M1 southbound Cattle Creep to Newport Pagnell Services lane 1 closure
PlannedM1 southbound Cattle Creep to Newport Pagnell Services lane 1 closure
- Start time
- Fri, Aug 7, 2026 9:00 PM
- Expected end
- Sat, Aug 8, 2026 4:00 AM
- Duration
- 7 hours
- Road
- M1 – M1 Southbound Between J15 And J14
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Aug 4, 2026 1:27 PM
- Last updated
- Fri, Aug 7, 2026 5:41 AM
- Cleared
- Sat, Aug 8, 2026 4:00 AM
- Latest update: M1 southbound Cattle Creep to Newport Pagnell Services lane 1 closure
- Coordinates
- 52.135503, -0.827895
- Latitude span
- 52.125256 – 52.148330
- Longitude span
- -0.841540 – -0.813880
- Bounding box centre
- 52.136793, -0.827710
- Location descriptions
-
- M1 southbound between J15 and J14
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 7, 2026 9:00 PM
- Overall feed end
- Sat, Aug 8, 2026 4:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {4DB778A9-00C9-4AA2-9ACA-298BE425CDE1}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,404 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.14555 -0.838991 52.14541 -0.838862 52.14256 -0.836218 52.138513 -0.832481 52.13766 -0.831641 52.137133 -0.831085 52.135815 -0.829629 52.135059 -0.828713 52.134777 -0.828341
Segment 2
2 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {D354327E-D610-4029-AFB2-1F81D3C7B687}
- Linear Element Type
- B Carriageway
- From Distance
- 437 m
- To Distance
- 734 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.14833 -0.84154 52.146003 -0.839406
Segment 3
6 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {FDD4BAEA-1318-4116-89AC-B78EC0756D21}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 512 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.134777 -0.828341 52.133474 -0.826593 52.132926 -0.825803 52.132233 -0.824784 52.13134 -0.823381 52.131335 -0.823374
Segment 4
2 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {0DBBA29A-C2F6-4507-BDD9-6583AAE24541}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 57 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.146003 -0.839406 52.14555 -0.838991
Segment 5
8 coordinate pairs- Description
- M1 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {3F210055-6507-4128-BF78-2312F2C0555E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 937 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.131335 -0.823374 52.130909 -0.822715 52.129429 -0.820402 52.128552 -0.819052 52.126625 -0.81602 52.126159 -0.815288 52.125873 -0.814842 52.125256 -0.81388
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -0.838991, 52.145550
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.838991,
52.14555
],
[
-0.838862,
52.14541
],
[
-0.836218,
52.14256
],
[
-0.832481,
52.138513
],
[
-0.831641,
52.13766
],
[
-0.831085,
52.137133
],
[
-0.829629,
52.135815
],
[
-0.828713,
52.135059
],
[
-0.828341,
52.134777
],
[
-0.84154,
52.14833
],
[
-0.839406,
52.146003
],
[
-0.828341,
52.134777
],
[
-0.826593,
52.133474
],
[
-0.825803,
52.132926
],
[
-0.824784,
52.132233
],
[
-0.823381,
52.13134
],
[
-0.823374,
52.131335
],
[
-0.839406,
52.146003
],
[
-0.838991,
52.14555
],
[
-0.823374,
52.131335
],
[
-0.822715,
52.130909
],
[
-0.820402,
52.129429
],
[
-0.819052,
52.128552
],
[
-0.81602,
52.126625
],
[
-0.815288,
52.126159
],
[
-0.814842,
52.125873
],
[
-0.81388,
52.125256
]
]
]
}
View road section coordinates
[
[
[
-0.838991,
52.14555
],
[
-0.838862,
52.14541
],
[
-0.836218,
52.14256
],
[
-0.832481,
52.138513
],
[
-0.831641,
52.13766
],
[
-0.831085,
52.137133
],
[
-0.829629,
52.135815
],
[
-0.828713,
52.135059
],
[
-0.828341,
52.134777
],
[
-0.84154,
52.14833
],
[
-0.839406,
52.146003
],
[
-0.828341,
52.134777
],
[
-0.826593,
52.133474
],
[
-0.825803,
52.132926
],
[
-0.824784,
52.132233
],
[
-0.823381,
52.13134
],
[
-0.823374,
52.131335
],
[
-0.839406,
52.146003
],
[
-0.838991,
52.14555
],
[
-0.823374,
52.131335
],
[
-0.822715,
52.130909
],
[
-0.820402,
52.129429
],
[
-0.819052,
52.128552
],
[
-0.81602,
52.126625
],
[
-0.815288,
52.126159
],
[
-0.814842,
52.125873
],
[
-0.81388,
52.125256
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Aug 4, 2026 1:27 PM
- Record versioned
- Fri, Aug 7, 2026 5:41 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
Lane 1,2 closure northbound
Planned Roadworks National HighwaysStarts in 12 hours 43 minutes
Lane 1,2 closure northbound
Lane 1,2 closure southbound
Planned Roadworks National HighwaysStarts in 12 hours 43 minutes
Lane 1,2 closure southbound
Lane 2,3,4 closure southbound
Planned Roadworks National HighwaysStarts in 12 hours 43 minutes
Lane 2,3,4 closure southbound
M1 northbound Jct 41 exit slip road closure
Planned Roadworks National HighwaysStarts in 12 hours 43 minutes
M1 northbound Jct 41 exit slip road closure
Lane 1 closure northbound
Planned Roadworks National HighwaysStarts in 12 hours 43 minutes
Lane 1 closure northbound
M45 to M1 link road lane closure eastbound
Planned Roadworks National HighwaysStarts in 12 hours 43 minutes
M45 to M1 link road lane closure eastbound