Lanes 2 and 3 closure eastbound
ClearedLanes 2 and 3 closure eastbound
- Start time
- Fri, Oct 23, 2026 8:00 PM
- Expected end
- Sat, Oct 24, 2026 5:00 AM
- Duration
- 7 hours 50 minutes 2 seconds
- Road
- M54 – M54 Eastbound Within J5
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 1 lanes affected, 2 of 2 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 5, 2026 10:30 AM
- Last updated
- Sat, Oct 24, 2026 3:33 AM
- Cleared
- Sat, Oct 24, 2026 3:50 AM
- Latest update: Lanes 2 and 3 closure eastbound
- Coordinates
- 52.685565, -2.457078
- Latitude span
- 52.684514 – 52.686426
- Longitude span
- -2.461528 – -2.452488
- Bounding box centre
- 52.685470, -2.457008
- Location descriptions
-
- M54 eastbound within J5
- M54 eastbound between J6 and J5
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 23, 2026 8:00 PM
- Overall feed end
- Sat, Oct 24, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M54 eastbound within J5
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M54
- Linear Element Model
- The Network Model
- Linear Element Id
- {1A90DB45-8728-49F9-8655-314DEEE728BF}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 109 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.68493 -2.453954 52.684514 -2.452488
Segment 2
7 coordinate pairs- Description
- M54 eastbound between J6 and J5
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M54
- Linear Element Model
- The Network Model
- Linear Element Id
- {5AB80817-F8D2-4B97-8A28-6F1C6CC1ED8E}
- Linear Element Type
- B Carriageway
- From Distance
- 170 m
- To Distance
- 709 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.686426 -2.461528 52.686348 -2.461082 52.686163 -2.46003 52.685873 -2.45837 52.685547 -2.456591 52.685353 -2.455702 52.68493 -2.453954
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.453954, 52.684930
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.453954,
52.68493
],
[
-2.452488,
52.684514
],
[
-2.461528,
52.686426
],
[
-2.461082,
52.686348
],
[
-2.46003,
52.686163
],
[
-2.45837,
52.685873
],
[
-2.456591,
52.685547
],
[
-2.455702,
52.685353
],
[
-2.453954,
52.68493
]
]
]
}
View road section coordinates
[
[
[
-2.453954,
52.68493
],
[
-2.452488,
52.684514
],
[
-2.461528,
52.686426
],
[
-2.461082,
52.686348
],
[
-2.46003,
52.686163
],
[
-2.45837,
52.685873
],
[
-2.456591,
52.685547
],
[
-2.455702,
52.685353
],
[
-2.453954,
52.68493
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 5, 2026 10:30 AM
- Record versioned
- Sat, Oct 24, 2026 3:33 AM
- Coordinate source
- Geometry
Driving on the M54? See every live closure, roadwork and planned restriction on this road.
M54 live closuresRelated incidents
Jct 1 entry slip lane closures eastbound
Cleared Roadworks National HighwaysCleared 24 minutes 24 seconds ago
Jct 1 entry slip lane closures eastbound
M54 eastbound Jct 5 to Jct 4 carriageway closure
Cleared Roadworks National HighwaysCleared 54 minutes 25 seconds ago
M54 eastbound Jct 5 to Jct 4 carriageway closure
Lane 1 closure eastbound
Cleared Roadworks National HighwaysCleared 1 hour 44 minutes ago
Lane 1 closure eastbound
Lane 1 closure eastbound
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
Lane 1 closure eastbound
Lane 2 closure eastbound
Cleared Roadworks National HighwaysCleared 2 days 1 hour ago
Lane 2 closure eastbound
M54 eastbound Jct 7 to Jct 6 carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 23 hours ago
M54 eastbound Jct 7 to Jct 6 carriageway closure