A47 both directions Constitution Hill to Pullover Roundabout lane 1 closure
ClearedA47 both directions Constitution Hill to Pullover Roundabout lane 1 closure
- Start time
- Fri, Nov 28, 2025 8:00 PM
- Expected end
- Sat, Nov 29, 2025 6:00 AM
- Duration
- 10 hours
- Road
- A47 – A47 Eastbound Between A10/A149 And B1153
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Singlecarriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Nov 18, 2025 8:02 AM
- Last updated
- Sat, Nov 29, 2025 2:00 AM
- Cleared
- Sat, Nov 29, 2025 6:00 AM
- Latest update: A47 both directions Constitution Hill to Pullover Roundabout lane 1 closure
- Coordinates
- 52.735001, 0.420959
- Latitude span
- 52.734840 – 52.735257
- Longitude span
- 0.420539 – 0.421204
- Bounding box centre
- 52.735049, 0.420872
- Location descriptions
-
- A47 eastbound between A10/A149 and B1153
- Feed validity status
- Planned
- Overall feed start
- Fri, Nov 28, 2025 8:00 PM
- Overall feed end
- Sat, Nov 29, 2025 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A47 eastbound between A10/A149 and B1153
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Both
- Height Grade
- Start1 End1
- Linear Element Road
- A47
- Linear Element Model
- The Network Model
- Linear Element Id
- {C63AE788-776C-47C3-ADF8-6A1BA5B77268}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.734954 0.421046 52.73484 0.421204
Segment 2
2 coordinate pairs- Description
- A47 eastbound between A10/A149 and B1153
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A47
- Linear Element Model
- The Network Model
- Linear Element Id
- {A550BF08-E95D-46F4-B544-44040E33868E}
- Linear Element Type
- A Carriageway
- From Distance
- 12 m
- To Distance
- 60 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.735257 0.420539 52.734954 0.421046
- Geometry type
- MultiLineString
- Geometry points
- 4
- First coordinate pair
- 0.421046, 52.734954
- Road section segments
- 1
- Road section points
- 4
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.421046,
52.734954
],
[
0.421204,
52.73484
],
[
0.420539,
52.735257
],
[
0.421046,
52.734954
]
]
]
}
View road section coordinates
[
[
[
0.421046,
52.734954
],
[
0.421204,
52.73484
],
[
0.420539,
52.735257
],
[
0.421046,
52.734954
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Nov 18, 2025 8:02 AM
- Record versioned
- Sat, Nov 29, 2025 2:00 AM
- Coordinate source
- Geometry
Driving on the A47? See every live closure, roadwork and planned restriction on this road.
A47 live closuresRelated incidents
A47 eastbound B1108 to A140 contraflow
Planned Roadworks National HighwaysExpected to clear in 1 year 5 months
A47 eastbound B1108 to A140 contraflow
A47 both directions A141 Guyhirn roundabout to B198 Redmoor roundabout carriageway closure
Planned Roadworks National HighwaysStarts in 2 hours 53 minutes
A47 both directions A141 Guyhirn roundabout to B198 Redmoor roundabout carriageway closure
A47 both directions A141 Guyhirn roundabout to B198 Redmoor roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 16 hours 6 minutes ago
A47 both directions A141 Guyhirn roundabout to B198 Redmoor roundabout carriageway closure
A47 eastbound Longwater Interchange to Watton Road Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 21 hours 6 minutes ago
A47 eastbound Longwater Interchange to Watton Road Interchange carriageway closure
A47 eastbound A1122 to Lynn Road lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 11 hours ago
A47 eastbound A1122 to Lynn Road lane 1 closure
A47 clockwise Hardwick Roundabout inner and/or outer ring management
Cleared Roadworks National HighwaysCleared 1 day 11 hours ago
A47 clockwise Hardwick Roundabout inner and/or outer ring management