Lane closure including emergency layby closure northbound
ClearedLane closure including emergency layby closure northbound
- Start time
- Fri, Aug 21, 2026 7:44 PM
- Expected end
- Sat, Aug 22, 2026 5:00 AM
- Duration
- 2 hours 36 minutes 2 seconds
- Road
- M1 – M1 Northbound Between J15A And J16
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 7:44 PM
- Last updated
- Fri, Aug 21, 2026 9:38 PM
- Cleared
- Fri, Aug 21, 2026 10:20 PM
- Latest update: Lane closure including emergency layby closure northbound
- Coordinates
- 52.223458, -0.984757
- Latitude span
- 52.222600 – 52.224469
- Longitude span
- -0.989264 – -0.980988
- Bounding box centre
- 52.223535, -0.985126
- Location descriptions
-
- M1 northbound between J15A and J16
- Feed validity status
- Active
- Overall feed start
- Fri, Aug 21, 2026 7:44 PM
- Overall feed end
- Sat, Aug 22, 2026 5:00 AM
- Feed window length
- 9 hours 16 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M1 northbound between J15A and J16
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {C1D09E7F-9C52-4644-97E1-1777F3537044}
- Linear Element Type
- A Carriageway
- From Distance
- 358 m
- To Distance
- 746 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.2226 -0.980988 52.222757 -0.981665 52.223298 -0.984007 52.223813 -0.986308
Segment 2
2 coordinate pairs- Description
- M1 northbound between J15A and J16
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {5476F9C8-CA54-4C13-81C8-A3C8E83B50C5}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 214 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.223813 -0.986308 52.224469 -0.989264
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.980988, 52.222600
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.980988,
52.2226
],
[
-0.981665,
52.222757
],
[
-0.984007,
52.223298
],
[
-0.986308,
52.223813
],
[
-0.986308,
52.223813
],
[
-0.989264,
52.224469
]
]
]
}
View road section coordinates
[
[
[
-0.980988,
52.2226
],
[
-0.981665,
52.222757
],
[
-0.984007,
52.223298
],
[
-0.986308,
52.223813
],
[
-0.986308,
52.223813
],
[
-0.989264,
52.224469
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 21, 2026 7:44 PM
- Record versioned
- Fri, Aug 21, 2026 9:38 PM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 southbound Jct 35A to Jct 35 lane 1 closure ( 268/6 268/2)
Active Roadworks National HighwaysExpected to clear in 5 hours 14 minutes
M1 southbound Jct 35A to Jct 35 lane 1 closure ( 268/6 268/2)
Lane 1,2 closure southbound (site 2)
Active Roadworks National HighwaysExpected to clear in 5 hours 14 minutes
Lane 1,2 closure southbound (site 2)
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 2 months 2 days
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M1 southbound Jct 15 to Jct 14 lane 4,3,2 closures (MP 82/1 to 80/7)
Cleared Roadworks National HighwaysCleared 2 hours 5 minutes ago
M1 southbound Jct 15 to Jct 14 lane 4,3,2 closures (MP 82/1 to 80/7)
M1 southbound Jct 14 to Jct 11A carriageway closure
Cleared Roadworks National HighwaysCleared 2 hours 45 minutes ago
M1 southbound Jct 14 to Jct 11A carriageway closure
M1 northbound Jct 40 to Jct 41 Lane 1 and 2 closure (294/8 - 296/7)
Cleared Roadworks National HighwaysCleared 3 hours 45 minutes ago
M1 northbound Jct 40 to Jct 41 Lane 1 and 2 closure (294/8 - 296/7)