M1 southbound Newport Pagnell exit slip road closure

Planned

M1 southbound Newport Pagnell exit slip road closure

Start time
Thu, Aug 13, 2026 9:00 PM
Expected end
Fri, Aug 14, 2026 4:00 AM
Duration
7 hours
Road
M1 – M1 Southbound At The Newport Pagnell Services Slip Road Between J15 And J14
Category
Construction Work
Direction
Southbound
Reason
Construction Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Jul 28, 2026 3:24 PM
Last updated
Thu, Aug 13, 2026 3:16 AM
Cleared
Fri, Aug 14, 2026 4:00 AM
  • Latest update: M1 southbound Newport Pagnell exit slip road closure
Coordinates
52.084371, -0.749628
Latitude span
52.084000 – 52.085188
Longitude span
-0.750791 – -0.749038
Bounding box centre
52.084594, -0.749915
Location descriptions
  • M1 southbound at the Newport Pagnell services slip road between J15 and J14
  • M1 southbound between J15 and J14
Feed validity status
Planned
Overall feed start
Thu, Aug 13, 2026 9:00 PM
Overall feed end
Fri, Aug 14, 2026 4:00 AM
Feed window length
7 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M1 southbound at the Newport Pagnell services slip road between J15 and J14
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M1
Linear Element Model
The Network Model
Linear Element Id
{66DF1049-3D30-4F16-C44D-A2EA5C75E5E4}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
0 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.084002 -0.749042
52.084 -0.749038

Segment 2

4 coordinate pairs
Description
M1 southbound at the Newport Pagnell services slip road between J15 and J14
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M1
Linear Element Model
The Network Model
Linear Element Id
{FDD87124-CAF6-4DF5-A5DB-F3DF512C8CA4}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
88 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.084572 -0.749942
52.084401 -0.749736
52.084233 -0.749489
52.084002 -0.749042

Segment 3

2 coordinate pairs
Description
M1 southbound between J15 and J14
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M1
Linear Element Model
The Network Model
Linear Element Id
{77A8CFF8-FD2F-48AF-A1E0-71D295F4897C}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
89 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.085188 -0.750791
52.084572 -0.749942
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
-0.749042, 52.084002
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.749042,
                52.084002
            ],
            [
                -0.749038,
                52.084
            ],
            [
                -0.749942,
                52.084572
            ],
            [
                -0.749736,
                52.084401
            ],
            [
                -0.749489,
                52.084233
            ],
            [
                -0.749042,
                52.084002
            ],
            [
                -0.750791,
                52.085188
            ],
            [
                -0.749942,
                52.084572
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.749042,
            52.084002
        ],
        [
            -0.749038,
            52.084
        ],
        [
            -0.749942,
            52.084572
        ],
        [
            -0.749736,
            52.084401
        ],
        [
            -0.749489,
            52.084233
        ],
        [
            -0.749042,
            52.084002
        ],
        [
            -0.750791,
            52.085188
        ],
        [
            -0.749942,
            52.084572
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Construction Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Jul 28, 2026 3:24 PM
Record versioned
Thu, Aug 13, 2026 3:16 AM
Coordinate source
Geometry

Driving on the M1? See every live closure, roadwork and planned restriction on this road.

M1 live closures

Related incidents

M1 Southbound Jct 5 to Jct 4 lane 3 closure

Planned Roadworks National Highways
Borehamwood M1 · M1 Southbound Between J5 And J4

Expected to clear in 8 minutes 44 seconds

Started 12 Aug 2026, 21:00 Expected clear 13 Aug 2026, 04:30

M1 Southbound Jct 5 to Jct 4 lane 3 closure

Category: Road Maintenance
View update

M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)

Planned Roadworks National Highways
Barnsley M1 · M1 Southbound Between J37 And J36

Expected to clear in 38 minutes 44 seconds

Started 12 Aug 2026, 19:00 Expected clear 13 Aug 2026, 05:00

M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)

Category: Road Maintenance
View update

Lane 1 closure southbound

Planned Roadworks National Highways
Leicester North M1 · M1 Southbound Between J23A And J23

Expected to clear in 38 minutes 44 seconds

Started 12 Aug 2026, 19:00 Expected clear 13 Aug 2026, 05:00

Lane 1 closure southbound

Category: Road Maintenance
View update

Lane 1,2 closure southbound

Planned Roadworks National Highways
Sutton-In-Ashfield M1 · M1 Southbound Between J29 And J28

Expected to clear in 38 minutes 44 seconds

Started 12 Aug 2026, 19:00 Expected clear 13 Aug 2026, 05:00

Lane 1,2 closure southbound

Category: Road Maintenance
View update

M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)

Active Roadworks National Highways
Luton M1 · M1 Northbound Within J10

Expected to clear in 2 months 1 week

Started 23 Jul 2026, 01:35 Expected clear 24 Oct 2026, 04:00

M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)

Category: Construction Work
View update

M1 northbound Jct 10 exit slip road closure

Planned Roadworks National Highways
Central Bedfordshire M1 · M1 J10 Northbound Exit

Starts in 16 hours 38 minutes

Starts 13 Aug 2026, 21:00 Expected clear 14 Aug 2026, 04:00

M1 northbound Jct 10 exit slip road closure

Category: Road Maintenance
View update