M1 Northbound Jct 4 entry slip road lane 1 closure
PlannedM1 Northbound Jct 4 entry slip road lane 1 closure
- Start time
- Thu, Aug 13, 2026 9:00 PM
- Expected end
- Fri, Aug 14, 2026 4:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M1 – Link Road From A41 Westbound To M1 Northbound
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jun 17, 2026 1:27 PM
- Last updated
- Thu, Aug 13, 2026 11:42 AM
- Cleared
- Fri, Aug 14, 2026 4:30 AM
- Latest update: M1 Northbound Jct 4 entry slip road lane 1 closure
- Coordinates
- 51.635691, -0.304316
- Latitude span
- 51.634192 – 51.637013
- Longitude span
- -0.308470 – -0.301278
- Bounding box centre
- 51.635603, -0.304874
- Location descriptions
-
- link road from A41 westbound to M1 northbound
- M1 northbound between J4 and J5
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 13, 2026 9:00 PM
- Overall feed end
- Fri, Aug 14, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- link road from A41 westbound to M1 northbound
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {4C95ADAA-8B85-4241-BBCA-2B4F94C7AF22}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 173 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.635958 -0.304693 51.635963 -0.304711 51.636156 -0.30538 51.636588 -0.306983
Segment 2
12 coordinate pairs- Description
- link road from A41 westbound to M1 northbound
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {EE95C14C-6582-469F-9D01-5D4FA356824D}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 59 m
- To Distance
- 374 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.634192 -0.301278 51.634391 -0.301457 51.6345 -0.301554 51.634729 -0.30182 51.63494 -0.302101 51.635014 -0.302214 51.635254 -0.302653 51.635477 -0.303165 51.635626 -0.30355 51.635777 -0.304021 51.635946 -0.304653 51.635958 -0.304693
Segment 3
4 coordinate pairs- Description
- M1 northbound between J4 and J5
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {059F883C-ACC1-4B80-942C-DA9AD84B4B5F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 113 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.636588 -0.306983 51.636745 -0.307511 51.637001 -0.308426 51.637013 -0.30847
- Geometry type
- MultiLineString
- Geometry points
- 20
- First coordinate pair
- -0.304693, 51.635958
- Road section segments
- 1
- Road section points
- 20
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.304693,
51.635958
],
[
-0.304711,
51.635963
],
[
-0.30538,
51.636156
],
[
-0.306983,
51.636588
],
[
-0.301278,
51.634192
],
[
-0.301457,
51.634391
],
[
-0.301554,
51.6345
],
[
-0.30182,
51.634729
],
[
-0.302101,
51.63494
],
[
-0.302214,
51.635014
],
[
-0.302653,
51.635254
],
[
-0.303165,
51.635477
],
[
-0.30355,
51.635626
],
[
-0.304021,
51.635777
],
[
-0.304653,
51.635946
],
[
-0.304693,
51.635958
],
[
-0.306983,
51.636588
],
[
-0.307511,
51.636745
],
[
-0.308426,
51.637001
],
[
-0.30847,
51.637013
]
]
]
}
View road section coordinates
[
[
[
-0.304693,
51.635958
],
[
-0.304711,
51.635963
],
[
-0.30538,
51.636156
],
[
-0.306983,
51.636588
],
[
-0.301278,
51.634192
],
[
-0.301457,
51.634391
],
[
-0.301554,
51.6345
],
[
-0.30182,
51.634729
],
[
-0.302101,
51.63494
],
[
-0.302214,
51.635014
],
[
-0.302653,
51.635254
],
[
-0.303165,
51.635477
],
[
-0.30355,
51.635626
],
[
-0.304021,
51.635777
],
[
-0.304653,
51.635946
],
[
-0.304693,
51.635958
],
[
-0.306983,
51.636588
],
[
-0.307511,
51.636745
],
[
-0.308426,
51.637001
],
[
-0.30847,
51.637013
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jun 17, 2026 1:27 PM
- Record versioned
- Thu, Aug 13, 2026 11:42 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 48 24/7 Lane 1 closure (319/1 55/0)
Planned Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M1 northbound Jct 48 24/7 Lane 1 closure (319/1 55/0)
M1 northbound Jct 10 exit slip road closure
Planned Roadworks National HighwaysStarts in 7 hours 53 minutes
M1 northbound Jct 10 exit slip road closure
M1 southbound Newport Pagnell exit slip road closure
Planned Roadworks National HighwaysStarts in 7 hours 53 minutes
M1 southbound Newport Pagnell exit slip road closure
M1 southbound Newport Pagnell lane closure (MP 86/2 to 84/5)
Planned Roadworks National HighwaysStarts in 7 hours 53 minutes
M1 southbound Newport Pagnell lane closure (MP 86/2 to 84/5)
M1 Northbound Jct 5 Entry Lane 1 Closure
Planned Roadworks National HighwaysStarts in 7 hours 53 minutes
M1 Northbound Jct 5 Entry Lane 1 Closure
M1 southbound Jct 11 to Jct 10 lane 1 closure (MP 53/1 to 49/6)
Planned Roadworks National HighwaysStarts in 7 hours 53 minutes
M1 southbound Jct 11 to Jct 10 lane 1 closure (MP 53/1 to 49/6)