Lane closure northbound including gap closure
PlannedLane closure northbound including gap closure
- Start time
- Mon, Dec 15, 2025 8:00 PM
- Expected end
- Tue, Dec 16, 2025 6:00 AM
- Duration
- 10 hours
- Road
- A1 – A1 Northbound Between B6403 And B1174 Near Grantham (South)
- Category
- Construction Work
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Dec 3, 2025 2:40 AM
- Last updated
- Mon, Dec 15, 2025 10:53 AM
- Cleared
- Tue, Dec 16, 2025 6:00 AM
- Latest update: Lane closure northbound including gap closure
- Coordinates
- 52.835732, -0.629787
- Latitude span
- 52.835414 – 52.835937
- Longitude span
- -0.629876 – -0.629725
- Bounding box centre
- 52.835676, -0.629801
- Location descriptions
-
- A1 northbound between B6403 and B1174 near Grantham (south)
- Feed validity status
- Planned
- Overall feed start
- Mon, Dec 15, 2025 8:00 PM
- Overall feed end
- Tue, Dec 16, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A1 northbound between B6403 and B1174 near Grantham (south)
- Carriageway
- Dual Carriageway
- Lane Usage
- Nl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1
- Linear Element Model
- The Network Model
- Linear Element Id
- {4308F932-7217-47DF-A88F-E4E8B058EB4D}
- Linear Element Type
- A Carriageway
- From Distance
- 2 m
- To Distance
- 44 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.835414 -0.629876 52.835788 -0.629774
Segment 2
2 coordinate pairs- Description
- A1 northbound between B6403 and B1174 near Grantham (south)
- Carriageway
- Dual Carriageway
- Lane Usage
- Nl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A1
- Linear Element Model
- The Network Model
- Linear Element Id
- {17861AC0-8492-4FE7-A536-7BF54DB5F345}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.835788 -0.629774 52.835937 -0.629725
- Geometry type
- MultiLineString
- Geometry points
- 4
- First coordinate pair
- -0.629876, 52.835414
- Road section segments
- 1
- Road section points
- 4
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.629876,
52.835414
],
[
-0.629774,
52.835788
],
[
-0.629774,
52.835788
],
[
-0.629725,
52.835937
]
]
]
}
View road section coordinates
[
[
[
-0.629876,
52.835414
],
[
-0.629774,
52.835788
],
[
-0.629774,
52.835788
],
[
-0.629725,
52.835937
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Grantham
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 46
- Record created
- Wed, Dec 3, 2025 2:40 AM
- Record versioned
- Mon, Dec 15, 2025 10:53 AM
- Coordinate source
- Geometry
Related incidents
A1 Jct 71 northbound exit slip road lane 1 closure
Planned National HighwaysA1 Jct 71 northbound exit slip road lane 1 closure
A1 Jct 71 Northbound Exit Slip Road Closure
Active National HighwaysA1 Jct 71 Northbound Exit Slip Road Closure
A1 Felton to Newton-on-the-Moor northbound lane 2 closure
Planned National HighwaysA1 Felton to Newton-on-the-Moor northbound lane 2 closure
A1 Blagdon to Seaton Burn southbound lane 2 closure
Active National HighwaysA1 Blagdon to Seaton Burn southbound lane 2 closure
A1 Jct 71 Northbound Exit Slip Road Closure
Cleared National HighwaysA1 Jct 71 Northbound Exit Slip Road Closure
A1 Jct 71 Northbound Exit Slip Road Closure
Cleared National HighwaysA1 Jct 71 Northbound Exit Slip Road Closure