A45 eastbound Stonebridge to River Bridge boundary carraigeway closure

Cleared

A45 eastbound Stonebridge to River Bridge boundary carraigeway closure

Start time
Tue, May 26, 2026 8:00 PM
Expected end
Wed, May 27, 2026 5:00 AM
Duration
9 hours
Road
A45 – A45 Eastbound Access From A452
Category
Construction Work
Direction
Eastbound
Reason
Road Improvement Or Upgrading
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Sun, Apr 5, 2026 1:06 PM
Last updated
Tue, May 26, 2026 11:50 PM
Cleared
Wed, May 27, 2026 5:00 AM
  • Latest update: A45 eastbound Stonebridge to River Bridge boundary carraigeway closure
Coordinates
52.446150, -1.686522
Latitude span
52.446143 – 52.446167
Longitude span
-1.686772 – -1.686420
Bounding box centre
52.446155, -1.686596
Location descriptions
  • A45 eastbound access from A452
Feed validity status
Planned
Overall feed start
Tue, May 26, 2026 8:00 PM
Overall feed end
Wed, May 27, 2026 5:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
A45 eastbound access from A452
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A45
Linear Element Model
The Network Model
Linear Element Id
{4E217A8C-0C77-4041-8FC9-580CAAC24129}
Linear Element Type
B Carriageway Entry Slip
From Distance
7 m
To Distance
29 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.446167 -1.686772
52.446145 -1.686447

Segment 2

2 coordinate pairs
Description
A45 eastbound access from A452
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A45
Linear Element Model
The Network Model
Linear Element Id
{F2B315EE-B993-4EE8-A915-52D597D8831C}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
1 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.446145 -1.686447
52.446143 -1.68642
Geometry type
MultiLineString
Geometry points
4
First coordinate pair
-1.686772, 52.446167
Road section segments
1
Road section points
4
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.686772,
                52.446167
            ],
            [
                -1.686447,
                52.446145
            ],
            [
                -1.686447,
                52.446145
            ],
            [
                -1.68642,
                52.446143
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.686772,
            52.446167
        ],
        [
            -1.686447,
            52.446145
        ],
        [
            -1.686447,
            52.446145
        ],
        [
            -1.68642,
            52.446143
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Road Improvement Or Upgrading
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
44
Record created
Sun, Apr 5, 2026 1:06 PM
Record versioned
Tue, May 26, 2026 11:50 PM
Coordinate source
Geometry

Driving on the A45? See every live closure, roadwork and planned restriction on this road.

A45 live closures

Related incidents

Lane closure

Active Roadworks National Highways
Solihull A45 · Roundabout At A45/M42 J6

Expected to clear in 5 months 2 days

Started 12 May 2026, 20:00 Expected clear 17 Nov 2026, 06:00

lane closure

Category: Road Maintenance
View update

Lane 2 and 3 closure southbound

Planned Roadworks National Highways
Solihull M6 · M6 Southbound Between J6 And J5

Starts in 1 hour 29 minutes

Starts 14 Jun 2026, 20:00 Expected clear 15 Jun 2026, 05:00

Lane 2 and 3 closure southbound

Category: Road Maintenance
View update

Lane 3 and 4 closure southbound

Cleared Roadworks National Highways
Solihull M6 · M6 Southbound Between J6 And J5

Cleared 16 hours 15 minutes ago

Started 13 Jun 2026, 20:55 Ended 14 Jun 2026, 02:15

Lane 3 and 4 closure southbound

Category: Road Maintenance
View update

Lanes closures southbound

Cleared Roadworks National Highways
Solihull M42 · M42 Southbound Between J7 And J6

Cleared 22 hours 30 minutes ago

Started 13 Jun 2026, 20:00 Ended 13 Jun 2026, 20:00

Lanes closures southbound

Category: Road Maintenance
View update

M42 southbound Jct 6 between the exit and entry slip roads carriageway closure

Cleared Roadworks National Highways
Solihull M42 · M42 Southbound Within J6

Cleared 22 hours 30 minutes ago

Started 13 Jun 2026, 20:00 Ended 13 Jun 2026, 20:00

M42 southbound Jct 6 between the exit and entry slip roads carriageway closure

Category: Road Maintenance
View update

Lane 3 and 4 closure southbound

Cleared Roadworks National Highways
Solihull M6 · M6 Southbound Between J6 And J5

Cleared 20 hours 55 minutes ago

Started 13 Jun 2026, 20:00 Ended 13 Jun 2026, 21:35

Lane 3 and 4 closure southbound

Category: Road Maintenance
View update