Lane 2 closure northbound
ClearedLane 2 closure northbound
- Start time
- Tue, Oct 6, 2026 8:00 PM
- Expected end
- Wed, Oct 7, 2026 5:00 AM
- Duration
- 3 hours 45 minutes 2 seconds
- Road
- A38 – A38 Northbound Between A5121 Near Burton Upon Trent (South) And A5121 Near Burton Upon Trent (North)
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 6, 2026 7:30 PM
- Last updated
- Tue, Oct 6, 2026 11:09 PM
- Cleared
- Tue, Oct 6, 2026 11:45 PM
- Latest update: Lane 2 closure northbound
- Coordinates
- 52.827434, -1.630193
- Latitude span
- 52.825593 – 52.829751
- Longitude span
- -1.632812 – -1.626488
- Bounding box centre
- 52.827672, -1.629650
- Location descriptions
-
- A38 northbound between A5121 near Burton upon Trent (south) and A5121 near Burton upon Trent (north)
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 6, 2026 8:00 PM
- Overall feed end
- Wed, Oct 7, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A38 northbound between A5121 near Burton upon Trent (south) and A5121 near Burton upon Trent (north)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A38
- Linear Element Model
- The Network Model
- Linear Element Id
- {920BDF8E-D7BE-4E57-9C76-E3E66854DAA4}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 259 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.828112 -1.629227 52.828318 -1.628899 52.828568 -1.628496 52.829751 -1.626488
Segment 2
7 coordinate pairs- Description
- A38 northbound between A5121 near Burton upon Trent (south) and A5121 near Burton upon Trent (north)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A38
- Linear Element Model
- The Network Model
- Linear Element Id
- {4FC8DC72-96E2-4DE1-81B4-08D7848760F0}
- Linear Element Type
- A Carriageway
- From Distance
- 823 m
- To Distance
- 1,193 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.825593 -1.632812 52.825964 -1.632332 52.826474 -1.63166 52.826645 -1.631451 52.826877 -1.631122 52.827361 -1.630406 52.828112 -1.629227
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -1.629227, 52.828112
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.629227,
52.828112
],
[
-1.628899,
52.828318
],
[
-1.628496,
52.828568
],
[
-1.626488,
52.829751
],
[
-1.632812,
52.825593
],
[
-1.632332,
52.825964
],
[
-1.63166,
52.826474
],
[
-1.631451,
52.826645
],
[
-1.631122,
52.826877
],
[
-1.630406,
52.827361
],
[
-1.629227,
52.828112
]
]
]
}
View road section coordinates
[
[
[
-1.629227,
52.828112
],
[
-1.628899,
52.828318
],
[
-1.628496,
52.828568
],
[
-1.626488,
52.829751
],
[
-1.632812,
52.825593
],
[
-1.632332,
52.825964
],
[
-1.63166,
52.826474
],
[
-1.631451,
52.826645
],
[
-1.631122,
52.826877
],
[
-1.630406,
52.827361
],
[
-1.629227,
52.828112
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Burton upon Trent
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Tue, Oct 6, 2026 7:30 PM
- Record versioned
- Tue, Oct 6, 2026 11:09 PM
- Coordinate source
- Geometry
Driving on the A38? See every live closure, roadwork and planned restriction on this road.
A38 live closuresRelated incidents
A38 westbound Saltash Tunnel to Carkeel Roundabout carriageway closed
Active Roadworks National HighwaysExpected to clear in 9 hours 4 minutes
A38 westbound Saltash Tunnel to Carkeel Roundabout carriageway closed
A38 eastbound Liskeard layby closure
Planned Roadworks National HighwaysExpected to clear in 2 days 20 hours
A38 eastbound Liskeard layby closure
A38 eastbound Wobbly Wheel to M5 Jct 31 carriageway closure
Cleared Roadworks National HighwaysCleared 55 minutes 11 seconds ago
A38 eastbound Wobbly Wheel to M5 Jct 31 carriageway closure
Lane closure northbound including roundabout
Cleared Roadworks National HighwaysCleared 10 seconds ago
Lane closure northbound including roundabout
Lane closure northbound including roundabout
Cleared Roadworks National HighwaysCleared 55 minutes 11 seconds ago
Lane closure northbound including roundabout
A38 eastbound Carkeel roundabout to Saltash Tunnel carriageway closed
Cleared Roadworks National HighwaysCleared 1 hour 10 minutes ago
A38 eastbound Carkeel roundabout to Saltash Tunnel carriageway closed