A42 southbound Jct 13 exit slip road closure
PlannedA42 southbound Jct 13 exit slip road closure
- Start time
- Fri, Oct 16, 2026 7:00 PM
- Expected end
- Sat, Oct 17, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A42 – A42 Southbound Exit For A511
- Category
- Road Maintenance
- Direction
- Southbound
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 21, 2026 10:21 AM
- Last updated
- Thu, Oct 15, 2026 11:51 PM
- Cleared
- Sat, Oct 17, 2026 5:00 AM
- Latest update: A42 southbound Jct 13 exit slip road closure
- Coordinates
- 52.750153, -1.445162
- Latitude span
- 52.749383 – 52.752717
- Longitude span
- -1.445727 – -1.442959
- Bounding box centre
- 52.751050, -1.444343
- Location descriptions
-
- A42 southbound exit for A511
- Roundabout at A42/ A511
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 16, 2026 7:00 PM
- Overall feed end
- Sat, Oct 17, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A42 southbound exit for A511
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A42
- Linear Element Model
- The Network Model
- Linear Element Id
- {78DCF74F-259A-4C4F-B040-0832955530A0}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 414 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.752717 -1.442959 52.751517 -1.444041 52.749933 -1.445439 52.749763 -1.445559 52.7497 -1.445605 52.749556 -1.445681 52.749404 -1.445727
Segment 2
2 coordinate pairs- Description
- Roundabout at A42/ A511
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A511
- Linear Element Model
- The Network Model
- Linear Element Id
- {E91AA1B6-968A-401E-A99F-38D45927CBE7}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 2 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.749404 -1.445727 52.749383 -1.445718
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -1.442959, 52.752717
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.442959,
52.752717
],
[
-1.444041,
52.751517
],
[
-1.445439,
52.749933
],
[
-1.445559,
52.749763
],
[
-1.445605,
52.7497
],
[
-1.445681,
52.749556
],
[
-1.445727,
52.749404
],
[
-1.445727,
52.749404
],
[
-1.445718,
52.749383
]
]
]
}
View road section coordinates
[
[
[
-1.442959,
52.752717
],
[
-1.444041,
52.751517
],
[
-1.445439,
52.749933
],
[
-1.445559,
52.749763
],
[
-1.445605,
52.7497
],
[
-1.445681,
52.749556
],
[
-1.445727,
52.749404
],
[
-1.445727,
52.749404
],
[
-1.445718,
52.749383
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Sep 21, 2026 10:21 AM
- Record versioned
- Thu, Oct 15, 2026 11:51 PM
- Coordinate source
- Geometry
Driving on the A42? See every live closure, roadwork and planned restriction on this road.
A42 live closuresRelated incidents
A42 southbound Jct 13 exit slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 6 minutes
A42 southbound Jct 13 exit slip road closure
Lane closure including roundabout northbound
Planned Roadworks National HighwaysStarts in 4 hours 6 minutes
Lane closure including roundabout northbound
Lay-by closure southbound
Cleared Roadworks National HighwaysCleared 2 hours 53 minutes ago
Lay-by closure southbound
A42 northbound Jct 13 to M1 Jct 23a carriageway closure
Cleared Roadworks National HighwaysCleared 19 hours 53 minutes ago
A42 northbound Jct 13 to M1 Jct 23a carriageway closure
M1 northbound Jct 23a exit slip road closure
Cleared Roadworks National HighwaysCleared 19 hours 53 minutes ago
M1 northbound Jct 23a exit slip road closure
Lane closure northbound
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
Lane closure northbound