M1 southbound lane 1,2 closure (263/8 to 261/6)
PlannedM1 southbound lane 1,2 closure (263/8 to 261/6)
- Start time
- Thu, Aug 20, 2026 8:00 PM
- Expected end
- Fri, Aug 21, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M1 – M1 Southbound Between J35 And J34
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 5, 2026 11:02 AM
- Last updated
- Thu, Aug 20, 2026 11:19 AM
- Cleared
- Fri, Aug 21, 2026 5:00 AM
- Latest update: M1 southbound lane 1,2 closure (263/8 to 261/6)
- Coordinates
- 53.431880, -1.423292
- Latitude span
- 53.424345 – 53.439900
- Longitude span
- -1.436057 – -1.413690
- Bounding box centre
- 53.432123, -1.424874
- Location descriptions
-
- M1 southbound between J35 and J34
- M1 southbound within J34
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 20, 2026 8:00 PM
- Overall feed end
- Fri, Aug 21, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M1 southbound between J35 and J34
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {343E3798-3825-450F-B532-22D9EEB76B97}
- Linear Element Type
- B Carriageway
- From Distance
- 879 m
- To Distance
- 1,034 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.4399 -1.436057 53.439796 -1.435923 53.439389 -1.435365 53.439099 -1.434969 53.438823 -1.434585 53.438819 -1.434581
Segment 2
25 coordinate pairs- Description
- M1 southbound between J35 and J34
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {A78A9F67-1027-4058-A484-DF6E8843B808}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,554 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.438819 -1.434581 53.438439 -1.434044 53.437687 -1.43294 53.436945 -1.431746 53.436772 -1.431432 53.436464 -1.430894 53.436092 -1.430207 53.435784 -1.429654 53.435693 -1.429475 53.434832 -1.427846 53.434677 -1.427556 53.433709 -1.425738 53.433045 -1.424491 53.432555 -1.423571 53.43241 -1.423303 53.432156 -1.422779 53.431893 -1.422301 53.431738 -1.422002 53.431221 -1.421031 53.430496 -1.419701 53.430134 -1.419119 53.429862 -1.418717 53.42959 -1.418344 53.429419 -1.418136 53.429129 -1.417793
Segment 3
4 coordinate pairs- Description
- M1 southbound within J34
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {BBF983D4-2E83-4333-B165-1BBD6A59731F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 117 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.42524 -1.414626 53.425177 -1.414567 53.425068 -1.414478 53.424345 -1.41369
Segment 4
13 coordinate pairs- Description
- M1 southbound between J35 and J34
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {BB6C37E3-AFFC-4017-B011-C78D8D42C143}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 481 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.429129 -1.417793 53.429066 -1.417734 53.428795 -1.417452 53.428696 -1.417348 53.428362 -1.417051 53.427883 -1.416667 53.427126 -1.41612 53.426485 -1.415662 53.426293 -1.415519 53.426287 -1.415515 53.425926 -1.415234 53.425709 -1.415056 53.42524 -1.414626
- Geometry type
- MultiLineString
- Geometry points
- 48
- First coordinate pair
- -1.436057, 53.439900
- Road section segments
- 1
- Road section points
- 48
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.436057,
53.4399
],
[
-1.435923,
53.439796
],
[
-1.435365,
53.439389
],
[
-1.434969,
53.439099
],
[
-1.434585,
53.438823
],
[
-1.434581,
53.438819
],
[
-1.434581,
53.438819
],
[
-1.434044,
53.438439
],
[
-1.43294,
53.437687
],
[
-1.431746,
53.436945
],
[
-1.431432,
53.436772
],
[
-1.430894,
53.436464
],
[
-1.430207,
53.436092
],
[
-1.429654,
53.435784
],
[
-1.429475,
53.435693
],
[
-1.427846,
53.434832
],
[
-1.427556,
53.434677
],
[
-1.425738,
53.433709
],
[
-1.424491,
53.433045
],
[
-1.423571,
53.432555
],
[
-1.423303,
53.43241
],
[
-1.422779,
53.432156
],
[
-1.422301,
53.431893
],
[
-1.422002,
53.431738
],
[
-1.421031,
53.431221
],
[
-1.419701,
53.430496
],
[
-1.419119,
53.430134
],
[
-1.418717,
53.429862
],
[
-1.418344,
53.42959
],
[
-1.418136,
53.429419
],
[
-1.417793,
53.429129
],
[
-1.414626,
53.42524
],
[
-1.414567,
53.425177
],
[
-1.414478,
53.425068
],
[
-1.41369,
53.424345
],
[
-1.417793,
53.429129
],
[
-1.417734,
53.429066
],
[
-1.417452,
53.428795
],
[
-1.417348,
53.428696
],
[
-1.417051,
53.428362
],
[
-1.416667,
53.427883
],
[
-1.41612,
53.427126
],
[
-1.415662,
53.426485
],
[
-1.415519,
53.426293
],
[
-1.415515,
53.426287
],
[
-1.415234,
53.425926
],
[
-1.415056,
53.425709
],
[
-1.414626,
53.42524
]
]
]
}
View road section coordinates
[
[
[
-1.436057,
53.4399
],
[
-1.435923,
53.439796
],
[
-1.435365,
53.439389
],
[
-1.434969,
53.439099
],
[
-1.434585,
53.438823
],
[
-1.434581,
53.438819
],
[
-1.434581,
53.438819
],
[
-1.434044,
53.438439
],
[
-1.43294,
53.437687
],
[
-1.431746,
53.436945
],
[
-1.431432,
53.436772
],
[
-1.430894,
53.436464
],
[
-1.430207,
53.436092
],
[
-1.429654,
53.435784
],
[
-1.429475,
53.435693
],
[
-1.427846,
53.434832
],
[
-1.427556,
53.434677
],
[
-1.425738,
53.433709
],
[
-1.424491,
53.433045
],
[
-1.423571,
53.432555
],
[
-1.423303,
53.43241
],
[
-1.422779,
53.432156
],
[
-1.422301,
53.431893
],
[
-1.422002,
53.431738
],
[
-1.421031,
53.431221
],
[
-1.419701,
53.430496
],
[
-1.419119,
53.430134
],
[
-1.418717,
53.429862
],
[
-1.418344,
53.42959
],
[
-1.418136,
53.429419
],
[
-1.417793,
53.429129
],
[
-1.414626,
53.42524
],
[
-1.414567,
53.425177
],
[
-1.414478,
53.425068
],
[
-1.41369,
53.424345
],
[
-1.417793,
53.429129
],
[
-1.417734,
53.429066
],
[
-1.417452,
53.428795
],
[
-1.417348,
53.428696
],
[
-1.417051,
53.428362
],
[
-1.416667,
53.427883
],
[
-1.41612,
53.427126
],
[
-1.415662,
53.426485
],
[
-1.415519,
53.426293
],
[
-1.415515,
53.426287
],
[
-1.415234,
53.425926
],
[
-1.415056,
53.425709
],
[
-1.414626,
53.42524
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Wed, Aug 5, 2026 11:02 AM
- Record versioned
- Thu, Aug 20, 2026 11:19 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 6A to Jct 10 mobile lane closures (MP 33/9 to 48/9)
Active Roadworks National HighwaysExpected to clear in 2 hours 56 minutes
M1 northbound Jct 6A to Jct 10 mobile lane closures (MP 33/9 to 48/9)
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 2 months 3 days
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M1 southbound Jct 37 entry slip lane 2 closure
Planned Roadworks National HighwaysStarts in 9 hours 26 minutes
M1 southbound Jct 37 entry slip lane 2 closure
M1 northbound Jct 11A to Jct 14 carriageway closure
Planned Roadworks National HighwaysStarts in 9 hours 26 minutes
M1 northbound Jct 11A to Jct 14 carriageway closure
M1 southbound Jct 34 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 8 hours 26 minutes
M1 southbound Jct 34 exit slip road lane 1 closure
M1 southbound lane 1 closure (261/6 to 259/9)
Planned Roadworks National HighwaysStarts in 8 hours 26 minutes
M1 southbound lane 1 closure (261/6 to 259/9)