A30 Eastbound Ide to M5 Jct 31 lane 1 closure 194/6b - 195/8b
PlannedA30 Eastbound Ide to M5 Jct 31 lane 1 closure 194/6b - 195/8b
- Start time
- Thu, Aug 20, 2026 6:00 PM
- Expected end
- Fri, Aug 21, 2026 5:00 AM
- Duration
- 11 hours
- Road
- A30 – A30 Eastbound Between A377 And M5/A38
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 13, 2026 1:05 PM
- Last updated
- Thu, Aug 20, 2026 9:05 AM
- Cleared
- Fri, Aug 21, 2026 5:00 AM
- Latest update: A30 Eastbound Ide to M5 Jct 31 lane 1 closure 194/6b - 195/8b
- Coordinates
- 50.684578, -3.523005
- Latitude span
- 50.681597 – 50.688128
- Longitude span
- -3.531282 – -3.518115
- Bounding box centre
- 50.684863, -3.524699
- Location descriptions
-
- A30 eastbound between A377 and M5/A38
- link road from A30 eastbound to A38 westbound at M5 J31
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 20, 2026 6:00 PM
- Overall feed end
- Fri, Aug 21, 2026 5:00 AM
- Feed window length
- 11 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
21 coordinate pairs- Description
- A30 eastbound between A377 and M5/A38
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {ED756DE4-F92F-4896-BBB9-29489FDDD488}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 972 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.687413 -3.529214 50.686824 -3.527496 50.6864 -3.526222 50.686113 -3.52542 50.685731 -3.524417 50.685304 -3.52337 50.684971 -3.522679 50.684637 -3.52206 50.684532 -3.521872 50.684241 -3.52141 50.683977 -3.520991 50.683959 -3.520963 50.68373 -3.520601 50.683536 -3.520325 50.683218 -3.519862 50.683112 -3.519731 50.68257 -3.519036 50.682466 -3.518904 50.682369 -3.518797 50.682333 -3.518758 50.682094 -3.518509
Segment 2
6 coordinate pairs- Description
- A30 eastbound between A377 and M5/A38
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {B347C9EC-4512-44AF-9615-F5889A15CD7F}
- Linear Element Type
- B Carriageway
- From Distance
- 384 m
- To Distance
- 550 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.688128 -3.531282 50.688121 -3.531261 50.688045 -3.531047 50.687903 -3.530629 50.687777 -3.530259 50.687413 -3.529214
Segment 3
5 coordinate pairs- Description
- link road from A30 eastbound to A38 westbound at M5 J31
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {706E7B6E-9A05-4108-8D56-9595CFBA20D8}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 61 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.682094 -3.518509 50.682067 -3.51848 50.682061 -3.518476 50.681746 -3.518243 50.681597 -3.518115
- Geometry type
- MultiLineString
- Geometry points
- 32
- First coordinate pair
- -3.529214, 50.687413
- Road section segments
- 1
- Road section points
- 32
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-3.529214,
50.687413
],
[
-3.527496,
50.686824
],
[
-3.526222,
50.6864
],
[
-3.52542,
50.686113
],
[
-3.524417,
50.685731
],
[
-3.52337,
50.685304
],
[
-3.522679,
50.684971
],
[
-3.52206,
50.684637
],
[
-3.521872,
50.684532
],
[
-3.52141,
50.684241
],
[
-3.520991,
50.683977
],
[
-3.520963,
50.683959
],
[
-3.520601,
50.68373
],
[
-3.520325,
50.683536
],
[
-3.519862,
50.683218
],
[
-3.519731,
50.683112
],
[
-3.519036,
50.68257
],
[
-3.518904,
50.682466
],
[
-3.518797,
50.682369
],
[
-3.518758,
50.682333
],
[
-3.518509,
50.682094
],
[
-3.531282,
50.688128
],
[
-3.531261,
50.688121
],
[
-3.531047,
50.688045
],
[
-3.530629,
50.687903
],
[
-3.530259,
50.687777
],
[
-3.529214,
50.687413
],
[
-3.518509,
50.682094
],
[
-3.51848,
50.682067
],
[
-3.518476,
50.682061
],
[
-3.518243,
50.681746
],
[
-3.518115,
50.681597
]
]
]
}
View road section coordinates
[
[
[
-3.529214,
50.687413
],
[
-3.527496,
50.686824
],
[
-3.526222,
50.6864
],
[
-3.52542,
50.686113
],
[
-3.524417,
50.685731
],
[
-3.52337,
50.685304
],
[
-3.522679,
50.684971
],
[
-3.52206,
50.684637
],
[
-3.521872,
50.684532
],
[
-3.52141,
50.684241
],
[
-3.520991,
50.683977
],
[
-3.520963,
50.683959
],
[
-3.520601,
50.68373
],
[
-3.520325,
50.683536
],
[
-3.519862,
50.683218
],
[
-3.519731,
50.683112
],
[
-3.519036,
50.68257
],
[
-3.518904,
50.682466
],
[
-3.518797,
50.682369
],
[
-3.518758,
50.682333
],
[
-3.518509,
50.682094
],
[
-3.531282,
50.688128
],
[
-3.531261,
50.688121
],
[
-3.531047,
50.688045
],
[
-3.530629,
50.687903
],
[
-3.530259,
50.687777
],
[
-3.529214,
50.687413
],
[
-3.518509,
50.682094
],
[
-3.51848,
50.682067
],
[
-3.518476,
50.682061
],
[
-3.518243,
50.681746
],
[
-3.518115,
50.681597
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 13, 2026 1:05 PM
- Record versioned
- Thu, Aug 20, 2026 9:05 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 7 hours 31 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 westbound entry slip from A38 carriageway closure
Planned Roadworks National HighwaysStarts in 9 hours 31 minutes
A30 westbound entry slip from A38 carriageway closure
M5 Northbound Jct 31 entry slip road carriageway closure
Planned Roadworks National HighwaysStarts in 9 hours 31 minutes
M5 Northbound Jct 31 entry slip road carriageway closure
M5 Northbound Jct 31 to 30 lane 1,2 closure 261/8b - 259/2b
Planned Roadworks National HighwaysStarts in 9 hours 31 minutes
M5 Northbound Jct 31 to 30 lane 1,2 closure 261/8b - 259/2b
A30 eastbound Meldon to Tongue End lane closure 159/0-161/2
Planned Roadworks National HighwaysStarts in 8 hours 31 minutes
A30 eastbound Meldon to Tongue End lane closure 159/0-161/2
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 7 hours 31 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures