A30 eastbound Pennygillam entry slip road closed
ClearedA30 eastbound Pennygillam entry slip road closed
- Start time
- Thu, May 7, 2026 7:00 PM
- Expected end
- Fri, May 8, 2026 5:00 AM
- Duration
- 10 hours
- Road
- A30 – Connector At A30/A388 Junction
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Singlecarriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, May 6, 2026 9:38 PM
- Last updated
- Thu, May 7, 2026 10:55 AM
- Cleared
- Fri, May 8, 2026 5:00 AM
- Latest update: A30 eastbound Pennygillam entry slip road closed
- Coordinates
- 50.629170, -4.367440
- Latitude span
- 50.628781 – 50.629485
- Longitude span
- -4.368255 – -4.365142
- Bounding box centre
- 50.629133, -4.366699
- Location descriptions
-
- connector at A30/A388 junction
- A30 eastbound access from A388 near Launceston (west)
- Feed validity status
- Planned
- Overall feed start
- Thu, May 7, 2026 7:00 PM
- Overall feed end
- Fri, May 8, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- connector at A30/A388 junction
- Carriageway
- Single Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {FDCEEF79-9FBE-4C79-9819-1D68F424C742}
- Linear Element Type
- Other
- From Distance
- 9 m
- To Distance
- 42 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.629485 -4.367916 50.629446 -4.367921 50.629396 -4.367928 50.629329 -4.367921 50.629281 -4.367897 50.629244 -4.36787 50.629209 -4.367819
Segment 2
8 coordinate pairs- Description
- A30 eastbound access from A388 near Launceston (west)
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {46720E75-0BC4-4945-AD8D-84B5ED9F4226}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 196 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.629209 -4.367819 50.629135 -4.367594 50.629099 -4.367451 50.628972 -4.366792 50.628958 -4.366721 50.628931 -4.36658 50.628829 -4.365613 50.628781 -4.365142
Segment 3
4 coordinate pairs- Description
- A30 eastbound access from A388 near Launceston (west)
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {73EE8359-33D5-42A1-A3E9-41F0DDCA4657}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 6 m
- To Distance
- 28 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.629231 -4.368255 50.629233 -4.368158 50.629236 -4.36802 50.629227 -4.367944
- Geometry type
- MultiLineString
- Geometry points
- 19
- First coordinate pair
- -4.367916, 50.629485
- Road section segments
- 1
- Road section points
- 19
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-4.367916,
50.629485
],
[
-4.367921,
50.629446
],
[
-4.367928,
50.629396
],
[
-4.367921,
50.629329
],
[
-4.367897,
50.629281
],
[
-4.36787,
50.629244
],
[
-4.367819,
50.629209
],
[
-4.367819,
50.629209
],
[
-4.367594,
50.629135
],
[
-4.367451,
50.629099
],
[
-4.366792,
50.628972
],
[
-4.366721,
50.628958
],
[
-4.36658,
50.628931
],
[
-4.365613,
50.628829
],
[
-4.365142,
50.628781
],
[
-4.368255,
50.629231
],
[
-4.368158,
50.629233
],
[
-4.36802,
50.629236
],
[
-4.367944,
50.629227
]
]
]
}
View road section coordinates
[
[
[
-4.367916,
50.629485
],
[
-4.367921,
50.629446
],
[
-4.367928,
50.629396
],
[
-4.367921,
50.629329
],
[
-4.367897,
50.629281
],
[
-4.36787,
50.629244
],
[
-4.367819,
50.629209
],
[
-4.367819,
50.629209
],
[
-4.367594,
50.629135
],
[
-4.367451,
50.629099
],
[
-4.366792,
50.628972
],
[
-4.366721,
50.628958
],
[
-4.36658,
50.628931
],
[
-4.365613,
50.628829
],
[
-4.365142,
50.628781
],
[
-4.368255,
50.629231
],
[
-4.368158,
50.629233
],
[
-4.36802,
50.629236
],
[
-4.367944,
50.629227
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed region label
- Launceston
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, May 6, 2026 9:38 PM
- Record versioned
- Thu, May 7, 2026 10:55 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Westbound Exeter Airport to M5 Jct 29 lane 1, 2 closure
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
A30 Westbound Exeter Airport to M5 Jct 29 lane 1, 2 closure
A30 eastbound Zelah - lane closure (61/0 to 61/5)
Cleared Roadworks National HighwaysCleared 2 days 8 minutes ago
A30 eastbound Zelah - lane closure (61/0 to 61/5)
A38 eastbound Island Shop exit slip carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 10 hours ago
A38 eastbound Island Shop exit slip carriageway closure
A38 eastbound Moorswater to Island Shop lane 1 closure (21/1 to 21/4)
Cleared Roadworks National HighwaysCleared 2 days 11 hours ago
A38 eastbound Moorswater to Island Shop lane 1 closure (21/1 to 21/4)
A30 eastbound Alphington to Ide - lane 2 closure
Cleared Roadworks National HighwaysCleared 2 days 11 hours ago
A30 eastbound Alphington to Ide - lane 2 closure
A30 eastbound Zelah - lane closure (61/0 to 61/5)
Cleared Roadworks National HighwaysCleared 3 days 13 minutes ago
A30 eastbound Zelah - lane closure (61/0 to 61/5)