Lane closure southbound including gap closure
PlannedLane closure southbound including gap closure
- Start time
- Mon, Dec 8, 2025 8:00 PM
- Expected end
- Tue, Dec 9, 2025 6:00 AM
- Duration
- 10 hours
- Road
- A1 – A1 Southbound Between B1174 Near Grantham (South) And B6403
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Nov 26, 2025 3:14 AM
- Last updated
- Mon, Dec 8, 2025 7:02 AM
- Cleared
- Tue, Dec 9, 2025 6:00 AM
- Latest update: Lane closure southbound including gap closure
- Coordinates
- 52.828489, -0.631098
- Latitude span
- 52.828265 – 52.828994
- Longitude span
- -0.631191 – -0.631045
- Bounding box centre
- 52.828630, -0.631118
- Location descriptions
-
- A1 southbound between B1174 near Grantham (south) and B6403
- Feed validity status
- Planned
- Overall feed start
- Mon, Dec 8, 2025 8:00 PM
- Overall feed end
- Tue, Dec 9, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A1 southbound between B1174 near Grantham (south) and B6403
- Carriageway
- Dual Carriageway
- Lane Usage
- Nl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1
- Linear Element Model
- The Network Model
- Linear Element Id
- {6E90FAC3-2D12-40F4-A518-93417C1761D1}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 4 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.828301 -0.631058 52.828265 -0.631045
Segment 2
3 coordinate pairs- Description
- A1 southbound between B1174 near Grantham (south) and B6403
- Carriageway
- Dual Carriageway
- Lane Usage
- Nl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1
- Linear Element Model
- The Network Model
- Linear Element Id
- {5E0A9A8A-F55B-4275-8B3F-CF8996505647}
- Linear Element Type
- B Carriageway
- From Distance
- 125 m
- To Distance
- 202 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.828994 -0.631191 52.828583 -0.63114 52.828301 -0.631058
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -0.631058, 52.828301
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.631058,
52.828301
],
[
-0.631045,
52.828265
],
[
-0.631191,
52.828994
],
[
-0.63114,
52.828583
],
[
-0.631058,
52.828301
]
]
]
}
View road section coordinates
[
[
[
-0.631058,
52.828301
],
[
-0.631045,
52.828265
],
[
-0.631191,
52.828994
],
[
-0.63114,
52.828583
],
[
-0.631058,
52.828301
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Grantham
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 45
- Record created
- Wed, Nov 26, 2025 3:14 AM
- Record versioned
- Mon, Dec 8, 2025 7:02 AM
- Coordinate source
- Geometry
Related incidents
A1 Jct 71 Northbound Exit Slip Road Closure
Active National HighwaysA1 Jct 71 Northbound Exit Slip Road Closure
A1 Felton to Newton-on-the-Moor northbound lane 2 closure
Planned National HighwaysA1 Felton to Newton-on-the-Moor northbound lane 2 closure
A1 Blagdon to Seaton Burn southbound lane 2 closure
Active National HighwaysA1 Blagdon to Seaton Burn southbound lane 2 closure
A1 Jct 71 Northbound Exit Slip Road Closure
Cleared National HighwaysA1 Jct 71 Northbound Exit Slip Road Closure
A1 Jct 71 Northbound Exit Slip Road Closure
Planned National HighwaysA1 Jct 71 Northbound Exit Slip Road Closure
A1 Felton to Newton-on-the-Moor northbound lane 2 closure
Planned National HighwaysA1 Felton to Newton-on-the-Moor northbound lane 2 closure