A30 Eastbound Crooked Billet to Clockhouse lane 2 closure
PlannedA30 Eastbound Crooked Billet to Clockhouse lane 2 closure
- Start time
- Tue, Aug 11, 2026 9:00 PM
- Expected end
- Wed, Aug 12, 2026 4:30 AM
- Duration
- 7 hours 30 minutes
- Road
- A30 – A30 Eastbound Between B378 And A315
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Aug 11, 2026 3:49 AM
- Last updated
- Tue, Aug 11, 2026 6:28 AM
- Cleared
- Wed, Aug 12, 2026 4:30 AM
- Latest update: A30 Eastbound Crooked Billet to Clockhouse lane 2 closure
- Coordinates
- 51.442860, -0.474311
- Latitude span
- 51.441967 – 51.443672
- Longitude span
- -0.477938 – -0.470940
- Bounding box centre
- 51.442820, -0.474439
- Location descriptions
-
- A30 eastbound between B378 and A315
- A30 eastbound between A308 and B378
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 11, 2026 9:00 PM
- Overall feed end
- Wed, Aug 12, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A30 eastbound between B378 and A315
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {D78D3E18-E211-4509-A8DA-E430FDDB8E31}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 13 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.442855 -0.474328 51.442872 -0.47427 51.442889 -0.474212 51.442906 -0.474153
Segment 2
7 coordinate pairs- Description
- A30 eastbound between A308 and B378
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {EE4488CD-9EE7-4FF2-A038-61692A3BCCF2}
- Linear Element Type
- B Carriageway
- From Distance
- 614 m
- To Distance
- 884 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.441967 -0.477938 51.44206 -0.477534 51.442308 -0.476519 51.442394 -0.476199 51.442718 -0.474865 51.442796 -0.47456 51.442855 -0.474328
Segment 3
7 coordinate pairs- Description
- A30 eastbound between B378 and A315
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {FE95B094-6870-4DE0-90C7-B254E9AEDB42}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 239 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.442906 -0.474153 51.442941 -0.474037 51.443222 -0.472862 51.443263 -0.472692 51.443316 -0.472471 51.443532 -0.471542 51.443672 -0.47094
- Geometry type
- MultiLineString
- Geometry points
- 18
- First coordinate pair
- -0.474328, 51.442855
- Road section segments
- 1
- Road section points
- 18
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.474328,
51.442855
],
[
-0.47427,
51.442872
],
[
-0.474212,
51.442889
],
[
-0.474153,
51.442906
],
[
-0.477938,
51.441967
],
[
-0.477534,
51.44206
],
[
-0.476519,
51.442308
],
[
-0.476199,
51.442394
],
[
-0.474865,
51.442718
],
[
-0.47456,
51.442796
],
[
-0.474328,
51.442855
],
[
-0.474153,
51.442906
],
[
-0.474037,
51.442941
],
[
-0.472862,
51.443222
],
[
-0.472692,
51.443263
],
[
-0.472471,
51.443316
],
[
-0.471542,
51.443532
],
[
-0.47094,
51.443672
]
]
]
}
View road section coordinates
[
[
[
-0.474328,
51.442855
],
[
-0.47427,
51.442872
],
[
-0.474212,
51.442889
],
[
-0.474153,
51.442906
],
[
-0.477938,
51.441967
],
[
-0.477534,
51.44206
],
[
-0.476519,
51.442308
],
[
-0.476199,
51.442394
],
[
-0.474865,
51.442718
],
[
-0.47456,
51.442796
],
[
-0.474328,
51.442855
],
[
-0.474153,
51.442906
],
[
-0.474037,
51.442941
],
[
-0.472862,
51.443222
],
[
-0.472692,
51.443263
],
[
-0.472471,
51.443316
],
[
-0.471542,
51.443532
],
[
-0.47094,
51.443672
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Aug 11, 2026 3:49 AM
- Record versioned
- Tue, Aug 11, 2026 6:28 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 10 hours 14 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
M3 Eastbound Jct 2 to Jct 1 lane 1 closure
Cleared Roadworks National HighwaysExpected to clear in 21 hours 14 minutes
M3 Eastbound Jct 2 to Jct 1 lane 1 closure
A30 EB Langford to Turks Head Full closure
Planned Roadworks National HighwaysStarts in 12 hours 14 minutes
A30 EB Langford to Turks Head Full closure
A30 eastbound Polyphant to Kennards lane closure 124/1-125/0
Planned Roadworks National HighwaysStarts in 11 hours 14 minutes
A30 eastbound Polyphant to Kennards lane closure 124/1-125/0
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 10 hours 14 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Turks Head to Clapper Lane, mirrored lane 2 closure (East & West bound)
Planned Roadworks National HighwaysStarts in 1 hour 14 minutes
A30 Turks Head to Clapper Lane, mirrored lane 2 closure (East & West bound)