Dedicated right turn lane and gap closure northbound
ClearedDedicated right turn lane and gap closure northbound
- Start time
- Tue, Sep 29, 2026 8:00 PM
- Expected end
- Wed, Sep 30, 2026 5:00 AM
- Duration
- 1 second
- Road
- A43 – A43 Northbound Between A5 And M1
- Category
- Construction Work
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 16, 2026 1:04 PM
- Last updated
- Tue, Sep 29, 2026 7:28 PM
- Cleared
- Tue, Sep 29, 2026 8:00 PM
- Latest update: Dedicated right turn lane and gap closure northbound
- Coordinates
- 52.164684, -0.961904
- Latitude span
- 52.163513 – 52.165218
- Longitude span
- -0.962572 – -0.961598
- Bounding box centre
- 52.164366, -0.962085
- Location descriptions
-
- A43 northbound between A5 and M1
- Feed validity status
- Planned
- Overall feed start
- Tue, Sep 29, 2026 8:00 PM
- Overall feed end
- Wed, Sep 30, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A43 northbound between A5 and M1
- Carriageway
- Dual Carriageway
- Lane Usage
- Or1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Opposite
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A43
- Linear Element Model
- The Network Model
- Linear Element Id
- {1B273C89-41FD-4BE6-8767-34D2E83B7CDB}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 7 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.165157 -0.96163 52.165218 -0.961598
Segment 2
4 coordinate pairs- Description
- A43 northbound between A5 and M1
- Carriageway
- Dual Carriageway
- Lane Usage
- Or1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Opposite
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A43
- Linear Element Model
- The Network Model
- Linear Element Id
- {C4659F2F-6472-4DAE-97D6-E54D6BF5B0D5}
- Linear Element Type
- A Carriageway
- From Distance
- 531 m
- To Distance
- 725 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.163513 -0.962572 52.164208 -0.962179 52.164853 -0.961813 52.165157 -0.96163
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.961630, 52.165157
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.96163,
52.165157
],
[
-0.961598,
52.165218
],
[
-0.962572,
52.163513
],
[
-0.962179,
52.164208
],
[
-0.961813,
52.164853
],
[
-0.96163,
52.165157
]
]
]
}
View road section coordinates
[
[
[
-0.96163,
52.165157
],
[
-0.961598,
52.165218
],
[
-0.962572,
52.163513
],
[
-0.962179,
52.164208
],
[
-0.961813,
52.164853
],
[
-0.96163,
52.165157
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Sep 16, 2026 1:04 PM
- Record versioned
- Tue, Sep 29, 2026 7:28 PM
- Coordinate source
- Geometry
Driving on the A43? See every live closure, roadwork and planned restriction on this road.
A43 live closuresRelated incidents
M6 to M1 southbound link road closure
Planned Roadworks National HighwaysStarts in 4 hours 2 minutes
M6 to M1 southbound link road closure
A14 westbound Jct 2 exit slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 2 minutes
A14 westbound Jct 2 exit slip road closure
A14 westbound Jct 2 entry slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 2 minutes
A14 westbound Jct 2 entry slip road closure
Lane closure northbound
Planned Roadworks National HighwaysStarts in 4 hours 2 minutes
Lane closure northbound
Lane closure northbound including roundabout
Cleared Roadworks National HighwaysCleared 14 hours 42 minutes ago
Lane closure northbound including roundabout
Lane closure northbound including roundabout
Cleared Roadworks National HighwaysCleared 1 day 14 hours ago
Lane closure northbound including roundabout