A421 overbridge northwards over M1 lane closure
PlannedA421 overbridge northwards over M1 lane closure
- Start time
- Sat, Aug 15, 2026 7:00 PM
- Expected end
- Sun, Aug 16, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A421 – Connector At M1 J13/A421
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Singlecarriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 5, 2026 10:55 AM
- Last updated
- Sat, Aug 15, 2026 1:24 AM
- Cleared
- Sun, Aug 16, 2026 5:00 AM
- Latest update: A421 overbridge northwards over M1 lane closure
- Coordinates
- 52.026653, -0.603333
- Latitude span
- 52.026534 – 52.026857
- Longitude span
- -0.603393 – -0.603217
- Bounding box centre
- 52.026696, -0.603305
- Location descriptions
-
- connector at M1 J13/A421
- Feed validity status
- Planned
- Overall feed start
- Sat, Aug 15, 2026 7:00 PM
- Overall feed end
- Sun, Aug 16, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- connector at M1 J13/A421
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Both
- Height Grade
- Start2 End2
- Linear Element Road
- A421
- Linear Element Model
- The Network Model
- Linear Element Id
- {6E000327-078C-450C-BF2B-AC98BF3F760B}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 8 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.026606 -0.603362 52.026534 -0.603393
Segment 2
3 coordinate pairs- Description
- connector at M1 J13/A421
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Both
- Height Grade
- Start1 End2
- Linear Element Road
- A421
- Linear Element Model
- The Network Model
- Linear Element Id
- {5C337B7D-E47C-4063-89AA-FE067D66F7BE}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 29 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.026857 -0.603217 52.02666 -0.603331 52.026606 -0.603362
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -0.603362, 52.026606
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.603362,
52.026606
],
[
-0.603393,
52.026534
],
[
-0.603217,
52.026857
],
[
-0.603331,
52.02666
],
[
-0.603362,
52.026606
]
]
]
}
View road section coordinates
[
[
[
-0.603362,
52.026606
],
[
-0.603393,
52.026534
],
[
-0.603217,
52.026857
],
[
-0.603331,
52.02666
],
[
-0.603362,
52.026606
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Aug 5, 2026 10:55 AM
- Record versioned
- Sat, Aug 15, 2026 1:24 AM
- Coordinate source
- Geometry
Driving on the A421? See every live closure, roadwork and planned restriction on this road.
A421 live closuresRelated incidents
M1 circulatory Jct 13 roundabout partial ring management
Cleared Roadworks National HighwaysCleared 1 day 22 hours ago
M1 circulatory Jct 13 roundabout partial ring management
A421 eastbound Marsh Leys to Elstow Interchange mobile lane closures
Cleared Roadworks National HighwaysCleared 2 days 21 hours ago
A421 eastbound Marsh Leys to Elstow Interchange mobile lane closures
A421 eastbound A603 Jct to A4280 Renhold mobile lane closures
Cleared Roadworks National HighwaysCleared 2 days 22 hours ago
A421 eastbound A603 Jct to A4280 Renhold mobile lane closures
A421 eastbound A600 Interchange to Cardington Interchange lane 2 closure
Cleared Roadworks National HighwaysCleared 5 days 23 hours ago
A421 eastbound A600 Interchange to Cardington Interchange lane 2 closure
A421 eastbound A600 Interchange to Cardington Interchange lane 2 closure
Cleared Roadworks National HighwaysCleared 6 days 5 hours ago
A421 eastbound A600 Interchange to Cardington Interchange lane 2 closure
A421 both directions A507 overbridge narrow lanes
Cleared Roadworks National HighwaysCleared 1 week 5 hours ago
A421 both directions A507 overbridge narrow lanes