A42 lane closure northbound (Site 2)
ClearedA42 lane closure northbound (Site 2)
- Start time
- Tue, Sep 22, 2026 7:00 PM
- Expected end
- Wed, Sep 23, 2026 5:00 AM
- Duration
- 2 seconds
- Road
- A42 – A42 Northbound Between A453 And M1/A453
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 22, 2026 12:56 AM
- Last updated
- Tue, Sep 22, 2026 2:52 AM
- Cleared
- Tue, Sep 22, 2026 7:00 PM
- Latest update: A42 lane closure northbound (Site 2)
- Coordinates
- 52.810733, -1.313141
- Latitude span
- 52.809941 – 52.812010
- Longitude span
- -1.314246 – -1.311448
- Bounding box centre
- 52.810976, -1.312847
- Location descriptions
-
- A42 northbound between A453 and M1/A453
- Feed validity status
- Planned
- Overall feed start
- Tue, Sep 22, 2026 7:00 PM
- Overall feed end
- Wed, Sep 23, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A42 northbound between A453 and M1/A453
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A42
- Linear Element Model
- The Network Model
- Linear Element Id
- {BFE1BB27-46B8-4EAC-8C04-77C972170F94}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 209 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.810535 -1.313374 52.811043 -1.312698 52.81157 -1.312007 52.81201 -1.311448
Segment 2
4 coordinate pairs- Description
- A42 northbound between A453 and M1/A453
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A42
- Linear Element Model
- The Network Model
- Linear Element Id
- {BBC4D5BA-22A6-4601-BDA1-C6C6089459B0}
- Linear Element Type
- A Carriageway
- From Distance
- 1,444 m
- To Distance
- 1,533 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.809941 -1.314246 52.809982 -1.314183 52.810247 -1.313796 52.810535 -1.313374
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.313374, 52.810535
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.313374,
52.810535
],
[
-1.312698,
52.811043
],
[
-1.312007,
52.81157
],
[
-1.311448,
52.81201
],
[
-1.314246,
52.809941
],
[
-1.314183,
52.809982
],
[
-1.313796,
52.810247
],
[
-1.313374,
52.810535
]
]
]
}
View road section coordinates
[
[
[
-1.313374,
52.810535
],
[
-1.312698,
52.811043
],
[
-1.312007,
52.81157
],
[
-1.311448,
52.81201
],
[
-1.314246,
52.809941
],
[
-1.314183,
52.809982
],
[
-1.313796,
52.810247
],
[
-1.313374,
52.810535
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 9
- Record created
- Tue, Sep 22, 2026 12:56 AM
- Record versioned
- Tue, Sep 22, 2026 2:52 AM
- Coordinate source
- Geometry
Driving on the A42? See every live closure, roadwork and planned restriction on this road.
A42 live closuresRelated incidents
Lane 2,3 closure eastbound
Cleared Roadworks National HighwaysCleared 2 days 3 hours ago
Lane 2,3 closure eastbound
Junction 1 EB Exit Slip
Cleared Roadworks National HighwaysCleared 2 days 4 hours ago
Junction 1 EB Exit Slip
Lane 1,2 closure northbound
Cleared Roadworks National HighwaysCleared 3 days 9 hours ago
Lane 1,2 closure northbound
Lane 1,2 closure northbound
Cleared Roadworks National HighwaysCleared 4 days 9 hours ago
Lane 1,2 closure northbound
Lane closure eastbound
Cleared Roadworks National HighwaysCleared 4 days 13 hours ago
Lane closure eastbound
M1 northbound Jct 24 entry slip road lane closure
Cleared Roadworks National HighwaysCleared 4 days 13 hours ago
M1 northbound Jct 24 entry slip road lane closure