A55 Eastbound lanes 2 closure (MP 132/3 to 132/8)
ClearedA55 Eastbound lanes 2 closure (MP 132/3 to 132/8)
- Start time
- Sat, Apr 11, 2026 8:00 PM
- Expected end
- Sun, Apr 12, 2026 4:00 AM
- Duration
- 8 hours
- Road
- A55 – A55 Eastbound Within The A483 Junction
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Mar 27, 2026 9:10 AM
- Last updated
- Sat, Apr 11, 2026 11:52 PM
- Cleared
- Sun, Apr 12, 2026 4:00 AM
- Latest update: A55 Eastbound lanes 2 closure (MP 132/3 to 132/8)
- Coordinates
- 53.156719, -2.910306
- Latitude span
- 53.156369 – 53.157107
- Longitude span
- -2.914005 – -2.906443
- Bounding box centre
- 53.156738, -2.910224
- Location descriptions
-
- A55 eastbound within the A483 junction
- Feed validity status
- Planned
- Overall feed start
- Sat, Apr 11, 2026 8:00 PM
- Overall feed end
- Sun, Apr 12, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
11 coordinate pairs- Description
- A55 eastbound within the A483 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {D198925D-5014-4619-AEF2-1478E42DC1B4}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 421 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.156494 -2.912661 53.156534 -2.912183 53.156573 -2.91178 53.15668 -2.910616 53.156768 -2.909735 53.156827 -2.909123 53.156856 -2.90881 53.156886 -2.908377 53.156992 -2.907512 53.157098 -2.906572 53.157107 -2.906443
Segment 2
3 coordinate pairs- Description
- A55 eastbound within the A483 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {83E6B9C4-86DD-4A73-8B9E-9E395F215D38}
- Linear Element Type
- B Carriageway
- From Distance
- 30 m
- To Distance
- 121 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.156369 -2.914005 53.156386 -2.91381 53.156494 -2.912661
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -2.912661, 53.156494
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.912661,
53.156494
],
[
-2.912183,
53.156534
],
[
-2.91178,
53.156573
],
[
-2.910616,
53.15668
],
[
-2.909735,
53.156768
],
[
-2.909123,
53.156827
],
[
-2.90881,
53.156856
],
[
-2.908377,
53.156886
],
[
-2.907512,
53.156992
],
[
-2.906572,
53.157098
],
[
-2.906443,
53.157107
],
[
-2.914005,
53.156369
],
[
-2.91381,
53.156386
],
[
-2.912661,
53.156494
]
]
]
}
View road section coordinates
[
[
[
-2.912661,
53.156494
],
[
-2.912183,
53.156534
],
[
-2.91178,
53.156573
],
[
-2.910616,
53.15668
],
[
-2.909735,
53.156768
],
[
-2.909123,
53.156827
],
[
-2.90881,
53.156856
],
[
-2.908377,
53.156886
],
[
-2.907512,
53.156992
],
[
-2.906572,
53.157098
],
[
-2.906443,
53.157107
],
[
-2.914005,
53.156369
],
[
-2.91381,
53.156386
],
[
-2.912661,
53.156494
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Mar 27, 2026 9:10 AM
- Record versioned
- Sat, Apr 11, 2026 11:52 PM
- Coordinate source
- Geometry
Driving on the A55? See every live closure, roadwork and planned restriction on this road.
A55 live closuresRelated incidents
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 2 weeks 2 days
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46
A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)
Cleared Roadworks National HighwaysCleared 1 hour 37 minutes ago
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)
Cleared Roadworks National HighwaysCleared 1 day 5 hours ago
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)
Cleared Roadworks National HighwaysCleared 1 day 47 minutes ago
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)