A46 northbound Ratcliffe Road entry slip road closure
ClearedA46 northbound Ratcliffe Road entry slip road closure
- Start time
- Fri, Jul 10, 2026 7:27 PM
- Expected end
- Sat, Jul 11, 2026 5:00 AM
- Duration
- 3 hours 23 minutes 1 second
- Category
- Road Maintenance
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 10, 2026 7:28 PM
- Last updated
- Fri, Jul 10, 2026 10:15 PM
- Cleared
- Fri, Jul 10, 2026 10:50 PM
- Latest update: A46 northbound Ratcliffe Road entry slip road closure
- Feed validity status
- Active
- Overall feed start
- Fri, Jul 10, 2026 7:27 PM
- Overall feed end
- Sat, Jul 11, 2026 5:00 AM
- Feed window length
- 9 hours 33 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Fri, Jul 10, 2026 7:28 PM
- Record versioned
- Fri, Jul 10, 2026 10:15 PM
Related incidents
Lane 1, 2 and 3 closure southbound
Active Roadworks National HighwaysExpected to clear in 42 minutes 45 seconds
Lane 1, 2 and 3 closure southbound
A303 eastbound lane 2 closure (92/0 to 89/5)
Planned Roadworks National HighwaysExpected to clear in 42 minutes 45 seconds
A303 eastbound lane 2 closure (92/0 to 89/5)
M40 lane closures southbound (up to 4.05k)
Planned Roadworks National HighwaysExpected to clear in 42 minutes 45 seconds
M40 lane closures southbound (up to 4.05k)
M60 Clockwise Jct 7 exit slip to CD link road closure
Planned Roadworks National HighwaysExpected to clear in 42 minutes 45 seconds
M60 Clockwise Jct 7 exit slip to CD link road closure
M6 Southbound Scotland Border to Jct 44 Lane 1 and 2 closure (504/8B to 494/8B)
Planned Roadworks National HighwaysExpected to clear in 42 minutes 45 seconds
M6 Southbound Scotland Border to Jct 44 Lane 1 and 2 closure (504/8B to 494/8B)
Lane closure eastbound including roundabout
Planned Roadworks National HighwaysExpected to clear in 42 minutes 45 seconds
Lane closure eastbound including roundabout