Lane closure eastbound
ClearedLane closure eastbound
- Start time
- Fri, Feb 13, 2026 8:00 PM
- Expected end
- Sat, Feb 14, 2026 6:00 AM
- Duration
- 10 hours
- Road
- A52 – A52 Eastbound Between A5111 And M1
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Feb 3, 2026 8:28 AM
- Last updated
- Fri, Feb 13, 2026 8:21 PM
- Cleared
- Sat, Feb 14, 2026 6:00 AM
- Latest update: Lane closure eastbound
- Coordinates
- 52.912043, -1.369133
- Latitude span
- 52.911859 – 52.912252
- Longitude span
- -1.370942 – -1.367248
- Bounding box centre
- 52.912056, -1.369095
- Location descriptions
-
- A52 eastbound between A5111 and M1
- Feed validity status
- Planned
- Overall feed start
- Fri, Feb 13, 2026 8:00 PM
- Overall feed end
- Sat, Feb 14, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A52 eastbound between A5111 and M1
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A52
- Linear Element Model
- The Network Model
- Linear Element Id
- {056824E4-E6FC-41B8-B1FD-51B50F81DCD9}
- Linear Element Type
- A Carriageway
- From Distance
- 366 m
- To Distance
- 507 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.912252 -1.370942 52.912143 -1.370123 52.912068 -1.369455 52.912043 -1.369203 52.912011 -1.368891
Segment 2
3 coordinate pairs- Description
- A52 eastbound between A5111 and M1
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A52
- Linear Element Model
- The Network Model
- Linear Element Id
- {4DE1F316-36B0-41D6-B453-586AFD6E2F16}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 111 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.912011 -1.368891 52.911954 -1.368311 52.911859 -1.367248
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.370942, 52.912252
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.370942,
52.912252
],
[
-1.370123,
52.912143
],
[
-1.369455,
52.912068
],
[
-1.369203,
52.912043
],
[
-1.368891,
52.912011
],
[
-1.368891,
52.912011
],
[
-1.368311,
52.911954
],
[
-1.367248,
52.911859
]
]
]
}
View road section coordinates
[
[
[
-1.370942,
52.912252
],
[
-1.370123,
52.912143
],
[
-1.369455,
52.912068
],
[
-1.369203,
52.912043
],
[
-1.368891,
52.912011
],
[
-1.368891,
52.912011
],
[
-1.368311,
52.911954
],
[
-1.367248,
52.911859
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Feb 3, 2026 8:28 AM
- Record versioned
- Fri, Feb 13, 2026 8:21 PM
- Coordinate source
- Geometry
Driving on the A52? See every live closure, roadwork and planned restriction on this road.
A52 live closuresRelated incidents
A52 eastbound Dunkirk exit slip road closure
Cleared Roadworks National HighwaysCleared 1 day 18 hours ago
A52 eastbound Dunkirk exit slip road closure
Lane closure eastbound (site 2)
Cleared Roadworks National HighwaysCleared 1 day 19 hours ago
Lane closure eastbound (site 2)
Lane closure including Nottingham Knight roundabout eastbound
Cleared Roadworks National HighwaysCleared 1 day 22 hours ago
Lane closure including Nottingham Knight roundabout eastbound
A52 eastbound Priory Island to QMC carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 20 hours ago
A52 eastbound Priory Island to QMC carriageway closure
Lane closure eastbound (site 2)
Cleared Roadworks National HighwaysCleared 2 days 21 hours ago
Lane closure eastbound (site 2)
A52 westbound M1 Jct 25 exit slip road lane closure
Cleared Roadworks National HighwaysCleared 2 days 19 hours ago
A52 westbound M1 Jct 25 exit slip road lane closure