A595 Eastbound and Westbound Tolbar Roundabout to Howgate Rbt Lane 2 closure
PlannedA595 Eastbound and Westbound Tolbar Roundabout to Howgate Rbt Lane 2 closure
- Start time
- Sun, Oct 18, 2026 6:00 AM
- Expected end
- Mon, Oct 19, 2026 4:00 AM
- Duration
- 22 hours
- Road
- A595 – A595 Southbound Between A597 And B5306
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 15, 2026 10:49 AM
- Last updated
- Sun, Oct 18, 2026 6:31 AM
- Cleared
- Mon, Oct 19, 2026 4:00 AM
- Latest update: A595 Eastbound and Westbound Tolbar Roundabout to Howgate Rbt Lane 2 closure
- Coordinates
- 54.577583, -3.563937
- Latitude span
- 54.575435 – 54.580372
- Longitude span
- -3.567834 – -3.557653
- Bounding box centre
- 54.577904, -3.562744
- Location descriptions
-
- A595 southbound between A597 and B5306
- Feed validity status
- Planned
- Overall feed start
- Sun, Oct 18, 2026 6:00 AM
- Overall feed end
- Mon, Oct 19, 2026 4:00 AM
- Feed window length
- 22 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A595 southbound between A597 and B5306
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A595
- Linear Element Model
- The Network Model
- Linear Element Id
- {F8DE20DF-11A2-420C-8735-930BE6A79152}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 252 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.577148 -3.565311 54.576963 -3.565634 54.576486 -3.566404 54.575779 -3.567482 54.575546 -3.567785 54.575483 -3.567834 54.575435 -3.567832
Segment 2
9 coordinate pairs- Description
- A595 southbound between A597 and B5306
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A595
- Linear Element Model
- The Network Model
- Linear Element Id
- {0EE51918-4B21-4AD0-9CF0-DF95AE311F67}
- Linear Element Type
- B Carriageway
- From Distance
- 833 m
- To Distance
- 1,446 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.580372 -3.557653 54.57985 -3.558671 54.579519 -3.559477 54.57914 -3.560492 54.578701 -3.561785 54.57837 -3.562755 54.577917 -3.563818 54.577467 -3.564753 54.577148 -3.565311
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -3.565311, 54.577148
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-3.565311,
54.577148
],
[
-3.565634,
54.576963
],
[
-3.566404,
54.576486
],
[
-3.567482,
54.575779
],
[
-3.567785,
54.575546
],
[
-3.567834,
54.575483
],
[
-3.567832,
54.575435
],
[
-3.557653,
54.580372
],
[
-3.558671,
54.57985
],
[
-3.559477,
54.579519
],
[
-3.560492,
54.57914
],
[
-3.561785,
54.578701
],
[
-3.562755,
54.57837
],
[
-3.563818,
54.577917
],
[
-3.564753,
54.577467
],
[
-3.565311,
54.577148
]
]
]
}
View road section coordinates
[
[
[
-3.565311,
54.577148
],
[
-3.565634,
54.576963
],
[
-3.566404,
54.576486
],
[
-3.567482,
54.575779
],
[
-3.567785,
54.575546
],
[
-3.567834,
54.575483
],
[
-3.567832,
54.575435
],
[
-3.557653,
54.580372
],
[
-3.558671,
54.57985
],
[
-3.559477,
54.579519
],
[
-3.560492,
54.57914
],
[
-3.561785,
54.578701
],
[
-3.562755,
54.57837
],
[
-3.563818,
54.577917
],
[
-3.564753,
54.577467
],
[
-3.565311,
54.577148
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Oct 15, 2026 10:49 AM
- Record versioned
- Sun, Oct 18, 2026 6:31 AM
- Coordinate source
- Geometry
Driving on the A595? See every live closure, roadwork and planned restriction on this road.
A595 live closuresRelated incidents
A595 Clockwise Blackbeck Rbt Outer ring management and 4 way traffic signals
Planned Roadworks National HighwaysStarts in 11 hours 21 minutes
A595 Clockwise Blackbeck Rbt Outer ring management and 4 way traffic signals
A595 Clockwise Blackbeck Rbt Outer ring management and 4 way traffic signals
Cleared Roadworks National HighwaysCleared 6 hours 38 minutes ago
A595 Clockwise Blackbeck Rbt Outer ring management and 4 way traffic signals
A595 Eastbound and Westbound clints rbt to hensingham rbt carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 4 hours ago
A595 Eastbound and Westbound clints rbt to hensingham rbt carriageway closure
A595 Eastbound and Westbound clints rbt to hensingham rbt carriageway closure
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
A595 Eastbound and Westbound clints rbt to hensingham rbt carriageway closure
A595 Clockwise Blackbeck Rbt Outer ring management and 4 way traffic signals
Cleared Roadworks National HighwaysCleared 1 day 6 hours ago
A595 Clockwise Blackbeck Rbt Outer ring management and 4 way traffic signals
A595 Clockwise Blackbeck Rbt Outer ring management
Cleared Roadworks National HighwaysCleared 2 days 16 hours ago
A595 Clockwise Blackbeck Rbt Outer ring management