A63 eastbound North cave entry slip road closure
PlannedA63 eastbound North cave entry slip road closure
- Start time
- Mon, Nov 2, 2026 8:00 PM
- Expected end
- Tue, Nov 3, 2026 6:00 AM
- Duration
- 10 hours
- Road
- A63 – A63 Eastbound Access From M62/B1230
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Singlecarriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Aug 18, 2026 10:41 AM
- Last updated
- Mon, Nov 2, 2026 5:54 AM
- Cleared
- Tue, Nov 3, 2026 6:00 AM
- Latest update: A63 eastbound North cave entry slip road closure
- Coordinates
- 53.770837, -0.673861
- Latitude span
- 53.770221 – 53.771234
- Longitude span
- -0.676129 – -0.670536
- Bounding box centre
- 53.770728, -0.673333
- Location descriptions
-
- A63 eastbound access from M62/B1230
- connector at M62 J38/A63
- Feed validity status
- Planned
- Overall feed start
- Mon, Nov 2, 2026 8:00 PM
- Overall feed end
- Tue, Nov 3, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A63 eastbound access from M62/B1230
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A63
- Linear Element Model
- The Network Model
- Linear Element Id
- {83193AF0-FFA8-4B68-A198-ED92A149A023}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 346 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.771136 -0.675563 53.770857 -0.673903 53.770722 -0.673148 53.77055 -0.672183 53.770221 -0.670536
Segment 2
2 coordinate pairs- Description
- connector at M62 J38/A63
- Carriageway
- Single Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A63
- Linear Element Model
- The Network Model
- Linear Element Id
- {6032BBC9-BA44-4CDE-A070-87D6D3F4A40B}
- Linear Element Type
- Other
- From Distance
- 6 m
- To Distance
- 45 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.771234 -0.676129 53.771136 -0.675563
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -0.675563, 53.771136
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.675563,
53.771136
],
[
-0.673903,
53.770857
],
[
-0.673148,
53.770722
],
[
-0.672183,
53.77055
],
[
-0.670536,
53.770221
],
[
-0.676129,
53.771234
],
[
-0.675563,
53.771136
]
]
]
}
View road section coordinates
[
[
[
-0.675563,
53.771136
],
[
-0.673903,
53.770857
],
[
-0.673148,
53.770722
],
[
-0.672183,
53.77055
],
[
-0.670536,
53.770221
],
[
-0.676129,
53.771234
],
[
-0.675563,
53.771136
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Tue, Aug 18, 2026 10:41 AM
- Record versioned
- Mon, Nov 2, 2026 5:54 AM
- Coordinate source
- Geometry
Driving on the A63? See every live closure, roadwork and planned restriction on this road.
A63 live closuresRelated incidents
A63 eastbound Daltry Street entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 48 minutes
A63 eastbound Daltry Street entry slip road closure
M62 eastbound Jct 38 exit slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 48 minutes
M62 eastbound Jct 38 exit slip road closure
A63 westbound Daltry Street exit slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 48 minutes
A63 westbound Daltry Street exit slip road closure
A63 eastbound Brighton St to Daltry St lane 2 closure
Planned Roadworks National HighwaysStarts in 13 hours 18 minutes
A63 eastbound Brighton St to Daltry St lane 2 closure
A63 eastbound Western Interchange to Priory way Lane 1 closure (192/9 193/8)
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A63 eastbound Western Interchange to Priory way Lane 1 closure (192/9 193/8)
A63 eastbound Western Interchange entry slip road closure
Cleared Roadworks National HighwaysCleared 1 day 4 hours ago
A63 eastbound Western Interchange entry slip road closure