M1 southbound Jct 15 to Jct 14 lanes 1 and 2 closure (MP 91/0 to 87/1)
ActiveM1 southbound Jct 15 to Jct 14 lanes 1 and 2 closure (MP 91/0 to 87/1)
- Start time
- Mon, Aug 10, 2026 9:27 PM
- Expected end
- Tue, Aug 11, 2026 4:00 AM
- Duration
- 6 hours 33 minutes
- Road
- M1 – M1 Southbound Between J15 And J14
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 10, 2026 9:27 PM
- Last updated
- Mon, Aug 10, 2026 10:57 PM
- Cleared
- Tue, Aug 11, 2026 4:00 AM
- Latest update: M1 southbound Jct 15 to Jct 14 lanes 1 and 2 closure (MP 91/0 to 87/1)
- Coordinates
- 52.114868, -0.795735
- Latitude span
- 52.101533 – 52.126877
- Longitude span
- -0.816418 – -0.769395
- Bounding box centre
- 52.114205, -0.792907
- Location descriptions
-
- M1 southbound between J15 and J14
- Feed validity status
- Active
- Overall feed start
- Mon, Aug 10, 2026 9:27 PM
- Overall feed end
- Tue, Aug 11, 2026 4:00 AM
- Feed window length
- 6 hours 33 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {2D51F2A2-31D9-4A0A-9F09-9B83518BBBF9}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 538 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.104513 -0.775592 52.10423 -0.774969 52.103237 -0.77285 52.102282 -0.770905 52.101533 -0.769395
Segment 2
20 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {3F210055-6507-4128-BF78-2312F2C0555E}
- Linear Element Type
- B Carriageway
- From Distance
- 687 m
- To Distance
- 2,091 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.126877 -0.816418 52.126625 -0.81602 52.126159 -0.815288 52.125873 -0.814842 52.12498 -0.813451 52.124058 -0.812013 52.123583 -0.811266 52.123336 -0.810884 52.12308 -0.810487 52.122459 -0.809528 52.122215 -0.809138 52.121765 -0.808422 52.121091 -0.807373 52.120888 -0.807057 52.120458 -0.806368 52.119189 -0.804415 52.118951 -0.804042 52.118787 -0.803783 52.118211 -0.802864 52.117785 -0.802185
Segment 3
17 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {D5A215FF-CACF-4FC4-A66D-41FCEF4BD2F9}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,933 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.115202 -0.797862 52.114138 -0.795802 52.112907 -0.793258 52.112861 -0.793163 52.11106 -0.789386 52.110579 -0.788376 52.109343 -0.785781 52.109231 -0.785546 52.108669 -0.784366 52.108643 -0.784311 52.107448 -0.781773 52.106014 -0.778761 52.105787 -0.778285 52.105444 -0.777564 52.104617 -0.77582 52.104516 -0.775599 52.104513 -0.775592
Segment 4
7 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {A9DC3447-BD2B-456B-9641-884BEFE6E029}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 412 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.117785 -0.802185 52.117589 -0.801872 52.117243 -0.801356 52.116538 -0.800177 52.11576 -0.798825 52.115266 -0.797947 52.115202 -0.797862
- Geometry type
- MultiLineString
- Geometry points
- 49
- First coordinate pair
- -0.775592, 52.104513
- Road section segments
- 1
- Road section points
- 49
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.775592,
52.104513
],
[
-0.774969,
52.10423
],
[
-0.77285,
52.103237
],
[
-0.770905,
52.102282
],
[
-0.769395,
52.101533
],
[
-0.816418,
52.126877
],
[
-0.81602,
52.126625
],
[
-0.815288,
52.126159
],
[
-0.814842,
52.125873
],
[
-0.813451,
52.12498
],
[
-0.812013,
52.124058
],
[
-0.811266,
52.123583
],
[
-0.810884,
52.123336
],
[
-0.810487,
52.12308
],
[
-0.809528,
52.122459
],
[
-0.809138,
52.122215
],
[
-0.808422,
52.121765
],
[
-0.807373,
52.121091
],
[
-0.807057,
52.120888
],
[
-0.806368,
52.120458
],
[
-0.804415,
52.119189
],
[
-0.804042,
52.118951
],
[
-0.803783,
52.118787
],
[
-0.802864,
52.118211
],
[
-0.802185,
52.117785
],
[
-0.797862,
52.115202
],
[
-0.795802,
52.114138
],
[
-0.793258,
52.112907
],
[
-0.793163,
52.112861
],
[
-0.789386,
52.11106
],
[
-0.788376,
52.110579
],
[
-0.785781,
52.109343
],
[
-0.785546,
52.109231
],
[
-0.784366,
52.108669
],
[
-0.784311,
52.108643
],
[
-0.781773,
52.107448
],
[
-0.778761,
52.106014
],
[
-0.778285,
52.105787
],
[
-0.777564,
52.105444
],
[
-0.77582,
52.104617
],
[
-0.775599,
52.104516
],
[
-0.775592,
52.104513
],
[
-0.802185,
52.117785
],
[
-0.801872,
52.117589
],
[
-0.801356,
52.117243
],
[
-0.800177,
52.116538
],
[
-0.798825,
52.11576
],
[
-0.797947,
52.115266
],
[
-0.797862,
52.115202
]
]
]
}
View road section coordinates
[
[
[
-0.775592,
52.104513
],
[
-0.774969,
52.10423
],
[
-0.77285,
52.103237
],
[
-0.770905,
52.102282
],
[
-0.769395,
52.101533
],
[
-0.816418,
52.126877
],
[
-0.81602,
52.126625
],
[
-0.815288,
52.126159
],
[
-0.814842,
52.125873
],
[
-0.813451,
52.12498
],
[
-0.812013,
52.124058
],
[
-0.811266,
52.123583
],
[
-0.810884,
52.123336
],
[
-0.810487,
52.12308
],
[
-0.809528,
52.122459
],
[
-0.809138,
52.122215
],
[
-0.808422,
52.121765
],
[
-0.807373,
52.121091
],
[
-0.807057,
52.120888
],
[
-0.806368,
52.120458
],
[
-0.804415,
52.119189
],
[
-0.804042,
52.118951
],
[
-0.803783,
52.118787
],
[
-0.802864,
52.118211
],
[
-0.802185,
52.117785
],
[
-0.797862,
52.115202
],
[
-0.795802,
52.114138
],
[
-0.793258,
52.112907
],
[
-0.793163,
52.112861
],
[
-0.789386,
52.11106
],
[
-0.788376,
52.110579
],
[
-0.785781,
52.109343
],
[
-0.785546,
52.109231
],
[
-0.784366,
52.108669
],
[
-0.784311,
52.108643
],
[
-0.781773,
52.107448
],
[
-0.778761,
52.106014
],
[
-0.778285,
52.105787
],
[
-0.777564,
52.105444
],
[
-0.77582,
52.104617
],
[
-0.775599,
52.104516
],
[
-0.775592,
52.104513
],
[
-0.802185,
52.117785
],
[
-0.801872,
52.117589
],
[
-0.801356,
52.117243
],
[
-0.800177,
52.116538
],
[
-0.798825,
52.11576
],
[
-0.797947,
52.115266
],
[
-0.797862,
52.115202
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Aug 10, 2026 9:27 PM
- Record versioned
- Mon, Aug 10, 2026 10:57 PM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 Southbound Jct 5 to Jct 4 lane 3 closure
Active Roadworks National HighwaysExpected to clear in 5 hours 8 minutes
M1 Southbound Jct 5 to Jct 4 lane 3 closure
M1 southbound Jct 40 exit slip lane 2 closure
Active Roadworks National HighwaysExpected to clear in 4 hours 38 minutes
M1 southbound Jct 40 exit slip lane 2 closure
Lane 1 closure northbound
Active Roadworks National HighwaysExpected to clear in 5 hours 38 minutes
Lane 1 closure northbound
M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)
Active Roadworks National HighwaysExpected to clear in 5 hours 38 minutes
M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)
M1 northbound Jct 37 to Jct 38 lane 1 and 2 closure (281/0 - 281/6)
Planned Roadworks National HighwaysExpected to clear in 5 hours 38 minutes
M1 northbound Jct 37 to Jct 38 lane 1 and 2 closure (281/0 - 281/6)
Lane 1 closure southbound
Planned Roadworks National HighwaysExpected to clear in 5 hours 38 minutes
Lane 1 closure southbound