Hard shoulder closure
Clearedhard shoulder closure
- Start time
- Fri, Jun 19, 2026 7:00 AM
- Expected end
- Fri, Jun 19, 2026 4:00 PM
- Duration
- 8 hours 50 minutes 1 second
- Road
- M5 – M5 Northbound Between J18A And J17
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jun 18, 2026 3:36 PM
- Last updated
- Fri, Jun 19, 2026 3:35 PM
- Cleared
- Fri, Jun 19, 2026 3:50 PM
- Latest update: hard shoulder closure
- Coordinates
- 51.514408, -2.649251
- Latitude span
- 51.512769 – 51.516161
- Longitude span
- -2.652636 – -2.645395
- Bounding box centre
- 51.514465, -2.649016
- Location descriptions
-
- M5 northbound between J18A and J17
- Feed validity status
- Planned
- Overall feed start
- Fri, Jun 19, 2026 7:00 AM
- Overall feed end
- Fri, Jun 19, 2026 4:00 PM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M5 northbound between J18A and J17
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D669A766-6231-4E74-92F7-2211E81C3AF9}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 116 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.515587 -2.646799 51.51577 -2.646354 51.515997 -2.64581 51.516161 -2.645395
Segment 2
10 coordinate pairs- Description
- M5 northbound between J18A and J17
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {600821EC-9D36-413F-A6ED-8463B7390329}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 467 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.51302 -2.652137 51.513216 -2.651748 51.513243 -2.651697 51.513265 -2.651651 51.513538 -2.651105 51.514147 -2.649866 51.514732 -2.648703 51.514968 -2.648202 51.515514 -2.64697 51.515587 -2.646799
Segment 3
2 coordinate pairs- Description
- M5 northbound between J18A and J17
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D76A6624-6EDD-4526-B157-BA8E8D554CC3}
- Linear Element Type
- B Carriageway
- From Distance
- 1,077 m
- To Distance
- 1,121 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.512769 -2.652636 51.51302 -2.652137
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -2.646799, 51.515587
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.646799,
51.515587
],
[
-2.646354,
51.51577
],
[
-2.64581,
51.515997
],
[
-2.645395,
51.516161
],
[
-2.652137,
51.51302
],
[
-2.651748,
51.513216
],
[
-2.651697,
51.513243
],
[
-2.651651,
51.513265
],
[
-2.651105,
51.513538
],
[
-2.649866,
51.514147
],
[
-2.648703,
51.514732
],
[
-2.648202,
51.514968
],
[
-2.64697,
51.515514
],
[
-2.646799,
51.515587
],
[
-2.652636,
51.512769
],
[
-2.652137,
51.51302
]
]
]
}
View road section coordinates
[
[
[
-2.646799,
51.515587
],
[
-2.646354,
51.51577
],
[
-2.64581,
51.515997
],
[
-2.645395,
51.516161
],
[
-2.652137,
51.51302
],
[
-2.651748,
51.513216
],
[
-2.651697,
51.513243
],
[
-2.651651,
51.513265
],
[
-2.651105,
51.513538
],
[
-2.649866,
51.514147
],
[
-2.648703,
51.514732
],
[
-2.648202,
51.514968
],
[
-2.64697,
51.515514
],
[
-2.646799,
51.515587
],
[
-2.652636,
51.512769
],
[
-2.652137,
51.51302
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jun 18, 2026 3:36 PM
- Record versioned
- Fri, Jun 19, 2026 3:35 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 southbound Jct 24 entry slip carriageway closure
Active Roadworks National HighwaysExpected to clear in 9 hours 3 minutes
M5 southbound Jct 24 entry slip carriageway closure
Lane 1 closure
Active Roadworks National HighwaysExpected to clear in 9 hours 3 minutes
lane 1 closure
M5 northbound Jct 21 to Jct 20 lane 1 and 2 closure (167/4 to 161/4)
Planned Roadworks National HighwaysStarts in 3 minutes 54 seconds
M5 northbound Jct 21 to Jct 20 lane 1 and 2 closure (167/4 to 161/4)
M5 Northbound Jct 26 to 25 lane 3 closure 213/5B to 212/9B
Planned Roadworks National HighwaysStarts in 3 minutes 54 seconds
M5 Northbound Jct 26 to 25 lane 3 closure 213/5B to 212/9B
M5 Northbound Jct 15 to 14 lane 1 closure 119/9b - 118/9b
Planned Roadworks National HighwaysStarts in 3 minutes 54 seconds
M5 Northbound Jct 15 to 14 lane 1 closure 119/9b - 118/9b
Lanes 1 and 2 closure southbound exit slip
Planned Roadworks National HighwaysStarts in 3 minutes 54 seconds
Lanes 1 and 2 closure southbound exit slip