M1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
ClearedM1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
- Start time
- Mon, Oct 19, 2026 8:00 PM
- Expected end
- Tue, Oct 20, 2026 4:00 AM
- Duration
- 7 hours 40 minutes 2 seconds
- Road
- M1 – M1 Southbound Between J10 And J9
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 4 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 15, 2026 2:40 AM
- Last updated
- Tue, Oct 20, 2026 3:22 AM
- Cleared
- Tue, Oct 20, 2026 3:40 AM
- Latest update: M1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
- Coordinates
- 51.828559, -0.418398
- Latitude span
- 51.825372 – 51.832171
- Longitude span
- -0.419005 – -0.417844
- Bounding box centre
- 51.828772, -0.418425
- Location descriptions
-
- M1 southbound between J10 and J9
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 19, 2026 8:00 PM
- Overall feed end
- Tue, Oct 20, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M1 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {FE7ABA8D-8917-4267-B641-FDBF2263B533}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 33 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.82567 -0.417908 51.825372 -0.417844
Segment 2
6 coordinate pairs- Description
- M1 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {95E4B104-CAAF-41D9-94FF-FDA15E0A3857}
- Linear Element Type
- B Carriageway
- From Distance
- 268 m
- To Distance
- 995 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.832171 -0.419005 51.831988 -0.418977 51.831411 -0.418882 51.829843 -0.418632 51.82635 -0.418026 51.82567 -0.417908
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -0.417908, 51.825670
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.417908,
51.82567
],
[
-0.417844,
51.825372
],
[
-0.419005,
51.832171
],
[
-0.418977,
51.831988
],
[
-0.418882,
51.831411
],
[
-0.418632,
51.829843
],
[
-0.418026,
51.82635
],
[
-0.417908,
51.82567
]
]
]
}
View road section coordinates
[
[
[
-0.417908,
51.82567
],
[
-0.417844,
51.825372
],
[
-0.419005,
51.832171
],
[
-0.418977,
51.831988
],
[
-0.418882,
51.831411
],
[
-0.418632,
51.829843
],
[
-0.418026,
51.82635
],
[
-0.417908,
51.82567
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Oct 15, 2026 2:40 AM
- Record versioned
- Tue, Oct 20, 2026 3:22 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 6 to Jct 8 carriageway closure
Planned Roadworks National HighwaysStarts in 16 hours 53 minutes
M1 northbound Jct 6 to Jct 8 carriageway closure
M1 southbound Jct 14 to Jct 13 lane closure (MP 76/2 to 75/3)
Planned Roadworks National HighwaysStarts in 16 hours 53 minutes
M1 southbound Jct 14 to Jct 13 lane closure (MP 76/2 to 75/3)
M1 southbound Approach to Jct 9 lane 4,3,2 closure (MP 46/5 to 45/7)
Planned Roadworks National HighwaysStarts in 15 hours 53 minutes
M1 southbound Approach to Jct 9 lane 4,3,2 closure (MP 46/5 to 45/7)
M1 southbound Jct 37 entry slip road closure
Planned Roadworks National HighwaysStarts in 15 hours 53 minutes
M1 southbound Jct 37 entry slip road closure
M1 southbound Jct 12 Toddington exit slip road closure
Planned Roadworks National HighwaysStarts in 15 hours 53 minutes
M1 southbound Jct 12 Toddington exit slip road closure
Lane 1 closure southbound
Planned Roadworks National HighwaysStarts in 14 hours 53 minutes
Lane 1 closure southbound