A64 eastbound Pickering Interchange exit slip road closure
ClearedA64 eastbound Pickering Interchange exit slip road closure
- Start time
- Wed, Sep 23, 2026 7:00 PM
- Expected end
- Thu, Sep 24, 2026 5:00 AM
- Duration
- 50 minutes 1 second
- Road
- A64 – A64 Eastbound Exit For A169
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 23, 2026 1:51 AM
- Last updated
- Wed, Sep 23, 2026 7:18 PM
- Cleared
- Wed, Sep 23, 2026 7:50 PM
- Latest update: A64 eastbound Pickering Interchange exit slip road closure
- Coordinates
- 54.150025, -0.778064
- Latitude span
- 54.149608 – 54.150472
- Longitude span
- -0.780456 – -0.776140
- Bounding box centre
- 54.150040, -0.778298
- Location descriptions
-
- A64 eastbound exit for A169
- Roundabout at A64/ A169
- Feed validity status
- Planned
- Overall feed start
- Wed, Sep 23, 2026 7:00 PM
- Overall feed end
- Thu, Sep 24, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- A64 eastbound exit for A169
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A64
- Linear Element Model
- The Network Model
- Linear Element Id
- {CA95B2E2-42EC-4DB1-A810-E40F208D467D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 289 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.149608 -0.780456 54.149609 -0.78045 54.149612 -0.780436 54.149712 -0.779877 54.149755 -0.779542 54.149846 -0.778789 54.149963 -0.777852 54.150005 -0.777606 54.150074 -0.777328 54.150118 -0.777189 54.150312 -0.776608 54.150413 -0.77627
Segment 2
3 coordinate pairs- Description
- Roundabout at A64/ A169
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A169
- Linear Element Model
- The Network Model
- Linear Element Id
- {08689449-8F5F-4AF0-B2E7-0E5E55BEF424}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 10 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.150413 -0.77627 54.150467 -0.776153 54.150472 -0.77614
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -0.780456, 54.149608
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.780456,
54.149608
],
[
-0.78045,
54.149609
],
[
-0.780436,
54.149612
],
[
-0.779877,
54.149712
],
[
-0.779542,
54.149755
],
[
-0.778789,
54.149846
],
[
-0.777852,
54.149963
],
[
-0.777606,
54.150005
],
[
-0.777328,
54.150074
],
[
-0.777189,
54.150118
],
[
-0.776608,
54.150312
],
[
-0.77627,
54.150413
],
[
-0.77627,
54.150413
],
[
-0.776153,
54.150467
],
[
-0.77614,
54.150472
]
]
]
}
View road section coordinates
[
[
[
-0.780456,
54.149608
],
[
-0.78045,
54.149609
],
[
-0.780436,
54.149612
],
[
-0.779877,
54.149712
],
[
-0.779542,
54.149755
],
[
-0.778789,
54.149846
],
[
-0.777852,
54.149963
],
[
-0.777606,
54.150005
],
[
-0.777328,
54.150074
],
[
-0.777189,
54.150118
],
[
-0.776608,
54.150312
],
[
-0.77627,
54.150413
],
[
-0.77627,
54.150413
],
[
-0.776153,
54.150467
],
[
-0.77614,
54.150472
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Sep 23, 2026 1:51 AM
- Record versioned
- Wed, Sep 23, 2026 7:18 PM
- Coordinate source
- Geometry
Driving on the A64? See every live closure, roadwork and planned restriction on this road.
A64 live closuresRelated incidents
A64 eastbound Tadcaster to Bilbrough lane 1 closure (8/0 to 9/7)
Planned Roadworks National HighwaysStarts in 16 hours 54 minutes
A64 eastbound Tadcaster to Bilbrough lane 1 closure (8/0 to 9/7)
A64 eastbound and westbound Hopgrove to Towthorpe, carriageway closure
Planned Roadworks National HighwaysStarts in 15 hours 54 minutes
A64 eastbound and westbound Hopgrove to Towthorpe, carriageway closure
A64 eastbound Tadcaster to Bilbrough lane 1 closure (7/3 14/7)
Cleared Roadworks National HighwaysCleared 3 hours 5 minutes ago
A64 eastbound Tadcaster to Bilbrough lane 1 closure (7/3 14/7)
A64 eastbound Tadcaster to Bilbrough lane 1 closure (8/0 to 9/7)
Cleared Roadworks National HighwaysCleared 3 hours 10 minutes ago
A64 eastbound Tadcaster to Bilbrough lane 1 closure (8/0 to 9/7)
A64 westbound Fulford exit slip Lane 1 closure
Cleared Roadworks National HighwaysCleared 8 hours 5 minutes ago
A64 westbound Fulford exit slip Lane 1 closure
A64 eastbound Whitewell duals Lane 2 closure (42/5 45/5)
Cleared Roadworks National HighwaysCleared 22 hours 5 minutes ago
A64 eastbound Whitewell duals Lane 2 closure (42/5 45/5)