Layby closure eastbound
ClearedLayby closure eastbound
- Start time
- Mon, Jan 26, 2026 8:58 PM
- Expected end
- Mon, May 4, 2026 5:00 AM
- Duration
- 3 months 1 week 8 hours
- Road
- A14 – A14 Eastbound Between J2 And J3
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Roadside Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Apr 28, 2026 10:18 AM
- Last updated
- Mon, May 4, 2026 3:43 AM
- Cleared
- Mon, May 4, 2026 5:00 AM
- Latest update: Layby closure eastbound
- Coordinates
- 52.405438, -0.885579
- Latitude span
- 52.405340 – 52.405485
- Longitude span
- -0.887726 – -0.883813
- Bounding box centre
- 52.405413, -0.885770
- Location descriptions
-
- A14 eastbound between J2 and J3
- Feed validity status
- Active
- Overall feed start
- Mon, Jan 26, 2026 8:58 PM
- Overall feed end
- Mon, May 4, 2026 5:00 AM
- Feed window length
- 3 months 1 week 8 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A14 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {CEF3EF60-DC93-4680-A8F6-0CE457311EF1}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.405485 -0.88406 52.40548 -0.883813
Segment 2
6 coordinate pairs- Description
- A14 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {B75AFE52-149F-451B-BEA1-8B771F0438E0}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 182 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.405403 -0.886745 52.405454 -0.885926 52.40546 -0.885573 52.405479 -0.884793 52.405483 -0.884249 52.405485 -0.88406
Segment 3
3 coordinate pairs- Description
- A14 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {3753114B-5AFF-4425-8F39-28106646E9E5}
- Linear Element Type
- A Carriageway
- From Distance
- 527 m
- To Distance
- 594 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.40534 -0.887726 52.405345 -0.887678 52.405403 -0.886745
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -0.884060, 52.405485
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.88406,
52.405485
],
[
-0.883813,
52.40548
],
[
-0.886745,
52.405403
],
[
-0.885926,
52.405454
],
[
-0.885573,
52.40546
],
[
-0.884793,
52.405479
],
[
-0.884249,
52.405483
],
[
-0.88406,
52.405485
],
[
-0.887726,
52.40534
],
[
-0.887678,
52.405345
],
[
-0.886745,
52.405403
]
]
]
}
View road section coordinates
[
[
[
-0.88406,
52.405485
],
[
-0.883813,
52.40548
],
[
-0.886745,
52.405403
],
[
-0.885926,
52.405454
],
[
-0.885573,
52.40546
],
[
-0.884793,
52.405479
],
[
-0.884249,
52.405483
],
[
-0.88406,
52.405485
],
[
-0.887726,
52.40534
],
[
-0.887678,
52.405345
],
[
-0.886745,
52.405403
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadside Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 17
- Record created
- Tue, Apr 28, 2026 10:18 AM
- Record versioned
- Mon, May 4, 2026 3:43 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 49 lane 1 closure
Cleared Roadworks National HighwaysCleared 19 hours 20 minutes ago
A14 eastbound Jct 49 lane 1 closure
A14 westbound Jct 49 exit and entry slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
A14 westbound Jct 49 exit and entry slip road lane 1 closure
A14 eastbound Jct 49 exit and entry slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 17 hours ago
A14 eastbound Jct 49 exit and entry slip road lane 1 closure
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
Cleared Roadworks National HighwaysCleared 1 day 10 hours ago
A14 both directions Jct 43 to Jct 47 mobile lane closures (MP 160/1 to 144/6)
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
Cleared Roadworks National HighwaysCleared 1 day 10 hours ago
A14 both directions Jct 47 to Jct 53 mobile lane closures (MP 182/4 to 160/1)
A14 eastbound Jct 44 lane 2 closure (MP 145/3 to 147/3)
Cleared Roadworks National HighwaysCleared 1 day 10 hours ago
A14 eastbound Jct 44 lane 2 closure (MP 145/3 to 147/3)