Ended 13 Aug 2026, 21:00

M11 Northbound Jct 6 exit slip road lane 1 closure

Category: Road Maintenance
View update

M25 Clockwise Jct 26 to Jct 27 Lane 4 Closure

Cleared Roadworks National Highways
Epping Forest M25 · M25 Clockwise Between J26 And J27

Cleared 19 hours 47 minutes ago

Started 13 Aug 2026, 21:00 Ended 14 Aug 2026, 03:30

M25 Clockwise Jct 26 to Jct 27 Lane 4 Closure

Category: Road Maintenance
View update