M1 southbound Jct 42 to Jct 40 lane 1 and 2 closure ( 291/9 290/7)
ClearedM1 southbound Jct 42 to Jct 40 lane 1 and 2 closure ( 291/9 290/7)
- Start time
- Thu, Oct 2, 2025 7:20 PM
- Expected end
- Fri, Oct 3, 2025 5:00 AM
- Duration
- 9 hours 40 minutes
- Road
- M1 – M1 Southbound Between J40 And J39
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 2, 2025 7:24 PM
- Last updated
- Fri, Oct 3, 2025 3:22 AM
- Cleared
- Fri, Oct 3, 2025 5:00 AM
- Latest update: M1 southbound Jct 42 to Jct 40 lane 1 and 2 closure ( 291/9 290/7)
- Coordinates
- 53.659575, -1.531801
- Latitude span
- 53.657209 – 53.664570
- Longitude span
- -1.537381 – -1.529292
- Bounding box centre
- 53.660890, -1.533337
- Location descriptions
-
- M1 southbound between J40 and J39
- Feed validity status
- Active
- Overall feed start
- Thu, Oct 2, 2025 7:20 PM
- Overall feed end
- Fri, Oct 3, 2025 5:00 AM
- Feed window length
- 9 hours 40 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M1 southbound between J40 and J39
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {90556DD6-49A9-4CEB-8759-2A79766F6CDF}
- Linear Element Type
- B Carriageway
- From Distance
- 141 m
- To Distance
- 835 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.66457 -1.537381 53.664536 -1.537342 53.662098 -1.534597 53.660121 -1.532379 53.659841 -1.532067 53.659381 -1.531555
Segment 2
9 coordinate pairs- Description
- M1 southbound between J40 and J39
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {8D3769D6-905B-43CE-84FB-371F5990F228}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 284 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.659381 -1.531555 53.659179 -1.531327 53.658244 -1.530281 53.658217 -1.530253 53.658137 -1.530169 53.657801 -1.529817 53.657585 -1.529608 53.657323 -1.529384 53.657209 -1.529292
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -1.537381, 53.664570
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.537381,
53.66457
],
[
-1.537342,
53.664536
],
[
-1.534597,
53.662098
],
[
-1.532379,
53.660121
],
[
-1.532067,
53.659841
],
[
-1.531555,
53.659381
],
[
-1.531555,
53.659381
],
[
-1.531327,
53.659179
],
[
-1.530281,
53.658244
],
[
-1.530253,
53.658217
],
[
-1.530169,
53.658137
],
[
-1.529817,
53.657801
],
[
-1.529608,
53.657585
],
[
-1.529384,
53.657323
],
[
-1.529292,
53.657209
]
]
]
}
View road section coordinates
[
[
[
-1.537381,
53.66457
],
[
-1.537342,
53.664536
],
[
-1.534597,
53.662098
],
[
-1.532379,
53.660121
],
[
-1.532067,
53.659841
],
[
-1.531555,
53.659381
],
[
-1.531555,
53.659381
],
[
-1.531327,
53.659179
],
[
-1.530281,
53.658244
],
[
-1.530253,
53.658217
],
[
-1.530169,
53.658137
],
[
-1.529817,
53.657801
],
[
-1.529608,
53.657585
],
[
-1.529384,
53.657323
],
[
-1.529292,
53.657209
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 5
- Record created
- Thu, Oct 2, 2025 7:24 PM
- Record versioned
- Fri, Oct 3, 2025 3:22 AM
- Coordinate source
- Geometry
Related incidents
M1 Southbound Jct 5 to Jct 1 Lane 3,2 closure
Planned National HighwaysM1 Southbound Jct 5 to Jct 1 Lane 3,2 closure
M1 southbound Jct 13 to Jct 12 hard shoulder closure and lane 1 and 2 closure (MP 68/8 to 66/0)
Planned National HighwaysM1 southbound Jct 13 to Jct 12 hard shoulder closure and lane 1 and 2 closure (MP 68/8 to 66/0)
M62 eastbound Jct 28 entry slip lane 1 closure
Planned National HighwaysM62 eastbound Jct 28 entry slip lane 1 closure
M1 northbound Jct 30 to Jct 31 lane 1 and 2 closure ( 239/1 - 244/4)
Planned National HighwaysM1 northbound Jct 30 to Jct 31 lane 1 and 2 closure ( 239/1 - 244/4)
Lane 1 closure southbound
Planned National HighwaysLane 1 closure southbound
M1 southbound Jct 13 exit slip lane closure switching
Planned National HighwaysM1 southbound Jct 13 exit slip lane closure switching