Eastbound lane closure 105/7 to 106/9
ClearedEastbound lane closure 105/7 to 106/9
- Start time
- Tue, Oct 6, 2026 7:00 PM
- Expected end
- Wed, Oct 7, 2026 5:00 AM
- Duration
- 7 hours 50 minutes 1 second
- Road
- A30 – A30 Eastbound Between A389 Near Bodmin (East) And A395
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 23, 2026 9:01 AM
- Last updated
- Wed, Oct 7, 2026 2:28 AM
- Cleared
- Wed, Oct 7, 2026 2:50 AM
- Latest update: Eastbound lane closure 105/7 to 106/9
- Coordinates
- 50.536007, -4.621950
- Latitude span
- 50.534021 – 50.537029
- Longitude span
- -4.629181 – -4.613095
- Bounding box centre
- 50.535525, -4.621138
- Location descriptions
-
- A30 eastbound between A389 near Bodmin (east) and A395
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 6, 2026 7:00 PM
- Overall feed end
- Wed, Oct 7, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {117C170F-2C39-47C2-8EFE-A941BBD76031}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 212 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.535477 -4.626096 50.535768 -4.625152 50.535904 -4.624711 50.535954 -4.62451 50.536073 -4.624026 50.536216 -4.62333
Segment 2
3 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {062C27A5-DDB9-434A-9EA5-C2F7B06800EB}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 43 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.536944 -4.613687 50.536988 -4.613336 50.537029 -4.613095
Segment 3
7 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {2C2941D8-30D2-4B96-9081-81258669A0D5}
- Linear Element Type
- B Carriageway
- From Distance
- 219 m
- To Distance
- 492 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.534021 -4.629181 50.534332 -4.628615 50.534547 -4.628246 50.53466 -4.628026 50.534962 -4.627394 50.535429 -4.626234 50.535477 -4.626096
Segment 4
11 coordinate pairs- Description
- A30 eastbound between A389 near Bodmin (east) and A395
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {C5BF365A-37E1-433B-AFB9-0275BF69A25D}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 689 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.536216 -4.62333 50.536351 -4.622461 50.536405 -4.622068 50.536451 -4.621619 50.536508 -4.621058 50.536536 -4.620622 50.536561 -4.620299 50.536759 -4.616316 50.536812 -4.615147 50.536876 -4.614304 50.536944 -4.613687
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -4.626096, 50.535477
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-4.626096,
50.535477
],
[
-4.625152,
50.535768
],
[
-4.624711,
50.535904
],
[
-4.62451,
50.535954
],
[
-4.624026,
50.536073
],
[
-4.62333,
50.536216
],
[
-4.613687,
50.536944
],
[
-4.613336,
50.536988
],
[
-4.613095,
50.537029
],
[
-4.629181,
50.534021
],
[
-4.628615,
50.534332
],
[
-4.628246,
50.534547
],
[
-4.628026,
50.53466
],
[
-4.627394,
50.534962
],
[
-4.626234,
50.535429
],
[
-4.626096,
50.535477
],
[
-4.62333,
50.536216
],
[
-4.622461,
50.536351
],
[
-4.622068,
50.536405
],
[
-4.621619,
50.536451
],
[
-4.621058,
50.536508
],
[
-4.620622,
50.536536
],
[
-4.620299,
50.536561
],
[
-4.616316,
50.536759
],
[
-4.615147,
50.536812
],
[
-4.614304,
50.536876
],
[
-4.613687,
50.536944
]
]
]
}
View road section coordinates
[
[
[
-4.626096,
50.535477
],
[
-4.625152,
50.535768
],
[
-4.624711,
50.535904
],
[
-4.62451,
50.535954
],
[
-4.624026,
50.536073
],
[
-4.62333,
50.536216
],
[
-4.613687,
50.536944
],
[
-4.613336,
50.536988
],
[
-4.613095,
50.537029
],
[
-4.629181,
50.534021
],
[
-4.628615,
50.534332
],
[
-4.628246,
50.534547
],
[
-4.628026,
50.53466
],
[
-4.627394,
50.534962
],
[
-4.626234,
50.535429
],
[
-4.626096,
50.535477
],
[
-4.62333,
50.536216
],
[
-4.622461,
50.536351
],
[
-4.622068,
50.536405
],
[
-4.621619,
50.536451
],
[
-4.621058,
50.536508
],
[
-4.620622,
50.536536
],
[
-4.620299,
50.536561
],
[
-4.616316,
50.536759
],
[
-4.615147,
50.536812
],
[
-4.614304,
50.536876
],
[
-4.613687,
50.536944
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Bodmin
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Sep 23, 2026 9:01 AM
- Record versioned
- Wed, Oct 7, 2026 2:28 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 eastbound Layby closure 115/3-115/5
Planned Roadworks National HighwaysExpected to clear in 5 months 1 week
A30 eastbound Layby closure 115/3-115/5
Lane 1 closure
Planned Roadworks National HighwaysStarts in 1 minute 14 seconds
lane 1 closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 58 minutes 43 seconds ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Eastbound Town Lane to Clockhouse Lane 2 closure
Cleared Roadworks National HighwaysCleared 2 hours 58 minutes ago
A30 Eastbound Town Lane to Clockhouse Lane 2 closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 58 minutes 45 seconds ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A38 eastbound Moorswater to Liskeard lane closure 20/0-21/2
Cleared Roadworks National HighwaysCleared 1 hour 58 minutes ago
A38 eastbound Moorswater to Liskeard lane closure 20/0-21/2