Lanes 2 and 3 closure southbound
ClearedLanes 2 and 3 closure southbound
- Start time
- Thu, Sep 24, 2026 8:00 PM
- Expected end
- Fri, Sep 25, 2026 5:00 AM
- Duration
- 7 hours 1 second
- Road
- M42 – M42 Southbound Between J11 And J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 1, 2026 10:48 AM
- Last updated
- Fri, Sep 25, 2026 2:29 AM
- Cleared
- Fri, Sep 25, 2026 3:00 AM
- Latest update: Lanes 2 and 3 closure southbound
- Coordinates
- 52.609991, -1.635878
- Latitude span
- 52.608203 – 52.612911
- Longitude span
- -1.636986 – -1.634219
- Bounding box centre
- 52.610557, -1.635603
- Location descriptions
-
- M42 southbound between J11 and J10
- Feed validity status
- Planned
- Overall feed start
- Thu, Sep 24, 2026 8:00 PM
- Overall feed end
- Fri, Sep 25, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M42 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {B6D31ED2-31FC-4231-A39A-8C98ECCCEE4B}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 269 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.610465 -1.635552 52.609675 -1.636016 52.609074 -1.636405 52.60832 -1.636899 52.608311 -1.636905 52.608203 -1.636986
Segment 2
4 coordinate pairs- Description
- M42 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {A3980B1F-711E-49B4-BF70-BCAC708D31FD}
- Linear Element Type
- B Carriageway
- From Distance
- 700 m
- To Distance
- 987 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.612911 -1.634219 52.611748 -1.634847 52.610734 -1.635402 52.610465 -1.635552
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -1.635552, 52.610465
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.635552,
52.610465
],
[
-1.636016,
52.609675
],
[
-1.636405,
52.609074
],
[
-1.636899,
52.60832
],
[
-1.636905,
52.608311
],
[
-1.636986,
52.608203
],
[
-1.634219,
52.612911
],
[
-1.634847,
52.611748
],
[
-1.635402,
52.610734
],
[
-1.635552,
52.610465
]
]
]
}
View road section coordinates
[
[
[
-1.635552,
52.610465
],
[
-1.636016,
52.609675
],
[
-1.636405,
52.609074
],
[
-1.636899,
52.60832
],
[
-1.636905,
52.608311
],
[
-1.636986,
52.608203
],
[
-1.634219,
52.612911
],
[
-1.634847,
52.611748
],
[
-1.635402,
52.610734
],
[
-1.635552,
52.610465
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Tue, Sep 1, 2026 10:48 AM
- Record versioned
- Fri, Sep 25, 2026 2:29 AM
- Coordinate source
- Geometry
Driving on the M42? See every live closure, roadwork and planned restriction on this road.
M42 live closuresRelated incidents
Lane 1 closure northbound (closing ERA)
Active Roadworks National HighwaysExpected to clear in 2 months 2 weeks
Lane 1 closure northbound (closing ERA)
Hardshoulder closure northbound
Active Roadworks National HighwaysExpected to clear in 2 months 3 weeks
Hardshoulder closure northbound
Lanes closures southbound
Planned Roadworks National HighwaysStarts in 6 hours 6 minutes
Lanes closures southbound
Lanes closures northbound
Planned Roadworks National HighwaysStarts in 6 hours 6 minutes
Lanes closures northbound
Lane 1 closure northbound
Planned Roadworks National HighwaysStarts in 6 hours 6 minutes
Lane 1 closure northbound
M42 southbound Jct 6 between the exit and entry slip roads carriageway closure
Cleared Roadworks National HighwaysCleared 10 hours 53 minutes ago
M42 southbound Jct 6 between the exit and entry slip roads carriageway closure