Lane 1,2 closure southbound
PlannedLane 1,2 closure southbound
- Start time
- Thu, Aug 6, 2026 7:00 PM
- Expected end
- Fri, Aug 7, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M1 – M1 Southbound Between J17 And J16
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 22, 2026 2:05 PM
- Last updated
- Thu, Aug 6, 2026 10:39 AM
- Cleared
- Fri, Aug 7, 2026 5:00 AM
- Latest update: Lane 1,2 closure southbound
- Coordinates
- 52.245067, -1.058200
- Latitude span
- 52.242108 – 52.247031
- Longitude span
- -1.062473 – -1.051776
- Bounding box centre
- 52.244570, -1.057125
- Location descriptions
-
- M1 southbound between J17 and J16
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 6, 2026 7:00 PM
- Overall feed end
- Fri, Aug 7, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M1 southbound between J17 and J16
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {F10363D7-B5CD-4ED4-8A2C-18DEADBD5D41}
- Linear Element Type
- B Carriageway
- From Distance
- 988 m
- To Distance
- 1,219 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.247031 -1.062473 52.245819 -1.059832 52.245792 -1.059774
Segment 2
4 coordinate pairs- Description
- M1 southbound between J17 and J16
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {2C4A5917-73D0-4DA3-92B1-E4BA479EBE51}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 682 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.245792 -1.059774 52.245517 -1.059176 52.243413 -1.054595 52.242108 -1.051776
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.062473, 52.247031
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.062473,
52.247031
],
[
-1.059832,
52.245819
],
[
-1.059774,
52.245792
],
[
-1.059774,
52.245792
],
[
-1.059176,
52.245517
],
[
-1.054595,
52.243413
],
[
-1.051776,
52.242108
]
]
]
}
View road section coordinates
[
[
[
-1.062473,
52.247031
],
[
-1.059832,
52.245819
],
[
-1.059774,
52.245792
],
[
-1.059774,
52.245792
],
[
-1.059176,
52.245517
],
[
-1.054595,
52.243413
],
[
-1.051776,
52.242108
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Jul 22, 2026 2:05 PM
- Record versioned
- Thu, Aug 6, 2026 10:39 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 2 months 2 weeks
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M1 southbound Jct 15 to Jct 14 lanes 1 and 2 closure
Planned Roadworks National HighwaysStarts in 10 hours 12 minutes
M1 southbound Jct 15 to Jct 14 lanes 1 and 2 closure
Lane 3,4 closure southbound
Planned Roadworks National HighwaysStarts in 8 hours 12 minutes
Lane 3,4 closure southbound
M1 northbound Jct 33 entry slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 12 minutes
M1 northbound Jct 33 entry slip road closure
M1 northbound Jct 37 to Jct 38 lane 1 and 2 closure (281/0 - 281/6)
Planned Roadworks National HighwaysStarts in 8 hours 12 minutes
M1 northbound Jct 37 to Jct 38 lane 1 and 2 closure (281/0 - 281/6)
M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)
Planned Roadworks National HighwaysStarts in 8 hours 12 minutes
M1 southbound Jct 37 to Jct 36 lane 1 and 2 closure ( 274/6 273/7)