Lane 1 closure exit slip road northbound
ClearedLane 1 closure exit slip road northbound
- Start time
- Mon, Sep 28, 2026 8:00 PM
- Expected end
- Tue, Sep 29, 2026 5:00 AM
- Duration
- 7 hours 30 minutes 2 seconds
- Road
- M40 – M40 J15 Southbound Exit (Before Fast Slip)
- Category
- Road Maintenance
- Direction
- Southbound
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 21, 2026 11:56 AM
- Last updated
- Tue, Sep 29, 2026 3:15 AM
- Cleared
- Tue, Sep 29, 2026 3:30 AM
- Latest update: Lane 1 closure exit slip road northbound
- Coordinates
- 52.261603, -1.616264
- Latitude span
- 52.261081 – 52.262023
- Longitude span
- -1.617582 – -1.614404
- Bounding box centre
- 52.261552, -1.615993
- Location descriptions
-
- M40 J15 southbound exit (before fast slip)
- M40 J15 southbound exit (after fast slip)
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 28, 2026 8:00 PM
- Overall feed end
- Tue, Sep 29, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M40 J15 southbound exit (before fast slip)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {7F64333C-B909-4852-B9F8-5B77553095C8}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 103 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.26192 -1.617261 52.261733 -1.616691 52.26147 -1.615939
Segment 2
3 coordinate pairs- Description
- M40 J15 southbound exit (before fast slip)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {0E7F05B0-E1D3-4857-BB6A-D3FBED993BFD}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 11 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.261969 -1.617411 52.261954 -1.617363 52.26192 -1.617261
Segment 3
2 coordinate pairs- Description
- M40 J15 southbound exit (before fast slip)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {A429FAB1-CE2F-4401-91FA-FDC93758B8BE}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 200 m
- To Distance
- 213 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.262023 -1.617582 52.261969 -1.617411
Segment 4
5 coordinate pairs- Description
- M40 J15 southbound exit (after fast slip)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {1D05C5D7-79C4-4CA8-8044-F10574B5E43C}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 114 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.26147 -1.615939 52.261144 -1.61492 52.261099 -1.614704 52.261082 -1.614544 52.261081 -1.614404
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -1.617261, 52.261920
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.617261,
52.26192
],
[
-1.616691,
52.261733
],
[
-1.615939,
52.26147
],
[
-1.617411,
52.261969
],
[
-1.617363,
52.261954
],
[
-1.617261,
52.26192
],
[
-1.617582,
52.262023
],
[
-1.617411,
52.261969
],
[
-1.615939,
52.26147
],
[
-1.61492,
52.261144
],
[
-1.614704,
52.261099
],
[
-1.614544,
52.261082
],
[
-1.614404,
52.261081
]
]
]
}
View road section coordinates
[
[
[
-1.617261,
52.26192
],
[
-1.616691,
52.261733
],
[
-1.615939,
52.26147
],
[
-1.617411,
52.261969
],
[
-1.617363,
52.261954
],
[
-1.617261,
52.26192
],
[
-1.617582,
52.262023
],
[
-1.617411,
52.261969
],
[
-1.615939,
52.26147
],
[
-1.61492,
52.261144
],
[
-1.614704,
52.261099
],
[
-1.614544,
52.261082
],
[
-1.614404,
52.261081
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Sep 21, 2026 11:56 AM
- Record versioned
- Tue, Sep 29, 2026 3:15 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
Hard shoulder closure northbound
Planned Roadworks National HighwaysExpected to clear in 4 hours 9 minutes
Hard shoulder closure northbound
M40 Northbound, Jct 11 entry slip road closure
Planned Roadworks National HighwaysStarts in 9 hours 24 minutes
M40 Northbound, Jct 11 entry slip road closure
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 17 hours 9 minutes
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
M40 Southbound Jct 5 to Jct 4 hard shoulder and lane 1 and 2 closure
Planned Roadworks National HighwaysStarts in 8 hours 9 minutes
M40 Southbound Jct 5 to Jct 4 hard shoulder and lane 1 and 2 closure
M40 Southbound Jct 4 to Jct 3 lane 3 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 8 hours 9 minutes
M40 Southbound Jct 4 to Jct 3 lane 3 and lane 2 closures.
A40 Eastbound Jct 1 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 8 hours 9 minutes
A40 Eastbound Jct 1 exit slip road lane 1 closure