A55 Eastbound Jct 38 exit slip road lane 1 leading to lane 1 and 2 closure
ClearedA55 Eastbound Jct 38 exit slip road lane 1 leading to lane 1 and 2 closure
- Start time
- Sat, Nov 15, 2025 8:00 PM
- Expected end
- Sun, Nov 16, 2025 6:00 AM
- Duration
- 10 hours
- Road
- A55 – A55 Eastbound Exit For A483
- Category
- Authority Operation
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Nov 14, 2025 4:53 AM
- Last updated
- Sat, Nov 15, 2025 11:52 PM
- Cleared
- Sun, Nov 16, 2025 6:00 AM
- Latest update: A55 Eastbound Jct 38 exit slip road lane 1 leading to lane 1 and 2 closure
- Coordinates
- 53.156316, -2.917355
- Latitude span
- 53.156089 – 53.156627
- Longitude span
- -2.921748 – -2.914516
- Bounding box centre
- 53.156358, -2.918132
- Location descriptions
-
- A55 eastbound exit for A483
- A55 eastbound between Welsh border and A483
- Feed validity status
- Planned
- Overall feed start
- Sat, Nov 15, 2025 8:00 PM
- Overall feed end
- Sun, Nov 16, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
13 coordinate pairs- Description
- A55 eastbound exit for A483
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {D5B6C1FB-5961-4D55-A5DA-054FF1A505A5}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 323 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.156107 -2.919257 53.156165 -2.918835 53.156196 -2.918383 53.156233 -2.917803 53.156263 -2.917424 53.156298 -2.916993 53.156328 -2.916692 53.156383 -2.916152 53.156459 -2.915491 53.156525 -2.915006 53.156566 -2.914776 53.156604 -2.914607 53.156627 -2.914516
Segment 2
3 coordinate pairs- Description
- A55 eastbound between Welsh border and A483
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {B93E3A55-0E37-4DE2-8067-2604A77CFC26}
- Linear Element Type
- B Carriageway
- From Distance
- 477 m
- To Distance
- 644 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.15611 -2.921748 53.156089 -2.920738 53.156107 -2.919257
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -2.919257, 53.156107
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.919257,
53.156107
],
[
-2.918835,
53.156165
],
[
-2.918383,
53.156196
],
[
-2.917803,
53.156233
],
[
-2.917424,
53.156263
],
[
-2.916993,
53.156298
],
[
-2.916692,
53.156328
],
[
-2.916152,
53.156383
],
[
-2.915491,
53.156459
],
[
-2.915006,
53.156525
],
[
-2.914776,
53.156566
],
[
-2.914607,
53.156604
],
[
-2.914516,
53.156627
],
[
-2.921748,
53.15611
],
[
-2.920738,
53.156089
],
[
-2.919257,
53.156107
]
]
]
}
View road section coordinates
[
[
[
-2.919257,
53.156107
],
[
-2.918835,
53.156165
],
[
-2.918383,
53.156196
],
[
-2.917803,
53.156233
],
[
-2.917424,
53.156263
],
[
-2.916993,
53.156298
],
[
-2.916692,
53.156328
],
[
-2.916152,
53.156383
],
[
-2.915491,
53.156459
],
[
-2.915006,
53.156525
],
[
-2.914776,
53.156566
],
[
-2.914607,
53.156604
],
[
-2.914516,
53.156627
],
[
-2.921748,
53.15611
],
[
-2.920738,
53.156089
],
[
-2.919257,
53.156107
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Fri, Nov 14, 2025 4:53 AM
- Record versioned
- Sat, Nov 15, 2025 11:52 PM
- Coordinate source
- Geometry
Driving on the A55? See every live closure, roadwork and planned restriction on this road.
A55 live closuresRelated incidents
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
Active Roadworks National HighwaysExpected to clear in 2 weeks 2 days
M56 Eastbound hardshoulder closure (MP 55/0 to 54/6)
A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46
A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)
Cleared Roadworks National HighwaysCleared 2 hours 1 minute ago
M56 eastbound jct 14 - 12 lanes 1 and 2 closure (MP 47/5 - 43/9)
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)
Cleared Roadworks National HighwaysCleared 1 day 5 hours ago
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)
Cleared Roadworks National HighwaysCleared 1 day 1 hour ago
M56 Eastbound lane 2 closure (MP 57/0 to 52/9)