Hardshoulder closure northbound
PlannedHardshoulder closure northbound
- Start time
- Fri, Aug 14, 2026 7:00 PM
- Expected end
- Sat, Aug 15, 2026 4:00 AM
- Duration
- 9 hours
- Road
- M1 – M1 Northbound Between J20 And J21
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 28, 2026 1:50 PM
- Last updated
- Fri, Aug 14, 2026 7:51 PM
- Cleared
- Sat, Aug 15, 2026 4:00 AM
- Latest update: Hardshoulder closure northbound
- Coordinates
- 52.595382, -1.195028
- Latitude span
- 52.593803 – 52.596859
- Longitude span
- -1.195227 – -1.194903
- Bounding box centre
- 52.595331, -1.195065
- Location descriptions
-
- M1 northbound between J20 and J21
- M1 northbound within J21
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 14, 2026 7:00 PM
- Overall feed end
- Sat, Aug 15, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M1 northbound between J20 and J21
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {3195B465-F973-41F9-94D0-0DDF5ECD0120}
- Linear Element Type
- A Carriageway
- From Distance
- 158 m
- To Distance
- 425 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.593803 -1.195227 52.594233 -1.195142 52.594763 -1.195074 52.595077 -1.195024 52.595922 -1.194964 52.5962 -1.194944
Segment 2
2 coordinate pairs- Description
- M1 northbound within J21
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {056B98F1-DE45-4554-991A-E81FB36C65BA}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 73 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.5962 -1.194944 52.596859 -1.194903
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.195227, 52.593803
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.195227,
52.593803
],
[
-1.195142,
52.594233
],
[
-1.195074,
52.594763
],
[
-1.195024,
52.595077
],
[
-1.194964,
52.595922
],
[
-1.194944,
52.5962
],
[
-1.194944,
52.5962
],
[
-1.194903,
52.596859
]
]
]
}
View road section coordinates
[
[
[
-1.195227,
52.593803
],
[
-1.195142,
52.594233
],
[
-1.195074,
52.594763
],
[
-1.195024,
52.595077
],
[
-1.194964,
52.595922
],
[
-1.194944,
52.5962
],
[
-1.194944,
52.5962
],
[
-1.194903,
52.596859
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 28, 2026 1:50 PM
- Record versioned
- Fri, Aug 14, 2026 7:51 PM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
Jct 26 entry slip road lane closure northbound
Planned Roadworks National HighwaysExpected to clear in 7 hours 40 minutes
Jct 26 entry slip road lane closure northbound
Lane 1,2 closure northbound
Planned Roadworks National HighwaysExpected to clear in 2 hours 40 minutes
Lane 1,2 closure northbound
Lane 1 closure southbound (Including lay by and speed restriction)
Active Roadworks National HighwaysExpected to clear in 1 day 8 hours
Lane 1 closure southbound (Including lay by and speed restriction)
M1 Northbound Jct 4 to Jct 5 Lane 3,2 closure
Planned Roadworks National HighwaysStarts in 1 hour 40 minutes
M1 Northbound Jct 4 to Jct 5 Lane 3,2 closure
M1 Northbound Jct 5 to Jct 6 Carriageway closure
Planned Roadworks National HighwaysStarts in 1 hour 40 minutes
M1 Northbound Jct 5 to Jct 6 Carriageway closure
M1 Northbound Jct 5 to Jct 6A lane 3,2 closure
Planned Roadworks National HighwaysStarts in 1 hour 40 minutes
M1 Northbound Jct 5 to Jct 6A lane 3,2 closure