A47 eastbound Approach to Jct 20 - lane 1 closure and ring management
ClearedA47 eastbound Approach to Jct 20 - lane 1 closure and ring management
- Start time
- Tue, Mar 3, 2026 8:00 PM
- Expected end
- Wed, Mar 4, 2026 6:00 AM
- Duration
- 10 hours
- Road
- A47 – Roundabout At A47/A15 Near Peterborough (East)
- Category
- Authority Operation
- Direction
- Clockwise
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Mar 2, 2026 10:02 AM
- Last updated
- Tue, Mar 3, 2026 3:58 PM
- Cleared
- Wed, Mar 4, 2026 6:00 AM
- Latest update: A47 eastbound Approach to Jct 20 - lane 1 closure and ring management
- Coordinates
- 52.604992, -0.230298
- Latitude span
- 52.604858 – 52.605074
- Longitude span
- -0.230317 – -0.230282
- Bounding box centre
- 52.604966, -0.230300
- Location descriptions
-
- roundabout at A47/A15 near Peterborough (east)
- Feed validity status
- Planned
- Overall feed start
- Tue, Mar 3, 2026 8:00 PM
- Overall feed end
- Wed, Mar 4, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- roundabout at A47/A15 near Peterborough (east)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A47
- Linear Element Model
- The Network Model
- Linear Element Id
- {C0F23D4A-1699-4594-B937-AEE3D58C866D}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 7 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.605011 -0.2303 52.605047 -0.230298 52.605074 -0.230282
Segment 2
3 coordinate pairs- Description
- roundabout at A47/A15 near Peterborough (east)
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A47
- Linear Element Model
- The Network Model
- Linear Element Id
- {CA81F724-79AC-43D8-8AB2-13D569687549}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 17 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.604858 -0.230291 52.604948 -0.230317 52.605011 -0.2303
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.230300, 52.605011
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.2303,
52.605011
],
[
-0.230298,
52.605047
],
[
-0.230282,
52.605074
],
[
-0.230291,
52.604858
],
[
-0.230317,
52.604948
],
[
-0.2303,
52.605011
]
]
]
}
View road section coordinates
[
[
[
-0.2303,
52.605011
],
[
-0.230298,
52.605047
],
[
-0.230282,
52.605074
],
[
-0.230291,
52.604858
],
[
-0.230317,
52.604948
],
[
-0.2303,
52.605011
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Peterborough
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Mar 2, 2026 10:02 AM
- Record versioned
- Tue, Mar 3, 2026 3:58 PM
- Coordinate source
- Geometry
Driving on the A47? See every live closure, roadwork and planned restriction on this road.
A47 live closuresRelated incidents
A47 eastbound B1108 to A140 contraflow
Planned Roadworks National HighwaysExpected to clear in 1 year 5 months
A47 eastbound B1108 to A140 contraflow
A47 eastbound approaching Wansford roundabout east lane closure
Planned Roadworks National HighwaysStarts in 10 hours 57 minutes
A47 eastbound approaching Wansford roundabout east lane closure
A47 eastbound Jct 19 between the exit and entry slips carriageway closure
Planned Roadworks National HighwaysStarts in 10 hours 57 minutes
A47 eastbound Jct 19 between the exit and entry slips carriageway closure
A47 both directions A141 Guyhirn roundabout to B198 Redmoor roundabout carriageway closure
Planned Roadworks National HighwaysStarts in 10 hours 57 minutes
A47 both directions A141 Guyhirn roundabout to B198 Redmoor roundabout carriageway closure
A47 westbound approaching Wansford roundabout east lane closure
Planned Roadworks National HighwaysStarts in 10 hours 57 minutes
A47 westbound approaching Wansford roundabout east lane closure
A47 both directions Ipswich Road to Fox Lane mobile lane closures
Planned Roadworks National HighwaysStarts in 10 hours 57 minutes
A47 both directions Ipswich Road to Fox Lane mobile lane closures