Eastbound Chellaton Exit
ClearedEastbound Chellaton Exit
- Start time
- Wed, Apr 29, 2026 7:00 PM
- Expected end
- Thu, Apr 30, 2026 4:00 AM
- Duration
- 9 hours
- Road
- A50 – A50 Eastbound Between A38 And A514
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Apr 27, 2026 12:12 PM
- Last updated
- Wed, Apr 29, 2026 11:40 PM
- Cleared
- Thu, Apr 30, 2026 4:00 AM
- Latest update: Eastbound Chellaton Exit
- Coordinates
- 52.861579, -1.443608
- Latitude span
- 52.861244 – 52.861943
- Longitude span
- -1.447151 – -1.440200
- Bounding box centre
- 52.861594, -1.443676
- Location descriptions
-
- A50 eastbound between A38 and A514
- A50 eastbound exit for A514
- Feed validity status
- Planned
- Overall feed start
- Wed, Apr 29, 2026 7:00 PM
- Overall feed end
- Thu, Apr 30, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- A50 eastbound between A38 and A514
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {158A4BAF-E1B6-4319-925B-BACD9D046684}
- Linear Element Type
- B Carriageway
- From Distance
- 25 m
- To Distance
- 43 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.861943 -1.447151 52.861923 -1.446987 52.861914 -1.446898
Segment 2
5 coordinate pairs- Description
- A50 eastbound exit for A514
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {0FC37C42-CD52-4AA7-93DD-D58E627B7E36}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 147 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.861446 -1.442365 52.861341 -1.441558 52.861265 -1.440802 52.861245 -1.440416 52.861244 -1.4402
Segment 3
7 coordinate pairs- Description
- A50 eastbound exit for A514
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {CD821E39-B78E-4761-AB73-1BF6868E1B3F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 309 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.861914 -1.446898 52.861706 -1.444673 52.861678 -1.44445 52.86164 -1.444005 52.861527 -1.442982 52.861446 -1.442365 52.861446 -1.442365
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -1.447151, 52.861943
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.447151,
52.861943
],
[
-1.446987,
52.861923
],
[
-1.446898,
52.861914
],
[
-1.442365,
52.861446
],
[
-1.441558,
52.861341
],
[
-1.440802,
52.861265
],
[
-1.440416,
52.861245
],
[
-1.4402,
52.861244
],
[
-1.446898,
52.861914
],
[
-1.444673,
52.861706
],
[
-1.44445,
52.861678
],
[
-1.444005,
52.86164
],
[
-1.442982,
52.861527
],
[
-1.442365,
52.861446
],
[
-1.442365,
52.861446
]
]
]
}
View road section coordinates
[
[
[
-1.447151,
52.861943
],
[
-1.446987,
52.861923
],
[
-1.446898,
52.861914
],
[
-1.442365,
52.861446
],
[
-1.441558,
52.861341
],
[
-1.440802,
52.861265
],
[
-1.440416,
52.861245
],
[
-1.4402,
52.861244
],
[
-1.446898,
52.861914
],
[
-1.444673,
52.861706
],
[
-1.44445,
52.861678
],
[
-1.444005,
52.86164
],
[
-1.442982,
52.861527
],
[
-1.442365,
52.861446
],
[
-1.442365,
52.861446
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Mon, Apr 27, 2026 12:12 PM
- Record versioned
- Wed, Apr 29, 2026 11:40 PM
- Coordinate source
- Geometry
Driving on the A50? See every live closure, roadwork and planned restriction on this road.
A50 live closuresRelated incidents
Lane closure switching eastbound
Cleared Roadworks National HighwaysCleared 1 day 23 hours ago
Lane closure switching eastbound
Lane 2,3,4 closure northbound
Cleared Roadworks National HighwaysCleared 1 day 17 hours ago
Lane 2,3,4 closure northbound
Mobile Lane closures Eastbound and Westbound
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
Mobile Lane closures Eastbound and Westbound
Eastbound Lane Closure
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
Eastbound Lane Closure
A50 westbound Blurton West entry slip road closure
Cleared Roadworks National HighwaysCleared 2 days 14 hours ago
A50 westbound Blurton West entry slip road closure
A50 eastbound Meir Tunnel carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 19 minutes ago
A50 eastbound Meir Tunnel carriageway closure