Lane closure eastbound
PlannedLane closure eastbound
- Start time
- Mon, Aug 24, 2026 7:00 PM
- Expected end
- Tue, Aug 25, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A14 – A14 Eastbound Between J1 And J2
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 3, 2026 12:20 PM
- Last updated
- Mon, Aug 24, 2026 12:23 AM
- Cleared
- Tue, Aug 25, 2026 5:00 AM
- Latest update: Lane closure eastbound
- Coordinates
- 52.405656, -0.949130
- Latitude span
- 52.401872 – 52.407107
- Longitude span
- -0.966719 – -0.933677
- Bounding box centre
- 52.404490, -0.950198
- Location descriptions
-
- A14 eastbound between J1 and J2
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 24, 2026 7:00 PM
- Overall feed end
- Tue, Aug 25, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
19 coordinate pairs- Description
- A14 eastbound between J1 and J2
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {2343D55B-06EC-4B68-89B4-5697B0A5A8E2}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 786 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.405578 -0.943488 52.405466 -0.94305 52.405432 -0.942918 52.405308 -0.942451 52.405114 -0.941823 52.404947 -0.941254 52.404771 -0.940714 52.404568 -0.940117 52.404264 -0.939286 52.404135 -0.938951 52.403896 -0.938339 52.403749 -0.93799 52.403547 -0.93751 52.403225 -0.936783 52.402639 -0.935533 52.402225 -0.934572 52.402152 -0.934387 52.401885 -0.933713 52.401872 -0.933677
Segment 2
35 coordinate pairs- Description
- A14 eastbound between J1 and J2
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A14
- Linear Element Model
- The Network Model
- Linear Element Id
- {0D32AA6F-044F-47DD-B983-C7F232D7D6B1}
- Linear Element Type
- A Carriageway
- From Distance
- 110 m
- To Distance
- 1,729 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.405922 -0.966719 52.406091 -0.965923 52.406178 -0.965509 52.406341 -0.964653 52.406469 -0.9639 52.406597 -0.963045 52.406647 -0.962661 52.406748 -0.961909 52.406815 -0.96129 52.406873 -0.960715 52.406915 -0.960362 52.406979 -0.959463 52.407049 -0.958315 52.40708 -0.957712 52.407093 -0.957138 52.407107 -0.955668 52.4071 -0.954845 52.407089 -0.95433 52.407084 -0.954066 52.40704 -0.95317 52.407039 -0.953155 52.406967 -0.951996 52.406896 -0.95113 52.406778 -0.950001 52.406739 -0.949634 52.406652 -0.948975 52.406546 -0.948213 52.406394 -0.947305 52.406291 -0.946705 52.406243 -0.946427 52.406064 -0.945534 52.405877 -0.944686 52.405726 -0.944072 52.405643 -0.943736 52.405578 -0.943488
- Geometry type
- MultiLineString
- Geometry points
- 54
- First coordinate pair
- -0.943488, 52.405578
- Road section segments
- 1
- Road section points
- 54
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.943488,
52.405578
],
[
-0.94305,
52.405466
],
[
-0.942918,
52.405432
],
[
-0.942451,
52.405308
],
[
-0.941823,
52.405114
],
[
-0.941254,
52.404947
],
[
-0.940714,
52.404771
],
[
-0.940117,
52.404568
],
[
-0.939286,
52.404264
],
[
-0.938951,
52.404135
],
[
-0.938339,
52.403896
],
[
-0.93799,
52.403749
],
[
-0.93751,
52.403547
],
[
-0.936783,
52.403225
],
[
-0.935533,
52.402639
],
[
-0.934572,
52.402225
],
[
-0.934387,
52.402152
],
[
-0.933713,
52.401885
],
[
-0.933677,
52.401872
],
[
-0.966719,
52.405922
],
[
-0.965923,
52.406091
],
[
-0.965509,
52.406178
],
[
-0.964653,
52.406341
],
[
-0.9639,
52.406469
],
[
-0.963045,
52.406597
],
[
-0.962661,
52.406647
],
[
-0.961909,
52.406748
],
[
-0.96129,
52.406815
],
[
-0.960715,
52.406873
],
[
-0.960362,
52.406915
],
[
-0.959463,
52.406979
],
[
-0.958315,
52.407049
],
[
-0.957712,
52.40708
],
[
-0.957138,
52.407093
],
[
-0.955668,
52.407107
],
[
-0.954845,
52.4071
],
[
-0.95433,
52.407089
],
[
-0.954066,
52.407084
],
[
-0.95317,
52.40704
],
[
-0.953155,
52.407039
],
[
-0.951996,
52.406967
],
[
-0.95113,
52.406896
],
[
-0.950001,
52.406778
],
[
-0.949634,
52.406739
],
[
-0.948975,
52.406652
],
[
-0.948213,
52.406546
],
[
-0.947305,
52.406394
],
[
-0.946705,
52.406291
],
[
-0.946427,
52.406243
],
[
-0.945534,
52.406064
],
[
-0.944686,
52.405877
],
[
-0.944072,
52.405726
],
[
-0.943736,
52.405643
],
[
-0.943488,
52.405578
]
]
]
}
View road section coordinates
[
[
[
-0.943488,
52.405578
],
[
-0.94305,
52.405466
],
[
-0.942918,
52.405432
],
[
-0.942451,
52.405308
],
[
-0.941823,
52.405114
],
[
-0.941254,
52.404947
],
[
-0.940714,
52.404771
],
[
-0.940117,
52.404568
],
[
-0.939286,
52.404264
],
[
-0.938951,
52.404135
],
[
-0.938339,
52.403896
],
[
-0.93799,
52.403749
],
[
-0.93751,
52.403547
],
[
-0.936783,
52.403225
],
[
-0.935533,
52.402639
],
[
-0.934572,
52.402225
],
[
-0.934387,
52.402152
],
[
-0.933713,
52.401885
],
[
-0.933677,
52.401872
],
[
-0.966719,
52.405922
],
[
-0.965923,
52.406091
],
[
-0.965509,
52.406178
],
[
-0.964653,
52.406341
],
[
-0.9639,
52.406469
],
[
-0.963045,
52.406597
],
[
-0.962661,
52.406647
],
[
-0.961909,
52.406748
],
[
-0.96129,
52.406815
],
[
-0.960715,
52.406873
],
[
-0.960362,
52.406915
],
[
-0.959463,
52.406979
],
[
-0.958315,
52.407049
],
[
-0.957712,
52.40708
],
[
-0.957138,
52.407093
],
[
-0.955668,
52.407107
],
[
-0.954845,
52.4071
],
[
-0.95433,
52.407089
],
[
-0.954066,
52.407084
],
[
-0.95317,
52.40704
],
[
-0.953155,
52.407039
],
[
-0.951996,
52.406967
],
[
-0.95113,
52.406896
],
[
-0.950001,
52.406778
],
[
-0.949634,
52.406739
],
[
-0.948975,
52.406652
],
[
-0.948213,
52.406546
],
[
-0.947305,
52.406394
],
[
-0.946705,
52.406291
],
[
-0.946427,
52.406243
],
[
-0.945534,
52.406064
],
[
-0.944686,
52.405877
],
[
-0.944072,
52.405726
],
[
-0.943736,
52.405643
],
[
-0.943488,
52.405578
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Aug 3, 2026 12:20 PM
- Record versioned
- Mon, Aug 24, 2026 12:23 AM
- Coordinate source
- Geometry
Driving on the A14? See every live closure, roadwork and planned restriction on this road.
A14 live closuresRelated incidents
A14 eastbound Jct 47 to Jct 50 lane 2 closure (MP 167/5 to 168/5)
Planned Roadworks National HighwaysStarts in 18 hours 20 minutes
A14 eastbound Jct 47 to Jct 50 lane 2 closure (MP 167/5 to 168/5)
A14 eastbound Jct 51 lane 1 closure (MP 175/4 to 177/6)
Planned Roadworks National HighwaysStarts in 18 hours 20 minutes
A14 eastbound Jct 51 lane 1 closure (MP 175/4 to 177/6)
A14 eastbound Jct 20 to Jct 21 lane 1 closure (MP 66/5 to 67/3)
Planned Roadworks National HighwaysStarts in 17 hours 20 minutes
A14 eastbound Jct 20 to Jct 21 lane 1 closure (MP 66/5 to 67/3)
A14 eastbound approach to Jct 35 lane closure
Planned Roadworks National HighwaysStarts in 17 hours 20 minutes
A14 eastbound approach to Jct 35 lane closure
M6 to M1 southbound link road closure
Planned Roadworks National HighwaysStarts in 17 hours 20 minutes
M6 to M1 southbound link road closure
Lane 1,2 closure northbound
Planned Roadworks National HighwaysStarts in 17 hours 20 minutes
Lane 1,2 closure northbound