M1 southbound to M62 eastbound Jct 29 entry slip road closure
ClearedM1 southbound to M62 eastbound Jct 29 entry slip road closure
- Start time
- Fri, Jul 10, 2026 7:00 PM
- Expected end
- Sat, Jul 11, 2026 5:00 AM
- Duration
- 7 hours 35 minutes 2 seconds
- Road
- M62 – M62 J29 Eastbound Access
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 10, 2026 6:49 PM
- Last updated
- Sat, Jul 11, 2026 2:14 AM
- Cleared
- Sat, Jul 11, 2026 2:35 AM
- Latest update: M1 southbound to M62 eastbound Jct 29 entry slip road closure
- Coordinates
- 53.731410, -1.510105
- Latitude span
- 53.730557 – 53.732139
- Longitude span
- -1.510546 – -1.508730
- Bounding box centre
- 53.731348, -1.509638
- Location descriptions
-
- M62 J29 eastbound access
- link road from M1 J42 southbound exit to M62 J29 roundabout
- roundabout at M1 J42/M62 J29
- Feed validity status
- Active
- Overall feed start
- Fri, Jul 10, 2026 7:00 PM
- Overall feed end
- Sat, Jul 11, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M62 J29 eastbound access
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {8A8C7878-9AFF-4252-9C31-8F0C6CEF4C4F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 122 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.731255 -1.510097 53.731119 -1.509962 53.731038 -1.509872 53.730911 -1.509692 53.730776 -1.509436 53.730667 -1.509164 53.730557 -1.50873
Segment 2
4 coordinate pairs- Description
- link road from M1 J42 southbound exit to M62 J29 roundabout
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {04D1FA4F-C60F-431D-ABD8-2B6B44F243A2}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 40 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.731894 -1.510514 53.731706 -1.510471 53.731625 -1.510442 53.731543 -1.510367
Segment 3
4 coordinate pairs- Description
- link road from M1 J42 southbound exit to M62 J29 roundabout
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {B06ECD85-123D-469C-8D88-2FB98BAA5DFC}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 821 m
- To Distance
- 848 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.732139 -1.510546 53.732083 -1.510542 53.731984 -1.510528 53.731894 -1.510514
Segment 4
6 coordinate pairs- Description
- roundabout at M1 J42/M62 J29
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {4E771E74-17C2-4AD6-AB77-83EE3AE37AB4}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 36 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.731543 -1.510367 53.731516 -1.510337 53.731426 -1.510232 53.73135 -1.510159 53.731326 -1.510143 53.731255 -1.510097
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -1.510097, 53.731255
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.510097,
53.731255
],
[
-1.509962,
53.731119
],
[
-1.509872,
53.731038
],
[
-1.509692,
53.730911
],
[
-1.509436,
53.730776
],
[
-1.509164,
53.730667
],
[
-1.50873,
53.730557
],
[
-1.510514,
53.731894
],
[
-1.510471,
53.731706
],
[
-1.510442,
53.731625
],
[
-1.510367,
53.731543
],
[
-1.510546,
53.732139
],
[
-1.510542,
53.732083
],
[
-1.510528,
53.731984
],
[
-1.510514,
53.731894
],
[
-1.510367,
53.731543
],
[
-1.510337,
53.731516
],
[
-1.510232,
53.731426
],
[
-1.510159,
53.73135
],
[
-1.510143,
53.731326
],
[
-1.510097,
53.731255
]
]
]
}
View road section coordinates
[
[
[
-1.510097,
53.731255
],
[
-1.509962,
53.731119
],
[
-1.509872,
53.731038
],
[
-1.509692,
53.730911
],
[
-1.509436,
53.730776
],
[
-1.509164,
53.730667
],
[
-1.50873,
53.730557
],
[
-1.510514,
53.731894
],
[
-1.510471,
53.731706
],
[
-1.510442,
53.731625
],
[
-1.510367,
53.731543
],
[
-1.510546,
53.732139
],
[
-1.510542,
53.732083
],
[
-1.510528,
53.731984
],
[
-1.510514,
53.731894
],
[
-1.510367,
53.731543
],
[
-1.510337,
53.731516
],
[
-1.510232,
53.731426
],
[
-1.510159,
53.73135
],
[
-1.510143,
53.731326
],
[
-1.510097,
53.731255
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 12
- Record created
- Fri, Jul 10, 2026 6:49 PM
- Record versioned
- Sat, Jul 11, 2026 2:14 AM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 westbound Jct 37 entry slip lane closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 45 minutes
M62 westbound Jct 37 entry slip lane closure
M62 Eastbound Jct 10 exit slip road Lane 1 closure
Active Roadworks National HighwaysExpected to clear in 4 hours 45 minutes
M62 Eastbound Jct 10 exit slip road Lane 1 closure
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 7 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 2 months 4 days
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
Cleared Roadworks National HighwaysExpected to clear in 5 hours 45 minutes
M62 eastbound Jct 22 to Jct 23 Lane 1 closure (78/5 81/0)
M62 eastbound Jct 26 Lane 3 closure (100/4 101/9)
Cleared Roadworks National HighwaysExpected to clear in 5 hours 45 minutes
M62 eastbound Jct 26 Lane 3 closure (100/4 101/9)