A303 westbound Hundred Acre exit slip road closure
ClearedA303 westbound Hundred Acre exit slip road closure
- Start time
- Fri, Nov 6, 2026 9:00 PM
- Expected end
- Sat, Nov 7, 2026 6:00 AM
- Duration
- 9 hours
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Nov 6, 2026 11:12 AM
- Last updated
- Sat, Nov 7, 2026 5:43 AM
- Cleared
- Sat, Nov 7, 2026 6:00 AM
- Latest update: A303 westbound Hundred Acre exit slip road closure
- Feed validity status
- Planned
- Overall feed start
- Fri, Nov 6, 2026 9:00 PM
- Overall feed end
- Sat, Nov 7, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Fri, Nov 6, 2026 11:12 AM
- Record versioned
- Sat, Nov 7, 2026 5:43 AM
Related incidents
A19/A194 Lindisfarne Interchange southbound entry slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 5 minutes
A19/A194 Lindisfarne Interchange southbound entry slip road lane 1 closure
A66 Eastbound Brough to Stainmore Cafe Lane 1 closure with a switch
Planned Roadworks National HighwaysExpected to clear in 1 week 1 day
A66 Eastbound Brough to Stainmore Cafe Lane 1 closure with a switch
Both directions mobile lane closures
Planned Roadworks National HighwaysExpected to clear in 1 hour 5 minutes
Both directions mobile lane closures
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 1 hour 5 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
Planned Roadworks National HighwaysExpected to clear in 1 day 13 hours
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
M53 Southbound lane 3 closure (MP 11/5 to 12/4)
Planned Roadworks National HighwaysExpected to clear in 1 week 4 days
M53 Southbound lane 3 closure (MP 11/5 to 12/4)