M1 northbound Jct 6A to Jct 10 mobile lane closures (MP 33/9 to 48/9)
PlannedM1 northbound Jct 6A to Jct 10 mobile lane closures (MP 33/9 to 48/9)
- Start time
- Fri, Aug 21, 2026 8:30 AM
- Expected end
- Fri, Aug 21, 2026 2:30 PM
- Duration
- 6 hours
- Road
- M1 – M1 Northbound Between J8 And J9
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Roadside Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 8:18 AM
- Last updated
- Fri, Aug 21, 2026 9:12 AM
- Cleared
- Fri, Aug 21, 2026 2:30 PM
- Latest update: M1 northbound Jct 6A to Jct 10 mobile lane closures (MP 33/9 to 48/9)
- Coordinates
- 51.768728, -0.414955
- Latitude span
- 51.765078 – 51.773941
- Longitude span
- -0.415996 – -0.413475
- Bounding box centre
- 51.769510, -0.414736
- Location descriptions
-
- M1 northbound between J8 and J9
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 21, 2026 8:30 AM
- Overall feed end
- Fri, Aug 21, 2026 2:30 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M1 northbound between J8 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {12BE6B2E-F084-4405-9411-445E4ED7DC4D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 520 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.76933 -0.414777 51.773941 -0.413475
Segment 2
6 coordinate pairs- Description
- M1 northbound between J8 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {19F84BD4-E524-447B-AC92-49EE7437DD6A}
- Linear Element Type
- A Carriageway
- From Distance
- 31 m
- To Distance
- 511 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.765078 -0.415996 51.766929 -0.415476 51.767189 -0.415403 51.768989 -0.414876 51.769034 -0.41486 51.76933 -0.414777
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -0.414777, 51.769330
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.414777,
51.76933
],
[
-0.413475,
51.773941
],
[
-0.415996,
51.765078
],
[
-0.415476,
51.766929
],
[
-0.415403,
51.767189
],
[
-0.414876,
51.768989
],
[
-0.41486,
51.769034
],
[
-0.414777,
51.76933
]
]
]
}
View road section coordinates
[
[
[
-0.414777,
51.76933
],
[
-0.413475,
51.773941
],
[
-0.415996,
51.765078
],
[
-0.415476,
51.766929
],
[
-0.415403,
51.767189
],
[
-0.414876,
51.768989
],
[
-0.41486,
51.769034
],
[
-0.414777,
51.76933
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadside Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 21, 2026 8:18 AM
- Record versioned
- Fri, Aug 21, 2026 9:12 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 2 months 2 days
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M1 southbound Jct 15 to Jct 14 lane 4,3,2 closures (MP 82/1 to 80/7)
Planned Roadworks National HighwaysStarts in 11 hours 36 minutes
M1 southbound Jct 15 to Jct 14 lane 4,3,2 closures (MP 82/1 to 80/7)
M1 southbound Jct 14 to Jct 11A carriageway closure
Planned Roadworks National HighwaysStarts in 11 hours 36 minutes
M1 southbound Jct 14 to Jct 11A carriageway closure
M1 northbound Jct 40 to Jct 41 Lane 1 and 2 closure (294/8 - 296/7)
Planned Roadworks National HighwaysStarts in 10 hours 36 minutes
M1 northbound Jct 40 to Jct 41 Lane 1 and 2 closure (294/8 - 296/7)
M1 northbound Jct 40 entry slip lane 1 closure
Planned Roadworks National HighwaysStarts in 10 hours 36 minutes
M1 northbound Jct 40 entry slip lane 1 closure
M1 southbound Jct 35A to Jct 35 lane 1 closure ( 268/6 268/2)
Planned Roadworks National HighwaysStarts in 10 hours 36 minutes
M1 southbound Jct 35A to Jct 35 lane 1 closure ( 268/6 268/2)