Frankley services southbound exit slip road closure
ClearedFrankley services southbound exit slip road closure
- Start time
- Fri, May 8, 2026 7:00 PM
- Expected end
- Sat, May 9, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M5 – M5 Southbound At The Frankley Services Between J3 And J4 Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, May 1, 2026 1:37 PM
- Last updated
- Fri, May 8, 2026 6:46 PM
- Cleared
- Sat, May 9, 2026 5:00 AM
- Latest update: Frankley services southbound exit slip road closure
- Coordinates
- 52.430899, -2.017298
- Latitude span
- 52.430456 – 52.431564
- Longitude span
- -2.017422 – -2.017258
- Bounding box centre
- 52.431010, -2.017340
- Location descriptions
-
- M5 southbound at the Frankley services between J3 and J4 exit
- Feed validity status
- Planned
- Overall feed start
- Fri, May 8, 2026 7:00 PM
- Overall feed end
- Sat, May 9, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {18A7B7B9-B5EE-B20A-BD0D-8685EB269B46}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 92 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.431564 -2.017422 52.431499 -2.017297 52.431155 -2.017299 52.430988 -2.017295 52.430838 -2.017293 52.430772 -2.017289
Segment 2
5 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D0568229-BD18-15EB-5710-AEF3A74B938D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 35 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.430772 -2.017289 52.430743 -2.017287 52.430613 -2.017279 52.430492 -2.017264 52.430456 -2.017258
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -2.017422, 52.431564
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
],
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
]
]
]
}
View road section coordinates
[
[
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
],
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Fri, May 1, 2026 1:37 PM
- Record versioned
- Fri, May 8, 2026 6:46 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
Lane 2 and 3 closure northbound
Active Roadworks National HighwaysExpected to clear in 6 hours 40 minutes
Lane 2 and 3 closure northbound
Lane 1, 2 and 3 closure northbound
Active Roadworks National HighwaysExpected to clear in 6 hours 40 minutes
Lane 1, 2 and 3 closure northbound
Lane 2 and 3 closure northbound
Cleared Roadworks National HighwaysCleared 14 minutes 53 seconds ago
Lane 2 and 3 closure northbound
Lane 1, 2 and 3 closure northbound
Cleared Roadworks National HighwaysCleared 1 hour 49 minutes ago
Lane 1, 2 and 3 closure northbound
Lanes 1 and 2 closure northbound
Cleared Roadworks National HighwaysCleared 17 hours 19 minutes ago
Lanes 1 and 2 closure northbound
Lane 2 and 3 closure northbound
Cleared Roadworks National HighwaysCleared 17 hours 19 minutes ago
Lane 2 and 3 closure northbound