Lane 1 closure northbound
ClearedLane 1 closure northbound
- Start time
- Fri, Oct 9, 2026 7:00 PM
- Expected end
- Sat, Oct 10, 2026 5:00 AM
- Duration
- 9 hours 20 minutes 2 seconds
- Road
- M1 – M1 Northbound Within J23
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 6, 2026 12:18 PM
- Last updated
- Sat, Oct 10, 2026 3:54 AM
- Cleared
- Sat, Oct 10, 2026 4:20 AM
- Latest update: Lane 1 closure northbound
- Coordinates
- 52.761102, -1.274136
- Latitude span
- 52.760009 – 52.762741
- Longitude span
- -1.274271 – -1.274069
- Bounding box centre
- 52.761375, -1.274170
- Location descriptions
-
- M1 northbound within J23
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 9, 2026 7:00 PM
- Overall feed end
- Sat, Oct 10, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M1 northbound within J23
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {D6B35581-9516-4108-AD1D-34C6FF95F3C9}
- Linear Element Type
- A Carriageway
- From Distance
- 23 m
- To Distance
- 102 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.760009 -1.274069 52.760219 -1.27408 52.760489 -1.27409 52.760714 -1.274101
Segment 2
5 coordinate pairs- Description
- M1 northbound within J23
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {0C44CC0A-9285-42BB-874A-314D7F6EC973}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 225 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.760714 -1.274101 52.760849 -1.274099 52.76164 -1.27416 52.76254 -1.274249 52.762741 -1.274271
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -1.274069, 52.760009
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.274069,
52.760009
],
[
-1.27408,
52.760219
],
[
-1.27409,
52.760489
],
[
-1.274101,
52.760714
],
[
-1.274101,
52.760714
],
[
-1.274099,
52.760849
],
[
-1.27416,
52.76164
],
[
-1.274249,
52.76254
],
[
-1.274271,
52.762741
]
]
]
}
View road section coordinates
[
[
[
-1.274069,
52.760009
],
[
-1.27408,
52.760219
],
[
-1.27409,
52.760489
],
[
-1.274101,
52.760714
],
[
-1.274101,
52.760714
],
[
-1.274099,
52.760849
],
[
-1.27416,
52.76164
],
[
-1.274249,
52.76254
],
[
-1.274271,
52.762741
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 8
- Record created
- Tue, Oct 6, 2026 12:18 PM
- Record versioned
- Sat, Oct 10, 2026 3:54 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 1 week 4 days
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M1 southbound Jct 15 to Jct 14 lane closure
Planned Roadworks National HighwaysStarts in 16 hours 40 minutes
M1 southbound Jct 15 to Jct 14 lane closure
M1 Southbound Jct 5 to Jct 4 lane 3,2 closure
Planned Roadworks National HighwaysStarts in 16 hours 40 minutes
M1 Southbound Jct 5 to Jct 4 lane 3,2 closure
M1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
Planned Roadworks National HighwaysStarts in 15 hours 40 minutes
M1 southbound Approach to Jct 9 lane 1 closure (MP 46/5 to 45/7)
M1 southbound Jct 12 exit slip road hard shoulder closure and lane 2 closure (MP 63/9 to 62/5)
Planned Roadworks National HighwaysStarts in 15 hours 40 minutes
M1 southbound Jct 12 exit slip road hard shoulder closure and lane 2 closure (MP 63/9 to 62/5)
Lane 1,2,3 closure northbound
Planned Roadworks National HighwaysStarts in 14 hours 40 minutes
Lane 1,2,3 closure northbound