Lane 1 closure northbound
ClearedLane 1 closure northbound
- Start time
- Mon, Sep 14, 2026 8:00 PM
- Expected end
- Tue, Sep 15, 2026 5:00 AM
- Duration
- 7 hours 50 minutes 1 second
- Road
- A500 – A500 Northbound Between A34 Near Stoke-On-Trent (North) And M6
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 1, 2026 9:41 AM
- Last updated
- Tue, Sep 15, 2026 3:30 AM
- Cleared
- Tue, Sep 15, 2026 3:50 AM
- Latest update: Lane 1 closure northbound
- Coordinates
- 53.069461, -2.324749
- Latitude span
- 53.068881 – 53.069880
- Longitude span
- -2.331915 – -2.316909
- Bounding box centre
- 53.069381, -2.324412
- Location descriptions
-
- A500 northbound between A34 near Stoke-on-Trent (north) and M6
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 14, 2026 8:00 PM
- Overall feed end
- Tue, Sep 15, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
13 coordinate pairs- Description
- A500 northbound between A34 near Stoke-on-Trent (north) and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A500
- Linear Element Model
- The Network Model
- Linear Element Id
- {ED7BA1C6-CD05-4158-A881-B4F4ABB90783}
- Linear Element Type
- A Carriageway
- From Distance
- 431 m
- To Distance
- 971 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.068881 -2.316909 53.068881 -2.317128 53.068906 -2.317859 53.068922 -2.318292 53.068931 -2.318516 53.068974 -2.319128 53.069097 -2.320323 53.069244 -2.321241 53.06946 -2.322437 53.069619 -2.323256 53.069761 -2.324153 53.069802 -2.324547 53.069821 -2.324776
Segment 2
16 coordinate pairs- Description
- A500 northbound between A34 near Stoke-on-Trent (north) and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A500
- Linear Element Model
- The Network Model
- Linear Element Id
- {232236F0-355D-4C79-B6F0-F5A58BDE682F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 494 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.069821 -2.324776 53.069865 -2.325314 53.069873 -2.325702 53.069877 -2.32606 53.06988 -2.326389 53.06988 -2.326583 53.069851 -2.327164 53.069787 -2.327806 53.069759 -2.328149 53.069658 -2.328745 53.069612 -2.329028 53.06953 -2.329401 53.069448 -2.329788 53.069294 -2.330458 53.068979 -2.331878 53.068968 -2.331915
- Geometry type
- MultiLineString
- Geometry points
- 29
- First coordinate pair
- -2.316909, 53.068881
- Road section segments
- 1
- Road section points
- 29
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.316909,
53.068881
],
[
-2.317128,
53.068881
],
[
-2.317859,
53.068906
],
[
-2.318292,
53.068922
],
[
-2.318516,
53.068931
],
[
-2.319128,
53.068974
],
[
-2.320323,
53.069097
],
[
-2.321241,
53.069244
],
[
-2.322437,
53.06946
],
[
-2.323256,
53.069619
],
[
-2.324153,
53.069761
],
[
-2.324547,
53.069802
],
[
-2.324776,
53.069821
],
[
-2.324776,
53.069821
],
[
-2.325314,
53.069865
],
[
-2.325702,
53.069873
],
[
-2.32606,
53.069877
],
[
-2.326389,
53.06988
],
[
-2.326583,
53.06988
],
[
-2.327164,
53.069851
],
[
-2.327806,
53.069787
],
[
-2.328149,
53.069759
],
[
-2.328745,
53.069658
],
[
-2.329028,
53.069612
],
[
-2.329401,
53.06953
],
[
-2.329788,
53.069448
],
[
-2.330458,
53.069294
],
[
-2.331878,
53.068979
],
[
-2.331915,
53.068968
]
]
]
}
View road section coordinates
[
[
[
-2.316909,
53.068881
],
[
-2.317128,
53.068881
],
[
-2.317859,
53.068906
],
[
-2.318292,
53.068922
],
[
-2.318516,
53.068931
],
[
-2.319128,
53.068974
],
[
-2.320323,
53.069097
],
[
-2.321241,
53.069244
],
[
-2.322437,
53.06946
],
[
-2.323256,
53.069619
],
[
-2.324153,
53.069761
],
[
-2.324547,
53.069802
],
[
-2.324776,
53.069821
],
[
-2.324776,
53.069821
],
[
-2.325314,
53.069865
],
[
-2.325702,
53.069873
],
[
-2.32606,
53.069877
],
[
-2.326389,
53.06988
],
[
-2.326583,
53.06988
],
[
-2.327164,
53.069851
],
[
-2.327806,
53.069787
],
[
-2.328149,
53.069759
],
[
-2.328745,
53.069658
],
[
-2.329028,
53.069612
],
[
-2.329401,
53.06953
],
[
-2.329788,
53.069448
],
[
-2.330458,
53.069294
],
[
-2.331878,
53.068979
],
[
-2.331915,
53.068968
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 1, 2026 9:41 AM
- Record versioned
- Tue, Sep 15, 2026 3:30 AM
- Coordinate source
- Geometry
Driving on the A500? See every live closure, roadwork and planned restriction on this road.
A500 live closuresRelated incidents
Lane 2, 3 and 4 closure southbound
Active Roadworks National HighwaysExpected to clear in 5 hours 47 minutes
Lane 2, 3 and 4 closure southbound
A500 both directions Campbell Road over bridge carriageway closure
Active Roadworks National HighwaysExpected to clear in 3 months 3 days
A500 both directions Campbell Road over bridge carriageway closure
M6 southbound Jct 16 to Jct 15 carriageway closure
Cleared Roadworks National HighwaysCleared 3 hours 12 minutes ago
M6 southbound Jct 16 to Jct 15 carriageway closure
A500 northbound Campbell road link to Queensway roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 4 hours 12 minutes ago
A500 northbound Campbell road link to Queensway roundabout carriageway closure
A500 northbound Campbell road link to Queensway roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 18 hours ago
A500 northbound Campbell road link to Queensway roundabout carriageway closure
A500 southbound Wheldon exit slip road closure
Cleared Roadworks National HighwaysCleared 4 days 3 hours ago
A500 southbound Wheldon exit slip road closure