A30 Fenny Bridges, B3177 Eastbound on slip
ClearedA30 Fenny Bridges, B3177 Eastbound on slip
- Start time
- Fri, Sep 25, 2026 7:00 PM
- Expected end
- Sat, Sep 26, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A30 – A30 Eastbound Between B3177 And A375
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 24, 2026 3:29 PM
- Last updated
- Sat, Sep 26, 2026 4:38 AM
- Cleared
- Sat, Sep 26, 2026 5:00 AM
- Latest update: A30 Fenny Bridges, B3177 Eastbound on slip
- Coordinates
- 50.783743, -3.244892
- Latitude span
- 50.783547 – 50.783881
- Longitude span
- -3.246348 – -3.244085
- Bounding box centre
- 50.783714, -3.245217
- Location descriptions
-
- A30 eastbound between B3177 and A375
- A30 eastbound access from B3177
- Feed validity status
- Planned
- Overall feed start
- Fri, Sep 25, 2026 7:00 PM
- Overall feed end
- Sat, Sep 26, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- A30 eastbound between B3177 and A375
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {A1C6D25A-ACB7-4A55-8972-99FC87D76446}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 34 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.783782 -3.244553 50.783867 -3.244144 50.783881 -3.244085
Segment 2
4 coordinate pairs- Description
- A30 eastbound access from B3177
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {BF4266B9-CF6C-4106-B1E9-A3BBC19F998F}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.783547 -3.246348 50.783627 -3.245599 50.783714 -3.244963 50.783782 -3.244553
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -3.244553, 50.783782
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-3.244553,
50.783782
],
[
-3.244144,
50.783867
],
[
-3.244085,
50.783881
],
[
-3.246348,
50.783547
],
[
-3.245599,
50.783627
],
[
-3.244963,
50.783714
],
[
-3.244553,
50.783782
]
]
]
}
View road section coordinates
[
[
[
-3.244553,
50.783782
],
[
-3.244144,
50.783867
],
[
-3.244085,
50.783881
],
[
-3.246348,
50.783547
],
[
-3.245599,
50.783627
],
[
-3.244963,
50.783714
],
[
-3.244553,
50.783782
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 24, 2026 3:29 PM
- Record versioned
- Sat, Sep 26, 2026 4:38 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 8 hours 38 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A35 Gapemouth Cnr to George Lane Kilmington 4/5 way traffic lights
Planned Roadworks National HighwaysExpected to clear in 3 weeks 6 days
A35 Gapemouth Cnr to George Lane Kilmington 4/5 way traffic lights
Lane 1 closure
Cleared Roadworks National HighwaysCleared 1 minute 52 seconds ago
lane 1 closure
A30 Eastbound Town Lane to Clockhouse Lane 2 closure
Cleared Roadworks National HighwaysCleared 5 hours 21 minutes ago
A30 Eastbound Town Lane to Clockhouse Lane 2 closure
A35 Gapemouth Cnr to George Lane Kilmington 4/5 way traffic lights
Cleared Roadworks National HighwaysCleared 26 minutes 52 seconds ago
A35 Gapemouth Cnr to George Lane Kilmington 4/5 way traffic lights
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 3 hours 21 minutes ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures