M1 northbound Jct 39 to Jct 41 lane 1 closure ( 289/8 290/2)
ClearedM1 northbound Jct 39 to Jct 41 lane 1 closure ( 289/8 290/2)
- Start time
- Fri, Oct 31, 2025 9:00 PM
- Expected end
- Sat, Nov 1, 2025 5:00 AM
- Duration
- 8 hours
- Road
- M1 – M1 Northbound Within J39
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 31, 2025 4:42 AM
- Last updated
- Fri, Oct 31, 2025 5:30 AM
- Cleared
- Sat, Nov 1, 2025 5:00 AM
- Latest update: M1 northbound Jct 39 to Jct 41 lane 1 closure ( 289/8 290/2)
- Coordinates
- 53.651088, -1.528693
- Latitude span
- 53.649375 – 53.652715
- Longitude span
- -1.529321 – -1.528240
- Bounding box centre
- 53.651045, -1.528781
- Location descriptions
-
- M1 northbound within J39
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 31, 2025 9:00 PM
- Overall feed end
- Sat, Nov 1, 2025 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M1 northbound within J39
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {6DE296D8-0271-4BFB-A3E3-27324F407788}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 179 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.651119 -1.528636 53.651415 -1.528527 53.651765 -1.528432 53.65225 -1.528305 53.652438 -1.528273 53.652627 -1.528241 53.652715 -1.52824
Segment 2
4 coordinate pairs- Description
- M1 northbound within J39
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {1E5934CD-04A1-4032-953E-5188EE23DF5F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 118 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.650077 -1.529011 53.650122 -1.528995 53.650697 -1.528777 53.651119 -1.528636
Segment 3
3 coordinate pairs- Description
- M1 northbound within J39
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {380DFD2F-183D-4DBF-ABA1-D1BA0FC94611}
- Linear Element Type
- A Carriageway
- From Distance
- 632 m
- To Distance
- 713 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.649375 -1.529321 53.64944 -1.52929 53.650077 -1.529011
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -1.528636, 53.651119
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.528636,
53.651119
],
[
-1.528527,
53.651415
],
[
-1.528432,
53.651765
],
[
-1.528305,
53.65225
],
[
-1.528273,
53.652438
],
[
-1.528241,
53.652627
],
[
-1.52824,
53.652715
],
[
-1.529011,
53.650077
],
[
-1.528995,
53.650122
],
[
-1.528777,
53.650697
],
[
-1.528636,
53.651119
],
[
-1.529321,
53.649375
],
[
-1.52929,
53.64944
],
[
-1.529011,
53.650077
]
]
]
}
View road section coordinates
[
[
[
-1.528636,
53.651119
],
[
-1.528527,
53.651415
],
[
-1.528432,
53.651765
],
[
-1.528305,
53.65225
],
[
-1.528273,
53.652438
],
[
-1.528241,
53.652627
],
[
-1.52824,
53.652715
],
[
-1.529011,
53.650077
],
[
-1.528995,
53.650122
],
[
-1.528777,
53.650697
],
[
-1.528636,
53.651119
],
[
-1.529321,
53.649375
],
[
-1.52929,
53.64944
],
[
-1.529011,
53.650077
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Fri, Oct 31, 2025 4:42 AM
- Record versioned
- Fri, Oct 31, 2025 5:30 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 southbound Jct 13 to Jct 12 lane 1 and 2 closure (MP 72/8 to 68/8)
Planned Roadworks National HighwaysStarts in 19 hours 11 minutes
M1 southbound Jct 13 to Jct 12 lane 1 and 2 closure (MP 72/8 to 68/8)
M1 southbound Jct 14 exit slip road closure
Planned Roadworks National HighwaysStarts in 19 hours 11 minutes
M1 southbound Jct 14 exit slip road closure
M1 southbound Jct 12 to Jct 11A hard shoulder closure and lane 1 closure (MP 59/2 to 55/1)
Planned Roadworks National HighwaysStarts in 19 hours 11 minutes
M1 southbound Jct 12 to Jct 11A hard shoulder closure and lane 1 closure (MP 59/2 to 55/1)
M1 southbound Jct 11A to Jct 9 carriageway closure
Planned Roadworks National HighwaysStarts in 19 hours 11 minutes
M1 southbound Jct 11A to Jct 9 carriageway closure
M1 southbound Jct 31 exit slip lane 1 closure
Planned Roadworks National HighwaysStarts in 18 hours 11 minutes
M1 southbound Jct 31 exit slip lane 1 closure
Lane 1 closure southbound
Planned Roadworks National HighwaysStarts in 17 hours 11 minutes
Lane 1 closure southbound